1Continued, ongoing and continuous process verification.
Two terms name one lifecycle activity; the third is an alternative way of validating a process.
| Process verification | Used by | What it is |
|---|---|---|
| Continued | FDA, as Stage 3 | “continual assurance that the process remains in a state of control (the validated state) during commercial manufacture”1 |
| Ongoing | EU GMP Annex 15, PIC/S | The same activity, which Annex 15 says is “also known as continued process verification”2 |
| Continuous | ICH Q8(R2), EMA, Annex 15 | “An alternative approach to process validation in which manufacturing process performance is continuously monitored and evaluated”3 |
Whichever approach first validated the process (traditional, continuous or hybrid), ongoing verification follows: PI 006-4 says the obligation exists “irrespective of which approach was taken”.2,
2What a CPV plan has to contain.
FDA rests Stage 3 on 21 CFR 211.180(e), which requires records kept so their data “can be used for evaluating, at least annually, the quality standards of each drug product”.7 Annex 15 asks for ongoing process verification “under an approved protocol or equivalent documents”, with a report.2 Neither sets a format.
| Plan section | What to write | Source |
|---|---|---|
| Approval | An approved protocol or equivalent, and a report for each period | Annex 15 5.312 |
| Duration | From the end of initial validation until the product is discontinued | PI 006-4 5.6.14 |
| What to trend | Parameters and attributes chosen by risk, with effort scaled to likely variation and harm | PI 006-4 5.6.4;4 ICH Q10 3.2.18 |
| Data | Process trends, incoming materials, in-process material, finished product | FDA Stage 31 |
| Intra- and inter-batch | How variation within and between batches is each examined | FDA Stage 31 |
| Quality-system inputs | Complaints, OOS results, deviations, yields, recalls, adverse events | FDA Stage 3;1 PI 006-4 5.6.44 |
| Sampling | PPQ level until variability can be estimated, then a justified routine level | FDA Stage 3;1 PI 006-4 5.6.24 |
| Statistics | Who designed them, how trends are calculated, Cpk and Ppk wherever possible | FDA Stage 3;1 PI 006-4 5.6.54 |
| Signal rules | Alert and action limits, named run and trend rules, and what each signal triggers | FDA Stage 3;1 Annex 15 5.322 |
| Review | Trained reviewers, quality unit review, meetings with production | FDA Stage 31 |
| Reporting | Period set by risk; a conclusion on the state of control; recommendations | PI 006-4 5.6.54 |
| Plan review | When the extent and frequency of monitoring are reassessed | Annex 15 5.302 |
| Changes | Change control, effect on the validated state, extra sampling | PI 006-4 5.7.1;4 Annex 15 5.322 |
| Product quality review | Reports written so the review can cite them | PI 006-4 5.6.6;4 Annex 15 5.322 |
PI 006-4 says the reporting period “normally should not exceed one year”, shorter for high-volume products or near-term adverse trends.4
2.1Example: deciding what to trend.
Risk assessment sets the list (ICH Q10 3.2.1(a)): PI 006-4 asks it to identify “parameters and material attributes to be closely monitored and trended”, with effort in proportion to “the likelihood of varying CQAs and the level of harm”.8,
| Item | Class | Decision and reason | Source |
|---|---|---|---|
| Culture pH | Critical process parameter | Trended: risk assessment RA-B-07 links it to galactosylation, a CQA | ICH Q8(R2) glossary;3 PI 006-4 5.6.44 |
| Titre | Process performance | Trended for consistency: no CQA link, but a fall in this yield measure signals process variation | FDA Stage 3;1 ICH Q10 3.2.1(d)8 |
| Agitation speed | Non-critical parameter | Not trended: run well inside a proven acceptable range, so unlikely to move a CQA; alarmed and recorded each batch | ICH Q8(R2) glossary;3 PI 006-4 5.6.44 |
| Medium lot | Raw material | Recorded against every result, so a shift can be traced to a lot change | FDA Stage 3;1 ICH Q10 3.2.1(d)8 |
2.2Signal rules.
