Skip to main content

How do you review a batch record before release, and who has to do it?

In the US, before release, the quality unit reviews and approves every production and control record, packaging and labelling included, and has any unexplained discrepancy, out-of-limit yield or failed specification investigated (21 CFR 211.192); under contract manufacture, the product owner’s quality unit approves or rejects the product. Audit trails are reviewed with the data. In the EU and Great Britain, production reviews and signs first, then a Qualified Person certifies. PIC/S and ICH Q7 let production review non-critical steps.Checked against its sources on 9 November 2026. How these answers are made

Illustration of a seal reading a signed batch certificate marked Released beside a tray of finished cartons.

1Batch record review checklist.

Use this as the reviewer’s checklist, in the order the record is read: as the story of the batch, where a blank is a finding. Each line is tied to the rule it satisfies; drop the EU references if you supply only the US, and the reverse.

CheckWhat to look forSource
Right masterThe record reproduces the current approved master, checked, dated and signed; fields filled on the current template21 CFR 211.188(a);1 PIC/S 8.82
CompleteEvery page and every significant step present, with dates and times of start, key stages and finish; unused fields voided, dated and signed211.188(b);1 EU 4.20(b);3 PIC/S 8.62
Done and checkedWho performed, and who supervised or checked, each significant step; one checker for automated steps; no one checking their own work211.188(b)(11), 211.68(c);1 EU 4.20(c);3 PIC/S 8.82
Sequence and timingEntries made at the time of performance; times run in order across pages; no check timed before the step it verifies211.100(b);1 PIC/S 8.82
MaterialsLot numbers and weights of each component; each addition made by one person and verified by another211.188(b)(3) and (4), 211.101(d);1 EU 4.20(d)3
EquipmentMajor equipment and lines identified; cleaning and use logged; line clearance checked before processing began211.188(b)(2), 211.182;1 EU 4.18(c), 4.20(e);3 EU 5.404
CalibrationBalances, gauges and instruments within calibration on the day they were used211.68(a), 211.160(b)(4);1 EU 3.415
ConditionsProcess and room conditions (time, temperature, humidity, pressure differentials) recorded where the master record requires them, and within limits211.186(b)(9);1 EU 4.18(d), 4.20(e)3
In-process controlsEach result recorded, within limits, with who did it; calculations checked against original data211.188(b)(5);1 EU 4.20(f);3 PIC/S 8.82
YieldsActual yield and percentage of theoretical at each appropriate phase, inside the master record’s limits211.103, 211.186(b)(7), 211.188(b)(7);1 EU 4.20(g)3
Packaging and labelsArea inspected before and after use; containers and closures described; specimens of labelling used; labels and printed packaging reconciled within preset limits211.188(b)(6), (8) and (9), 211.125(c);1 EU 4.21(f) and (h)3
Finished packsPacks examined for the correct label during finishing and a sample checked at the end, with results recorded; EU packs carry the safety features, where appropriate211.134, 211.188(b)(13);1 Annex 16, 1.7.216
SamplingEvery sample taken is recorded211.188(b)(10)1
Sterile productsEnvironmental and personnel monitoring, utility output (HVAC, WFI, steam), alarm reports and filter integrity reviewed for release; each intervention and stoppage recorded with time, duration and operatorsFDA aseptic guidance, XII;7 EU Annex 1, 8.17, 10.108
DeviationsEvery departure recorded and justified; deviation, investigation and OOS reports reviewed with the record211.100(b), 211.192;1 EU 4.20(h);3 ICH Q7 6.729
CorrectionsOriginal readable, initialled and dated; a valid reason and evidence for changes to critical dataPIC/S 8.72
Audit trailsChanges to the record’s electronic data reviewed with the rest of the recordFDA DI Q&A 7 and 8;10 PIC/S 9.62
Laboratory resultsConformance to final specifications, including identity and strength of each active; second-person review of lab records211.165(a), 211.194(a)(8)1
ChangesImpact of any change to manufacture or testing evaluated, with extra checks complete; changed procedures approved by the quality unit211.100(a);1 Annex 16, 1.7.156
Matches the filingFormulation, process and test methods as described in the application or marketing authorisationCP 7346.832;11 Annex 16, 1.7.56
Production sign-offApproval by the person responsible for the operationEU 4.20(i), 4.21(i);3 Chapter 2, 2.712

The record’s required contents are set out on the 21 CFR 211.188 page, and yield and label count calculations on batch yield and reconciliation.

