1What FDA tells its investigators to look at.
FDA inspects drug manufacturers under Compliance Program 7356.002, which sorts Part 211 into six systems: quality, facilities and equipment, materials, production, packaging and labeling, and laboratory control. A surveillance inspection normally covers the quality system and at least one other system, and a full inspection at least three others; when each applies, and how long inspections last, are in what to expect during an FDA inspection.1 Four parts of the program decide what a readiness plan puts first:
- The investigator arrives with your file. Before a surveillance inspection, CDER’s Office of Quality Surveillance prepares a site dossier: inspection history, recalls, shortages, customer complaints, foreign regulators’ inspection outcomes, Field Alert Reports and biological product deviation reports, every product made at the site and, where applicable, CGMP elements identified as at risk.1 Read the same file first: your last inspection report and 483, and every recall, shortage and field alert since.
- Some products come first. Investigators are told to consider first “low dose products, narrow therapeutic range drugs, combination products, modified release products, biological products, and new products manufactured under recently approved drug applications”.1 Their batch records, validation and stability data are the ones to check first.
- Procedure, record and practice. For every item a system covers, the site “should have written and approved procedures and documentation resulting therefrom”, and adherence “should be verified through observation whenever possible”.1 So each check below asks for a record or a look at the floor, not only the procedure.
- One system out of control is enough. “If an inspection report documents that one or more of the establishment’s systems are out of control, the inspection should receive an initial OAI classification.” Part V gives examples, such as a pattern of failure to conduct investigations and resolve discrepancies, or a lack of process validation.1 See NAI, VAI and OAI.
FDA’s inspection guides add detail. They are “reference material for investigators and other FDA personnel”, they do not bind FDA, and most of the drug guides date from 1993 and 1994.2 The program says an observation is justified by “the statute and the CGMP regulations”, never by guidance, but that guides “provide interpretations of requirements”.1 The guides and FDA’s inspection manual say where an investigator looks:
| Area | What FDA’s text tells the investigator | Have ready |
|---|---|---|
| Laboratory | “Ask to see results of analyses for lots of product that have failed to meet specifications and review the analysis of lots that have been retested, rejected, or reworked.”3 | The OOS log, with each retested, rejected or reworked lot and who released it |
| Laboratory | “Examine chromatograms and spectra for evidence of impurities, poor technique, or lack of instrument calibration.”3 | The raw data behind each reported result, on the system that holds it |
| Annual review | Of the annual product review: “Review these reports in detail. This report will quickly let you know if the manufacturing process is under control.”4 | The latest annual product review of each product, with its failed lots and their investigations |
| Cleaning | Written cleaning procedures, a general procedure for validating them, protocols written in advance, and “a final validation report which is approved by management”5 | The signed cleaning validation report for each piece of shared equipment |
| Walk-through | Done “as early as possible”, and taking in “areas used for failure investigation, product sampling and testing, product reworks, returned goods, and product quarantine areas”6 | Those areas in order, every container with its status |
2The checklist, most cited section first.
FDA’s electronic inspection tools produced 713 drug 483s in fiscal year 2025, and these are the 15 Part 211 references they cited most.7 Run each check on your own records before an investigator does. The answer linked in each row has the procedure and records in full, and the most common 483 observations has FDA’s wording and three years of counts.
| Cited as | FY2025 | Check before FDA does | Answered in |
|---|---|---|---|
| 211.22(d) | 243 | Quality unit procedures written and followed: take five procedures the quality unit owns and one executed record of each, and compare each record step by step with the version in effect when it was done | 21 CFR 211.22 |
| 211.192 | 236 | Investigations: read the last ten closed deviations and OOS results; each finds a cause the evidence supports, extends to other batches and products that may be affected, and records its conclusion and follow-up | 21 CFR 211.192; deviation report; OOS investigation |
| 211.100(a) | 169 | Production procedures: follow one batch on the floor against its master record; every step Subpart F asks for is written and approved by the quality unit, and, under 211.100(b), done as written | 21 CFR 211.100 |
| 211.160(b) | 121 | Laboratory controls: for each product, check one specification, one sampling plan and one test method are scientifically sound, approved by the quality unit, and the method validated or verified | 21 CFR 211.160 |
| 211.68(b) | 110 | Computer controls: on each GMP computer system, list who can change master production and control records and other records, and confirm each of them is authorized; check that input and output are verified for accuracy and that backups are exact, complete and secure | 21 CFR 211.68; user access review |
| 211.113(b) | 105 | Sterile products only: the written procedures include validation of every aseptic and sterilization process, and each validation is on file | 21 CFR 211.113 |