FDA asks for rules that “guard against overreaction to individual events as well as against failure to detect unintended process variability”.1 A common set, from NIST’s Western Electric and trend rules:9
- One point beyond a 3-sigma control limit: a sudden change.
- Eight in a row on one side of the centre line: a shift in the mean.
- Six in a row steadily rising or falling: a drift.
Every extra rule costs false alarms: on a stable process, the 3-sigma rule alone gives one about every 371 points, and the full Western Electric set, which adds zone rules at 1 and 2 sigma, about one in every 92.9 NIST leaves users to decide “whether this price is worth paying”, so the plan names its rules and what each triggers. Inside the specification, a run or shift calls for investigation and perhaps temporary extra controls; a result out of specification is investigated under 21 CFR 211.192, including other batches it may affect.1,
Where slow drift matters most, a CUSUM chart detects mean shifts of 2 sigma or less better than a Shewhart chart, and an EWMA chart can be made sensitive to “a small or gradual drift”.11,
2.3When there are few batches.
PI 006-4 has three provisions that fit a product made a few times a year: validation-level sampling for higher-risk products “until enough confidence is gathered with respect to process capabilities”, temporary extra controls, most likely needed “when less information about a process is available”, and a longer reporting period “where products are manufactured infrequently”.4 FDA recommends statistics “whenever appropriate and feasible”, among tools “some statistical and others more qualitative”.1 So with eight batches, plot every result against the specification and the PPQ data, give any capability index with its batch count, and state the count at which the plan moves to control charts.
2.4At a CDMO.
When the marketing authorisation holder is not the manufacturer, EU GMP asks for “a technical agreement in place between the various parties that defines their respective responsibilities in producing the product quality review”.13 FDA’s quality agreements guidance lists “Responsibilities for process validation, including design, qualification, and ongoing verification and monitoring”.14 So the agreement names who owns the plan, who runs the statistics, which data the site sends and when, how complaints and recalls reach whoever trends them, and who signs the report.
3Example: a CPV report extract.
This example is invented: the product, batches, documents and results are not real.
| Field | Entry |
|---|---|
| Report | CPV-R-03-26 under plan CPV-P-03: wet-granulated process, version 2, one site |
| Period | 30 batches, E-101 to E-130, made 1 October 2025 to 30 September 2026 |
| Data cut-off | 14 October 2026: release, in-process and quality-system records for all 30 batches |
| Excluded | E-114’s first moisture test, 2.40%: the balance then failed its daily check (LI-26-07). The valid retest, 2.21%, is trended |
| Approved | Head of quality and head of production, 30 October 2026 |
| Item | Type | Limits | Result | Status |
|---|---|---|---|---|
| Assay | CQA, between batches | 95.0 to 105.0% | Mean 100.3%, SD 0.9, Ppk 1.74 | No signal |
| Content uniformity | CQA, within batch | L1 15.0; plan alert: AV over 6.0 | Highest AV 5.3 (E-117) | No signal |
| Granule moisture | In-process control | 1.5 to 3.0%; control 1.75 to 2.65% | Ppk 1.51 to E-121, 2.13 from E-122 | Run of 9 |
| Blend uniformity | Sampling level | PPQ level: 10 locations | 5 locations from E-111 | Reduced |
| Yield | Process performance | Plan alert: under 96.0% | 96.8 to 99.1% | No signal |
| Quality system | Complaints, OOS, deviations | Any linked to the process | 3 deviations, 1 complaint, no OOS; none linked | No signal |
How the figures were worked out:
- Ppk is the distance from the mean to the nearer specification limit over three overall standard deviations. Assay: (105.0 − 100.3) ÷ (3 × 0.9) = 1.74.
- Moisture is reported per cohort, because the mean shifted at E-122. E-101 to E-121: mean 2.18%, SD 0.150, so (2.18 − 1.50) ÷ 0.45 = 1.51. E-122 to E-130: mean 1.98%, SD 0.075, so 0.48 ÷ 0.225 = 2.13. One figure for all 30 batches, 1.29, would mix two processes, and the higher index hides a mean that moved toward the lower limit.