2Who reviews what, and when.

Review is layered: people check the work as it happens, production reviews its record, and the quality unit approves it before release.2

StageWhoWhat happensSource
During each stepThe person checking or supervisingSecond-person checks of significant steps, signed at the time211.188(b)(11);1 PIC/S 8.82
LaboratoryA second personLab records reviewed for accuracy, completeness and compliance211.194(a)(8);1 PIC/S 8.82
After productionAn authorised person in productionProduction records evaluated and signedEU Chapter 2, 2.7;12 ICH Q7 2.39
Before releaseThe quality unitAll production and control records, packaging and labelling included, reviewed and approved211.22(a), 211.192;1 ICH Q7 6.71 (critical steps only)9
Contract manufactureContract site, then product ownerThe site approves or rejects its own work; the owner approves or rejects the product, final release included211.22(a);1 FDA quality agreements guidance13
EU and GB certificationA Qualified PersonBatch certified and recorded in a registerAnnex 16, 1.6 and 1.7;6 HMR Schedule 714

PIC/S says records of non-critical steps are “generally reviewed by production personnel according to an approved procedure”, and ICH Q7 lets “qualified production personnel or other units” review them for APIs.2,9 For US finished drugs, 211.192 still sends all production and control records to the quality unit.1 In the EU, the QP may delegate the checks in Annex 16, 1.7 to trained personnel or third parties, with “on-going assurance that this reliance is well founded”.6

Part 211 sets no deadline, only an order: approval comes “before a batch is released or distributed”.1 Audit trails follow the clock of the data they cover: after each significant step where 211.188(b) applies, and before release.10 Whether a validated system can narrow what a person reads is covered under review by exception.

2.1Contract manufacturing.

Under 21 CFR 211.22(a), “The quality control unit shall be responsible for approving or rejecting drug products manufactured, processed, packed, or held under contract by another company.” FDA’s guidance splits the work: contract facilities approve or reject “the product or results of their manufacturing operations”, and owners approve or reject what the facility makes, “including for final release”.1,13 The agreement cannot move CGMP duties. In one of the guidance’s illustrative cases, a contract site whose batch records left out the addition of reclaimed powder appeared to violate CGMP, although it claimed the records met the quality agreement’s expectations.13

In the EU, the contract giver is responsible for “reviewing and assessing the records and the results related to the outsourced activities”, and makes sure, itself or on the contract acceptor’s QP confirmation, that what it receives was made to GMP and the marketing authorisation.15 Where QPs share a batch, a document agreed by all parties says who assesses the impact of each deviation, and the certifying QP checks the technical agreements are in place.6 The quality agreement should say what the owner receives, and when.

3Example: a completed review record.

This record is invented. Exemplol 50 mg tablets, Batch 26-⁠042, were made from 1 to 9 September 2026 for the US and EU markets. The same batch’s yields and carton count are worked through on the yield and reconciliation page.

Table 3. Invented example. Fifteen days from the end of packaging to QP certification; the carton deviation, open from 9 to 22 September, set the pace.
FieldEntry
RecordeBR for Batch 26-⁠042 on master MBR-⁠EXE-⁠050 version 7, the version effective on 1 September
At packaging8 printed cartons unaccounted for against a preset limit of 3. Production opened deviation DEV-⁠26-⁠0577 at the line on 9 September.
Production reviewAll 14 sections complete and in time order, every check timed after its step, DEV-⁠26-⁠0577 referenced as open; approved by the production manager on 11 September
LaboratoryRelease results approved on 16 September after second-analyst review; all within specification
Finding 1Granulation end time corrected without a reason. Returned to the operator, who added one matching the granulator printout; closed 17 September.
Finding 2Audit trail: the compression operator entered a mean tablet weight of 215.0 mg at 10:40 on 2 September and changed it to 251.0 mg at 10:42, reason “transposed digits”. The balance printout reads 251.0 mg, so the change stands.
Finding 3Change control CC-⁠26-⁠0210, a new carton supplier, first used on this batch: impact assessment approved and the extra first-batch checks complete
DEV-⁠26-⁠0577Cartons found in the line-clearance reject bin and destroyed; Batches 26-⁠039 and 26-⁠040 from the same line checked and balanced. Closed 22 September.
YieldsBlend 98.8%, compression 95.8%, packaging 94.5% of theoretical, each inside its limits
QA dispositionApproved for release on 23 September, with the findings and their closure attached
EU certificationQP certified on 24 September and recorded in the register

The carton count is what inspectors would test: investigated under 211.192, extended to the other batches on the line and, in the EU, “satisfactorily accounted for before release”.1,4 Because production raised it on the day of the count, QA reviewed an investigation, not a surprise.