| 211.67(a) | 95 | Cleaning and maintenance at intervals: compare the logbooks of three pieces of major equipment with their cleaning and maintenance schedules, and find nothing overdue | 21 CFR 211.67; equipment logbooks |
| 211.84(d)(2) | 90 | Suppliers’ certificates: for each component accepted on a supplier’s report of analysis, find your identity test of each lot and the validation of the supplier’s results at its interval | 21 CFR 211.84; reduced testing on a CoA |
| 211.63 | 81 | Equipment design, size and location: each piece suits its use and is placed for operation, cleaning and maintenance, as its installation and operational qualification show | IQ, OQ and PQ |
| 211.67(b) | 78 | Cleaning and maintenance procedures: each names who is responsible, the schedule, the methods, materials and disassembly, removal of the last batch’s identification, protection once clean and the inspection before use; the cleaning and maintenance records sampled show each was followed | 21 CFR 211.67; cleaning validation |
| 211.25(a) | 67 | Training: each person on the batches you sampled was trained in the operations and procedures they performed, and in CGMP on a continuing basis | GMP training |
| 211.166(a) | 61 | Stability: a written program for each product, followed, with its results used for storage conditions and expiry dates | Ongoing stability program |
| 211.22(a) | 53 | Quality unit authority: it approves or rejects components, containers, closures, labeling and drug products, those made under contract included, and reviews production records so that errors are fully investigated; check one contract batch | 21 CFR 211.22; quality agreement |
| 211.110(a) | 48 | In-process controls: written procedures, followed, for tests on samples of each batch that monitor the output and validate the performance of the steps that can cause variability, such as weight variation, mixing and dissolution; under 211.110(b), in-process limits consistent with the final specification | In-process controls |
| 211.165(a) | 44 | Testing and release: each released batch has a result for every final specification, identity and strength of each active ingredient included, before release | Certificate of analysis; batch record review |
Record for each row the records sampled, the result and, for a gap, the CAPA and its date. Run under a written quality assurance program, the checklist is an internal audit: in a routine inspection FDA does not review or copy its report, though it may ask for written certification that the audit was done and its corrective action taken, and the required records behind it stay open.9
3What to have ready, system by system.
In practice the first requests are for lists: which deviations, which batches, which suppliers. Each list leads to records, so keep each one current and know who retrieves its records. Part 211 requires its records to be “readily available for authorized inspection” at the site where the work was done, and records that can be “immediately retrieved” from elsewhere by computer meet that.8
| System | The lists and records to have ready | Answered in |
|---|---|---|
| Quality | Deviation, OOS, complaint, CAPA and change control logs since the last inspection; the latest annual product review of each product; quality agreements with contractors and suppliers; the quality unit’s written responsibilities; risk assessments for hazardous impurities such as nitrosamines; returned and salvaged product; reprocessing and rework approvals | Annual product review; change control; complaint handling; CAPA; reprocessing vs reworking |
| Facilities and equipment | Floor plan and air handling, with how they prevent cross- | Calibration program; cleaning validation; computerized system inventory |
| Materials | Approved suppliers, and whose test results you rely on; receipt, sampling and identity test records by lot; quarantined and rejected materials; water and process gas design, validation and operation; distribution records by lot | Supplier qualification; incoming material release; water system validation; mock recall |
| Production | Master and executed batch records for recent lots of the products FDA picks first; yields; time limits; in-process results; equipment cleaning and use logs; process validation and ongoing statistical evaluation | Batch record contents; process validation; continued process verification |
| Packaging and labeling | Label issuance, examination and reconciliation; packaging records with specimens of the labels used; line clearance; expiry dating | Line clearance; yield and label reconciliation |
| Laboratory control | The OOS log and its investigations; complete analytical records and the raw data behind each reported result, unused data included; method validation or verification; instrument calibration and system suitability; reference standards; reserve samples; the stability program and its results | OOS investigation; orphan data; system suitability; reserve samples |
4The front room and the back room.
No FDA rule asks for either room. The names are industry practice for how most sites run an inspection: a front room where the investigator works with the site’s people, and a back room, out of sight, where requests are logged, fetched, checked and copied. FDA’s own text sets three limits on how they work:
- The front room is not a waiting room. Leaving the investigator “in a conference room without access to necessary documentation or responsible individuals for an unreasonable period of time” is one of FDA’s examples of delaying an inspection.10
- A record is late only for a reason, and for an agreed time. FDA lists translation, records in use in a running operation, a large volume and off-site storage as potentially reasonable explanations, and the delay should be “of a reasonable duration that is agreed upon by the facility and FDA”.10 What to expect during an FDA inspection has a day of a request log kept that way.