- Cpk uses the short-term standard deviation and describes a process in statistical control; Ppk uses the overall one, which includes shifts and drifts.15 The plan reports Cpk only for a cohort with no open signal.
- Control limits come from a 20-batch baseline fixed in the plan: 3 PPQ batches and E-101 to E-117, mean 2.20%, sigma 0.15 from the average moving range. So 2.20 ± 0.45 gives 1.75 to 2.65%.
- Content uniformity is trended as the acceptance value of each batch’s 10 units, AV = |M − X̄| + ks with k = 2.4. E-117’s mean, 99.6%, lies within 98.5 to 101.5%, so M = X̄ and AV = 2.4 × s = 2.4 × 2.2 = 5.3, against L1 15.0. Unlike RSD, AV also moves when the mean drifts outside 98.5 to 101.5%; the JP, Ph. Eur. and USP chapters are interchangeable on ICH’s conditions.16,
17 - Blend uniformity stayed at 10 locations until review SR-26-02 of the 13 batches from PPQ to E-110 supported 5, a gradual reduction “based on statistical analysis”.4
3.1The signal.
Every moisture result is inside the specification and the control limits. The plan’s second rule flags eight in a row on one side of the centre line. E-122 to E-130 read 2.05, 1.98, 2.10, 1.92, 2.01, 1.88, 2.04, 1.95 and 1.90%.
The run starts with the first batch dried after the inlet air humidity sensor was replaced (WO-26-188): a lead, not a cause. The report records:
- Investigation INV-26-031, starting with the sensor and the drying records.
- No matching shift in assay or content uniformity for E-122 to E-130.
- A temporary control: moisture tested at three points in drying until the investigation closes, as PI 006-4 allows “when an adverse trend is suspected”.4
- The conclusion: in ICH Q10’s sense the process remains in a state of control, because its controls still assure performance and quality; statistically, one signal is open.8 Any change to the drying set point goes through change control, with a new baseline afterwards.4
- A cross-reference for the 2026 annual product review, which can cite the report rather than recompile it.4
4What inspectors look for.
FDA’s pre-approval compliance programme 7346.832, issued on 29 June 2026, tells investigators:
“Though not required at the time of the PAI, the manufacturer is expected to plan for sufficient ongoing evaluation (Stage 3, Continued Process Verification) of the manufacturing process once marketing approval has been granted by CDER.”18
It also lists for follow-up records that “reveal an unexpected highly variable process and the reason is unknown”.18
That programme covers NDAs and ANDAs. For a biologics license application reviewed by CDER, such as one for an antibody, investigators follow 7346.832M, issued on 14 April 2026, which does not mention Stage 3 or a CPV plan. They observe commercial manufacture, under the instruction “Verify that the establishment is capable of manufacturing commercial batches using the validated process that produced the PPQ batches”, and check that the firm trends cell culture performance, “such as cell growth and titer”, and column chromatography “traces, step yields, impurities, and other measures of performance”.19 CBER’s programme for vaccines and cell and gene therapies, 7345.848, dates from 2010 and does not mention Stage 3 either.20
After approval, FDA’s August 2026 letter to a plant making large-volume parenteral bags, after a trend of 35 complaints about leaking bags, asked for:
“Provide a remediated program that provides for ongoing statistical assessment of processing line performance to vigilantly monitor state of control. Specifically, include your program for statistical process control of each batch of drug products manufactured by your firm to monitor intra-batch and inter-batch variation and promptly detect a drift in process control.” Fresenius Medical Care AG & Co. KGaA, Ogden plant, warning letter 320-26-119, 25 August 202621
5What changed in 2026.