4What to do with each finding.

The reviewer’s hardest call is what a finding is. The rule that applies decides what happens next.

FindingTreat it asSource
Entry errorA documented correction: original readable, initialled, dated, reason where it matters, verified if criticalPIC/S 8.7;2 see batch record corrections
Step not done as writtenA deviation, recorded and justified; in the EU, with signed authorisation211.100(b);1 EU 4.20(h)3
Out of orderEntries not made at the time, a check timed before its step or an implausible value: a deviation and a data integrity question211.100(b);1 PIC/S 8.82
Yield or label countOutside its limits: an unexplained discrepancy, investigated thoroughly, including other batches, whether or not the batch has shipped211.192, 211.125(c)1
OOS resultAn OOS investigation. A batch that fails its specification is rejected; reprocessed material must meet specification before use211.165(f), 211.192;1 see OOS investigation
Unexplained data changeA data integrity question: compare the audit trail with original data before going onFDA DI Q&A 7;10 PIC/S 8.72
Change used on the batchCheck its impact was evaluated and extra checks done before certificationAnnex 16, 1.7.156

4.1Releasing with an investigation still open.

Part 211 does not mention open investigations at release, but two of its tests are hard to pass with one. The quality unit reviews records to assure that errors “have been fully investigated” (211.22(a)) and approves them before release (211.192), and the investigation continues even if the batch has shipped.1 In the EU, every investigation pertaining to the batch is completed “to a sufficient level to support certification”, and ongoing ones must not “negate the conditions for certification”.6 For APIs, deviation reports are reviewed before release.9

Backlogs are where this breaks. At Genzyme’s Framingham API site, FDA found “approximately 84 open and past due deviation investigations”. Among the firm’s own root causes was “prioritization of investigations associated with lots pending release”. FDA asked for “A complete and final review of each batch and its related information before the QU disposition decision.”16

5What inspectors look for.

FDA’s pre-approval inspection programme, reissued on 29 June 2026, tells investigators to verify that “batch records are consistent with descriptions contained in the CMC section of the application”, and flags “Inconsistent execution of the batch record and manufacturing instructions or operator workarounds (possible indication of poor process design or training).”11

At Intas, a QA employee asked the software vendor to change an electronic batch record outside the audit trail:

“You fail to explain why Quality Assurance did not initiate a deviation upon finding discrepancies or why the batch record contained no comments or remarks about the employee identification change.” Intas Pharmaceuticals Limited, warning letter, 30 March 202617

Portugal’s 2026 statement of non-compliance for Technophage, a maker of investigational bacteriophage products, records the completeness check failing:

“In the batch documentation BPR – 081 relating to batch FP 0481- 25001 of TP-⁠122 PSA Cocktail there were pages not numbered and on those that were numbered, the numbering had been handwritten.” Statement of non-compliance, Technophage, EudraGMDP, 13 July 202618

The Netherlands’ 2026 statement on Belgica De Weerd, which certifies veterinary batches made by contract manufacturers, shows certification failing after production moved to a new one:

“The QP could not make clear against which specifications in the registration dossier the batches were certified since the QP had no access to the registration dossiers.” Statement of non-compliance, Belgica De Weerd B.V., EudraGMDP, 11 August 202619

The same statement records that the QP went on releasing batches after the contract manufacturer’s GMP certificate was withdrawn.19

6FDA, EU and UK differences.

  • Great Britain. The Human Medicines Regulations 2012 make the QP responsible for securing that each batch “has been manufactured and checked in accordance with these Regulations and the requirements of the UK marketing authorisation”.14
  • How far the review reaches. 211.192 tests the record against “all established, approved written procedures”.1 Annex 16 adds the supply chain, audits, consistency with the marketing authorisation, the validated state, stability data and technical agreements.6
  • Electronic certification. Where certification is recorded in a computerised system, Annex 11 asks that only Qualified Persons can certify, by electronic signature.20

7What is changing.