- Each inspection day has a meeting. “At minimum, a meeting should be held once each inspection day with firm management to discuss any findings you believe will lead to an observation on a form FDA 483, or a discussion item.”6 What it raises is the back room’s work that evening.
| Role | Where | Does |
|---|---|---|
| Host | Front room | Speaks for the site, usually the head of quality, and attends each daily meeting |
| Subject expert | Front room, when called | Answers for their own process, from the record, and says when they will come back with what they do not know |
| Scribe | Front room | Writes each request word for word with its time, and each question, answer and point raised |
| Escort | With the investigator | Accompanies the investigator on the floor, and calls the back room for records asked for there |
| Back-room lead | Back room | Gives each request a number, an owner and the time agreed, and chases what is open |
| Reviewer | Back room | Checks each record is complete and is the version asked for; withholds only what the law lets the site withhold |
| Copy keeper | Back room | Keeps an identical, numbered copy of everything handed over |
| Runner | Between the rooms | Carries records and messages, so the host never leaves the front room |
A record goes to FDA as it is. What the site may withhold, and what FDA counts as limiting an inspection, such as removing columns from a spreadsheet, are in what to expect during an FDA inspection.
5How it runs in Seal.
In Seal this checklist is a readiness assessment: each requirement is checked against the evidence expected for it, for completeness, currency and retrievability, with its owner, its source and any gap, and an action to close it. Inspection readiness retrieves that evidence from linked records with their history, so a sampled batch record opens with its steps, signatures and deviations, and training and calibration status is evaluated for the date of the work. A mock inspection uses the same request log and package workflow as a real one: simulate the requests, time the retrievals, and the slow or ambiguous ones are the gaps to fix.
Neil can answer an audit evidence request, such as the training behind a sampled batch, by assembling the records behind it and making missing evidence explicit; your team checks scope and completeness before anything is shared.
6The first hour.
FDA usually does not pre-announce routine surveillance or for-cause drug inspections, so the first hour runs on whoever is at reception.10 In the order it happens:
| Step | What FDA’s text says | What the site does |
|---|---|---|
| Arrival | The investigator shows credentials to “the most responsible individual onsite”; management “may examine your credentials and record their number, as well as your name”, but may not photocopy them6 | Reception calls the host and the most senior manager on site at once; record the names and credential numbers |
| Notice | Form FDA 482, Notice of Inspection, is issued on paper or by email as a PDF; it is not required abroad6 | File it, note the time and open the request log |
| Purpose | The investigator explains the purpose of the visit, and should readily accept a management offer of someone to accompany them6 | Write the purpose down as it was said, and offer the escort |
| People missing | At the start of an unannounced inspection, “appropriate personnel are not immediately available to accurately answer the FDA investigator’s questions” is a potentially reasonable explanation; not letting the inspection begin is a denial; at a pre-announced inspection, the necessary people being absent without a reasonable explanation is delay10 | Start with whoever is there and call the rest in; before a pre-announced inspection, confirm each person will be on site |
| Straight to the floor | Following up a complaint that records are not written at the time, for example, an investigator may observe manufacturing “immediately after displaying FDA credentials and issuing the FDA 482”, before the introductory meeting or walk-through6 | The escort goes too; for aseptic areas, gowning follows the documented procedure, which FDA lists as a potentially reasonable explanation for the wait10 |
| Opening meeting | FDA’s manual mentions an introductory meeting and sets no agenda for it; its section on food inspections has it kept “as brief as possible” to get to the walk-through6 | Keep it short: who is who, how requests reach the back room, the daily meeting time, safety and gowning |
| Walk-through | “As early as possible”, failure investigation, sampling and testing, rework, returned goods and quarantine areas included6 | Production keeps running: stopping all manufacturing for the inspection without a reasonable explanation counts as limiting it10 |
7Example: a tablet site runs the checklist.
Invented for illustration: Fairmont Oral Solids, a contract manufacturer of tablets in Ohio. Its last FDA inspection closed in May 2023. In June 2026 it began making a modified-release product under a newly approved application, the kind of product FDA’s program considers first.1 On Monday 7 December 2026 its QA lead runs the checklist on 2026 records, as if FDA came next month.
| Cited as | Sampled | Found | Action and date |
|---|---|---|---|
| 211.22(d) | 5 quality unit procedures, one executed record each | 4 followed; the batch release record still uses a form its procedure retired in March | Old form withdrawn and release records rechecked, 18 December |
| 211.192 | The last 10 closed deviations and OOS results | 3 closed as operator error; 2 of those 3 checked no other batch | Both reopened to assess other batches, 23 December |
| 211.68(b) | 2 chromatography data systems | 1 still has a shared login on an instrument PC | Named accounts, the shared login disabled and its audit trail reviewed, 11 December |
| 211.84(d)(2) | 14 components accepted on suppliers’ reports | 11 with the supplier’s results validated within their interval; 3 last validated in 2023 | Full testing of the next lot of each, by 15 January 2027 |
| 211.25(a) | 12 operators on the sampled batches | All 12 trained on the procedures they used before using them | None |
The four gaps went into CAPA with the dates above. Then the back room ran a drill: a colleague playing the investigator made 20 requests in a morning. 14 records reached the front room within 15 minutes, 5 within an hour, and 1 took 2 hours 40 minutes: the cleaning validation report for the shared granulator, kept in off-site storage. FDA lists off-site storage as a potentially reasonable explanation for more time,10 but Fairmont now keeps a true copy in its document system, which Part 211 allows.8
AQuestions and answers
Can we ask the investigator to wait until our head of quality arrives?