- PI 006-4 entered into force on 1 October 2026, replacing PI 006-3 of 2007; section 5.6 covers ongoing process verification.4
- FDA’s pre-approval programme 7346.832 was issued on 29 June 2026 and implemented on 10 August 2026.18
- Annex 15 revision. EMA’s concept paper of 19 January 2026 proposes a targeted revision that extends Annex 15 to active substance manufacturers and “provides guidance on continuous process verification and hybrid approach”; a draft is planned for consultation in December 2026 and publication in April 2028.22 Until then the 2015 text applies.2
6How it runs in Seal.
Seal’s continued process verification blueprint draws trends from the same records the batches and tests ran in, so they stay connected to the batches, process versions, methods and materials behind them. Pending and non-comparable results stay visible outside the analysis, a signal becomes a record with its own review, and the evidence carries into investigation, change control and the annual product quality review. After an approved change, later batches form a new cohort.
Neil prepares the population, calculations and a draft review; for process capability it checks population stability, specification versions and measurement context first, and a qualified reviewer decides the statistical approach. The process validation blueprint carries the controls and residual risks reviewed during PPQ into that monitoring.
AQuestions and answers
Is continued process verification a legal requirement?
In the US it rests on 21 CFR 211.180(e); FDA’s process validation guidance explains how it expects the programme to work, but is not binding. In the EU, Annex 15 expects ongoing process verification for every human medicinal product process, however it was first validated; for veterinary medicines it has been binding since 16 July 2026, under Implementing Regulation (EU) 2025/2091, Annex V. Annex 15 is optional guidance for active substances, and advanced therapy medicinal products follow Part IV of the GMP guide, which asks for critical results to be trended and authorised products reviewed each year.
Is continued process verification the same as the annual product review?
No. Continued or ongoing process verification runs throughout routine manufacture; the product quality review is a periodic, normally annual, look at each product. They feed each other: PIC/S recommends writing verification reports so the product quality review can use them.
Does continued process verification replace revalidation?
PIC/S says ongoing process verification has taken the place of periodic revalidation. Changes to a process are still assessed for their effect on the validated state, and some will need further validation work.
Who should write a CPV plan?
FDA recommends that a statistician, or someone with adequate training in statistical process control, develops the data collection plan and statistical methods. The quality unit reviews the data, and FDA recommends it meets production staff periodically to discuss trends and agree follow-up.
References22 sources
References
- 1Process Validation: General Principles and Practices, Guidance for Industry, FDA, January 2011, sections II and IV.D. https:/
/ www. fda. gov/ media/ 71021/ download (read 8 November 2026) - 2EudraLex Volume 4, Annex 15: Qualification and Validation, European Commission, in operation from 1 October 2015, sections 5.23 to 5.32 and glossary. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2015- 10_ annex15_ 0. pdf (read 8 November 2026) - 3ICH Q8(R2), Pharmaceutical Development, ICH, August 2009, glossary. https:/
/ database. ich. org/ sites/ default/ files/ Q8%28R2%29%20Guideline. pdf (read 8 November 2026) - 4PI 006-4, Recommendations on Qualification and Validation, PIC/S, 1 October 2026, sections 2, 5.5 to 5.7. https:/
/ picscheme. org/ docview/ 11277 (read 8 November 2026) - 5ICH Q13, Continuous Manufacturing of Drug Substances and Drug Products, ICH, 16 November 2022, section 4.7. https:/