The draft revision of EU GMP Annex 11, consulted on from 7 July to 7 October 2025, would make the timing explicit: “The audit trail review should be conducted prior to batch release, unless the risk of a later detection of any unwarranted changes can be justified.” Reviews that bear directly on release would have to be available to the QP at release.21,22 It is not final: EudraLex still lists the 2011 Annex 11, and EMA’s GMP inspectors working group aims to give the Commission a final text in Q4 2026.23,24 For AI that helps with the review, see AI batch record review.

8How it runs in Seal.

In Seal, batch release runs as a release case that connects batch execution, QC laboratory work, deviation assessment, inventory and certificates of analysis, and gives each requirement an owner, a source and a recorded outcome. Manufacturing, QC and QA can review completed evidence while later activities continue. The disposition records the batch population, evidence reviewed, rationale, conditions and signature meaning; in the EU the QP then certifies.

Estimate how much review time your team spends per year with the free batch review time estimator. Neil, Seal’s AI agent, can prepare a batch for review: it checks execution, LIMS and quality evidence against your batch-review requirements and drafts a source-linked brief with missing evidence requested. QA verifies the evidence and decides disposition; Neil’s summary does not release the batch or replace signatures.

AQuestions and answers

How are batch record reviewers trained?

No regulation sets a separate qualification for reviewers. Like anyone doing GMP work, they need the education, training and experience for the job, in the operations they check and in GMP, with continuing training whose effectiveness is assessed. A sound programme covers the product’s process and master record, the review procedure and data integrity, then has the trainee review records alongside an experienced reviewer, including one seeded with known errors, before signing them off to review alone. Keep the training record, and retrain when the master record or review procedure changes.

What is the difference between batch record review and batch disposition?

Review is the check: reading the executed record, its laboratory results and its investigations against the master record and procedures. Disposition is the decision that follows: the quality unit releases or rejects the batch, and in the EU a Qualified Person must certify it before it is released for sale. A complete review is a precondition for disposition, but the review itself does not release anything.

Can a reviewer correct an entry in a batch record?

Not on someone else’s behalf. Entries are made by the person who did the work, so a reviewer who finds an error returns it to that person or their supervisor, who corrects it with the original still readable, initials, a date and a reason where it matters. The reviewer then checks the correction and the evidence behind it before signing the review.

What should a batch record review SOP include?

Who reviews which sections, including which steps production may review alone; the checklist and the order of review; how audit trails are reviewed; how findings are classed and returned, and when one becomes a deviation; how corrections are verified; how the review is signed; and what must be closed before QA disposition and, in the EU, before QP certification. Contract manufacture adds what the product owner receives and when.