Not at the door. FDA counts not letting an investigator begin the inspection as a denial, and so is refusing to proceed because certain staff are absent, without a reasonable explanation. At the start of an unannounced inspection, though, appropriate people not being immediately available to answer questions accurately is an explanation FDA treats as potentially reasonable. Begin with whoever is there, note what is waiting for whom, and bring the right people in. A pre-announced inspection is different: if the people needed are not there on the agreed date without a reasonable explanation, FDA counts that as delay.
What do front room and back room mean in an FDA inspection?
They are industry terms, not FDA’s. The front room is where the investigator works with the site’s host, subject experts and a scribe. The back room, out of sight, is where a coordinator logs each request, people fetch and check the records, and a copy of everything handed over is kept. FDA asks for neither, but it does count leaving an investigator in a conference room without records or responsible people, for an unreasonable time, as delaying the inspection.
Will FDA read our mock inspection and internal audit reports?
Not in a routine inspection, if the audits are run under a written quality assurance program. FDA’s policy is not to review or copy those reports, though it may ask for written certification that the audits were done and any required corrective action taken. Records the regulations require, such as investigations of product failures and manufacturing errors, stay open to it, and litigation, an inspection warrant or a search warrant can reach the audit reports too.
How far ahead should we start getting ready?
There is no lead time to plan around. FDA usually does not pre-announce routine surveillance or for-cause drug inspections. It does contact the site first for pre-approval and pre-license inspections and most foreign ones, and its manual says a domestic pre-announcement should generally come no less than five calendar days ahead, so that the right records and people are there. Readiness is a state the site keeps: run the checklist on a schedule, after a major change, and again as soon as FDA calls.
Does this checklist work for an API or medical device site?
Only in part. It follows Compliance Program 7356.002 and Part 211, which cover finished drugs. API sites are inspected under program 7356.002F, which uses ICH Q7 as its quality standard, and device sites against the Quality Management System Regulation, which incorporates ISO 13485 and has its own most cited observations.
References10 sources
References
- 1Compliance Program 7356.002, Drug Manufacturing Inspections, FDA, issued 16 September 2022, implemented 17 October 2022, Parts II, III and V. https:/
/ www. fda. gov/ media/ 75167/ download (read 26 November 2026) - 2Inspection Guides, FDA, content current as of 18 February 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- guides (read 26 November 2026) - 3Guide to Inspections of Pharmaceutical Quality Control Laboratories, FDA, July 1993, section 4.A. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- guides/ pharmaceutical- quality- control- labs- 793 (read 26 November 2026) - 4Guide to Inspections of Dosage Form Drug Manufacturers, CGMPRs, FDA, October 1993, Organization and Personnel. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- guides/ dosage- form- drug- manufacturers- cgmps- 1093 (read 26 November 2026) - 5Guide to Inspections, Validation of Cleaning Processes, FDA, July 1993. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- guides/ validation- cleaning- processes- 793 (read 26 November 2026) - 6Investigations Operations Manual 2026, Chapter 5, Inspections, sections 5.1.2, 5.1.4.1, 5.1.4.2.1, 5.2.7, 5.5.1, 5.5.6, 5.5.12.1 and 5.8.1.3, FDA. https:/
/ www. fda. gov/ media/ 166533/ download (read 26 November 2026) - 7Inspection Observations, FY2025 Excel file, Drugs sheet, inspections ending 1 October 2024 to 30 September 2025, FDA, page current as of 16 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- observations (read 26 November 2026) - 821 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, sections 211.22, 211.25, 211.63, 211.67, 211.68, 211.84, 211.100, 211.110, 211.113, 211.160, 211.165, 211.166, 211.180 and 211.192, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 26 November 2026) - 9CPG Sec. 130.300, FDA Access to Results of Quality Assurance Program Audits and Inspections, FDA, released 2 June 2007. https:/
/ www. fda. gov/ regulatory- information/ search- fda- guidance- documents/ cpg- sec- 130300- fda- access- results- quality- assurance- program- audits- and- inspections (read 26 November 2026) - 10Circumstances that Constitute Delaying, Denying, Limiting, or Refusing a Drug or Device Inspection, guidance for industry, revision 1, FDA, June 2024, sections III to V. https:/
/ www. fda. gov/ media/ 86328/ download (read 26 November 2026)