/ database. ich. org/ sites/ default/ files/ ICH_ Q13_ Step4_ Guideline_ 2022_ 1116. pdf (read 7 November 2026) - 6Guideline on process validation for finished products: information and data to be provided in regulatory submissions, EMA/
CHMP/ CVMP/ QWP/ BWP/ 70278/ 2012- Rev1,Corr. 1, EMA, 21 November 2016, section 5.2. https:/ / www. ema. europa. eu/ en/ documents/ scientific- guideline/ guideline- process- validation- finished- products- information- and- data- be- provided- regulatory- submissions- revision- 1_ en. pdf (read 7 November 2026) - 721 CFR 211.180(e), General requirements, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 180 (read 7 November 2026) - 8ICH Q10, Pharmaceutical Quality System, ICH, 4 June 2008, sections 3.2.1 and 5 (glossary). https:/
/ database. ich. org/ sites/ default/ files/ Q10%20Guideline. pdf (read 9 November 2026) - 9NIST/SEMATECH e-Handbook of Statistical Methods, section 6.3.2, What are Variables Control Charts?, National Institute of Standards and Technology. https:/
/ www. itl. nist. gov/ div898/ handbook/ pmc/ section3/ pmc32. htm (read 9 November 2026) - 1021 CFR 211.192, Production record review, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 192 (read 8 November 2026) - 11NIST/SEMATECH e-Handbook of Statistical Methods, section 6.3.2.3, CUSUM Control Charts, National Institute of Standards and Technology. https:/
/ www. itl. nist. gov/ div898/ handbook/ pmc/ section3/ pmc323. htm (read 9 November 2026) - 12NIST/SEMATECH e-Handbook of Statistical Methods, section 6.3.2.4, EWMA Control Charts, National Institute of Standards and Technology. https:/
/ www. itl. nist. gov/ div898/ handbook/ pmc/ section3/ pmc324. htm (read 9 November 2026) - 13EudraLex Volume 4, Part I, Chapter 1: Pharmaceutical Quality System, European Commission, in operation since 31 January 2013, section 1.11. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ vol4- chap1_ 2013- 01_ en_ 0. pdf (read 7 November 2026) - 14Contract Manufacturing Arrangements for Drugs: Quality Agreements, Guidance for Industry, FDA, November 2016, section IV. https:/
/ www. fda. gov/ media/ 86193/ download (read 7 November 2026) - 15ASTM E2281-15(2020), Standard Practice for Process Capability and Performance Measurement, ASTM International, section 4. https:/
/ www. astm. org/ e2281- 15r20. html (read 7 November 2026) - 16The Japanese Pharmacopoeia, Eighteenth Edition, General Tests 6.02 Uniformity of Dosage Units, Ministry of Health, Labour and Welfare, Table 6.02-2. https:/
/ www. mhlw. go. jp/ content/ 11120000/ 000945683. pdf (read 7 November 2026) - 17ICH Q4B Annex 6, Uniformity of Dosage Units General Chapter, ICH, 13 November 2013, section 2.1. https:/
/ database. ich. org/ sites/ default/ files/ Q4B%20Annex%206%20Guideline. pdf (read 7 November 2026) - 18Compliance Program 7346.832, Preapproval Inspections, FDA, issued 29 June 2026, implementation date 10 August 2026. https:/
/ www. fda. gov/ media/ 193382/ download (read 9 November 2026) - 19Compliance Program 7346.832M, Prelicense and Preapproval Inspections of CDER-Regulated Biological Product Manufacturers, FDA, issued 14 April 2026, implementation date 14 May 2026, full text searched. https:/
/ www. fda. gov/ media/ 191983/ download (read 9 November 2026) - 20Compliance Program 7345.848, Inspection of Biological Drug Products (CBER), FDA, implementation date 1 October 2010, full text searched. https:/
/ www. fda. gov/ media/ 73834/ download (read 9 November 2026) - 21Fresenius Medical Care AG & Co. KGaA (Fresenius USA Manufacturing, Inc. dba Fresenius Medical Care North America Ogden Plant), warning letter 320-26-119, MARCS-CMS 730319, FDA, 25 August 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ fresenius- medical- care- ag- co- kgaa- 730319- 08252026 (read 7 November 2026) - 22Concept paper on the revision of the guidelines on Good Manufacturing Practice for medicinal products, Annex 15, Qualification and Validation, EMA/
INS/ GMP/ 163466/ 2026, EMA GMP/GDP Inspectors Working Group, 19 January 2026. https:/ / www. ema. europa. eu/ system/ files/ documents/ scientific- guideline/ concept- paper- annex- 15_ revised- timetable- en. pdf (read 7 November 2026)