References24 sources

References

  1. 121 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, sections 211.22, 211.68, 211.100, 211.101, 211.103, 211.125, 211.134, 211.160, 211.165, 211.182, 211.186, 211.188, 211.192 and 211.194, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211 (read 8 November 2026)
  2. 2PI 041-⁠1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, sections 8.6, 8.7, 8.8 and 9.6, PIC/S, 1 July 2021. https://picscheme.org/docview/4234 (read 8 November 2026)
  3. 3EudraLex Volume 4, Part I, Chapter 4: Documentation, sections 4.18, 4.20 and 4.21, European Commission, in operation since 30 June 2011. https://health.ec.europa.eu/system/files/2016-11/chapter4_01-2011_en_0.pdf (read 8 November 2026)
  4. 4EudraLex Volume 4, Part I, Chapter 5: Production, sections 5.40 and 5.61, European Commission, in operation since 1 March 2015. https://health.ec.europa.eu/document/download/4a1fdb4f-6f6f-49c4-b264-8056e5bbe078_en?filename=chapter_5.pdf (read 8 November 2026)
  5. 5EudraLex Volume 4, Part I, Chapter 3: Premises and Equipment, section 3.41, European Commission, in operation since 1 March 2015. https://health.ec.europa.eu/system/files/2016-11/chapter_3_0.pdf (read 8 November 2026)
  6. 6EudraLex Volume 4, Annex 16: Certification by a Qualified Person and Batch Release, sections 1.4, 1.6 and 1.7, including 1.7.21, European Commission, 12 October 2015. https://health.ec.europa.eu/system/files/2016-11/v4_an16_201510_en_0.pdf (read 8 November 2026)
  7. 7Sterile Drug Products Produced by Aseptic Processing: Current Good Manufacturing Practice, guidance for industry, section XII, FDA, September 2004. https://www.fda.gov/media/71026/download (read 8 November 2026)
  8. 8EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products, sections 8.17 and 10.10, European Commission, 22 August 2022, in operation since 25 August 2023. https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf (read 8 November 2026)
  9. 9ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, sections 2.3, 6.71 and 6.72, ICH, 10 November 2000. https://database.ich.org/sites/default/files/Q7%20Guideline.pdf (read 8 November 2026)
  10. 10Data Integrity and Compliance With Drug CGMP: Questions and Answers, guidance for industry, questions 7 and 8, FDA, December 2018. https://www.fda.gov/media/119267/download (read 8 November 2026)
  11. 11Compliance Program 7346.832, Preapproval Inspections, objective 2 and part III, FDA, issued 29 June 2026, implemented 10 August 2026. https://www.fda.gov/media/193382/download (read 8 November 2026)
  12. 12EudraLex Volume 4, Part I, Chapter 2: Personnel, section 2.7, European Commission, in operation since 16 February 2014. https://health.ec.europa.eu/system/files/2016-11/2014-03_chapter_2_0.pdf (read 8 November 2026)
  13. 13Contract Manufacturing Arrangements for Drugs: Quality Agreements, guidance for industry, sections III, IV.B.1.a and V.A, FDA, November 2016. https://www.fda.gov/media/86193/download (read 8 November 2026)
  14. 14The Human Medicines Regulations 2012 (SI 2012/1916), Schedule 7, paragraph 12, legislation.gov.uk. https://www.legislation.gov.uk/uksi/2012/1916/schedule/7 (read 8 November 2026)
  15. 15EudraLex Volume 4, Part I, Chapter 7: Outsourced Activities, section 7.8, European Commission, in operation since 31 January 2013. https://health.ec.europa.eu/system/files/2016-11/vol4-chap7_2012-06_en_0.pdf (read 8 November 2026)
  16. 16Warning letter to Sanofi, Genzyme Corporation, Framingham, MARCS-⁠CMS 690604, FDA, 15 January 2025. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/sanofi-690604-01152025 (read 8 November 2026)
  17. 17Warning letter to Intas Pharmaceuticals Limited, MARCS-⁠CMS 721151, FDA, 30 March 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/intas-pharmaceuticals-limited-721151-03302026 (read 8 November 2026)
  18. 18Statement of non-compliance with GMP, Technophage Investigacao E Desenvolvimento Em Biotecnologia S.A., Amadora, report F068/S1/ME/001/2024/NCR, EudraGMDP reference 186348, competent authority of Portugal, 13 July 2026. https://eudragmdp.ema.europa.eu/inspections/gmpc/searchGMPNonCompliance.do (read 8 November 2026)
  19. 19Statement of non-compliance with GMP, Belgica De Weerd B.V., Breda, report V2059716 2026-⁠3152394, EudraGMDP reference 186968, competent authority of the Netherlands, 11 August 2026. https://eudragmdp.ema.europa.eu/inspections/gmpc/searchGMPNonCompliance.do (read 8 November 2026)
  20. 20EudraLex Volume 4, Annex 11: Computerised Systems, section 15, European Commission, in operation since 30 June 2011. https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf (read 8 November 2026)
  21. 21EudraLex Volume 4, Annex 11: Computerised Systems, draft for consultation, sections 12.8 and 12.10, European Commission, July 2025. https://health.ec.europa.eu/document/download/40231f18-e564-4043-94de-c031f813d38b_en?filename=mp_vol4_chap4_annex11_consultation_guideline_en.pdf (read 8 November 2026)
  22. 22Stakeholders’ consultation on EudraLex Volume 4: Chapter 4, Annex 11 and new Annex 22, European Commission, July 2025. https://health.ec.europa.eu/consultations/stakeholders-consultation-eudralex-volume-4-good-manufacturing-practice-guidelines-chapter-4-annex_en (read 8 November 2026)
  23. 23EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 8 November 2026)
  24. 243-year work plan for the GMP/GDP Inspectors Working Group, 2026 to 2028, EMA, 2026. https://www.ema.europa.eu/en/documents/other/3-year-work-plan-inspectors-working-group_en.pdf (read 8 November 2026)

See your process in Seal.