What is an FDA pre-approval inspection (PAI), and how do you prepare for one?

A pre-approval inspection (PAI) is FDA’s on-site check of a facility named in a pending application; for an original BLA it is called a pre-license inspection. For NDAs and ANDAs, CP 7346.832 covers commercial readiness, conformance to the application, data integrity and commitment to quality in development. For CDER biologics, CP 7346.832M covers application commitments, CGMP and data integrity. Prepare by tracing every filed claim to site records. At CDER it ends in an approve or withhold recommendation.Checked against its sources on 26 November 2026. How these answers are made

Illustration of a seal beside an open evidence folio containing SOP, training and execution records.

1Which inspection you face, and who runs it.

A pre-approval inspection (PAI) checks that each establishment named in an application “can perform the proposed manufacturing operations in conformance with CGMP requirements and that data submitted in the application are accurate and complete”.1 An original BLA gets a pre-license inspection (PLI) instead, and a biologic supplement with a significant manufacturing change a PAI.2,3

Table 1. The three paths through a pre-approval or pre-license inspection.
NDA or ANDACDER biologic: BLA or supplementCBER product: BLA or supplement
ProgramCP 7346.832, issued 29 June 2026, implemented 10 August 20261CP 7346.832M, issued 14 April 2026, implemented 14 May 20262CP 7345.848, implemented 1 October 2010, with SOPP 8410 on whether to inspect3,4
Who leadsThe Office of Inspections and Investigations (OII), with CDER when appropriate1CDER, typically an Office of Pharmaceutical Manufacturing Assessment (OPMA) lead, with OII when needed2A CBER inspector with a product specialist3
NoticeOriginal NDA: a goal of at least 60 days’ notice when FDA needs to see the product made; no such goal for ANDAs or supplements1,5Original BLA: the same goal, under PDUFA or, for a biosimilar, BsUFA2,5,6Original BLA: the same goal.5 Performed when the establishment is in operation3

See also NDA, ANDA and BLA. Three terms recur below:

  • Biobatch: “The lot of drug product formulated for purposes of pharmacokinetic evaluation in a bioavailability/bioequivalency study.”7
  • Exhibit batch: a batch whose executed record and yields are filed in the ANDA; the largest commercial run filed should be “no more than 10 times the exhibit batch(es)”.8
  • Profile class: FDA’s code for a category of product a site makes, such as TCM (tablets, prompt release). A PAI adds one only if it ends no action or voluntary action indicated (NAI, VAI) with an approve recommendation.9,1

2PAI readiness checklist.

Rows are suggestions; Basis gives the program objective each serves.

2.1NDA or ANDA checklist.

Every PAI covers Objectives 1a (development history), 1e (the commercial process), 2 (conformance) and 3 (the data integrity audit). Objectives 1b to 1d go by risk: a site or building never inspected, new equipment or a product needing special containment can bring 1c, and no prior coverage 1d. Objective 4 applies to an initial PAI, then by risk.1

Table 2. A PAI readiness checklist for an NDA or ANDA, objective by objective.
AreaHave ready, and what good looks likeBasis
Development historyUnexpected results for exhibit, bio and validation batches, and method transfer discrepancies, each investigated to a defensible conclusion1a1
Sampling and suppliersSampling plans whose sample numbers, statistical criteria and quality limits are scientifically based; supplier variability judged against your specifications1b1
Contamination controlFloor plans and as-built utility drawings; cleaning, maintenance and utility controls; a cross-contamination assessment for new equipment or a highly potent product1c1
Release and changeRelease, change and investigation procedures, with marketed-product failures, deviations and complaints showing them followed; change control that assesses new or revised established conditions1d1
Commercial processA specific master batch record an operator can run without workarounds; Stage 1 data; scale-up from the biobatch; PPQ timeline, protocols and results, ready for a full audit1e1
ConformanceBatch sizes, batch records, methods and API source, in a conformance record with no open gap21
Biobatch authenticityShipping, equipment use, inventory and test records that tie to the filing without a missing day21
ImpuritiesA hazardous impurity risk assessment, nitrosamines included, that justifies controls and limits21
Raw dataComplete sequences behind filed results; any result not reported justified in writing31
Development programRoles, QA oversight and risk assessments, dated before the decisions they support41
Samples, if requestedFor solid oral: 20 units, 2 to 5 g of API, 2 g of each excipient, the biobatch record and methods, packed and logged in advanceAttachment D1

2.2BLA checklist.

From CP 7346.832M: Objective 1 covers six systems, 1a to 1f, and Objective 2 is the data integrity audit. A CBER sponsor can borrow it.2

Table 3. A BLA readiness checklist, objective by objective.
AreaHave ready, and what good looks likeBasis
Contract agreementsA written agreement with each CMO and testing laboratory covering investigations, CAPAs, disposition, notice of deviations and on-site audits1a(d)2
Facilities and utilitiesPersonnel, material and product flows; area classifications; HEPA filters recertified at least annually; water and clean steam to specification; pre- and post-viral operations segregated or otherwise controlled1b(a)2
Cell banksVial use records and freezer logs tracing each working cell bank vial to a campaign; failures checked against the bank; a resupply procedure1c(d)2
PPQEvery campaign, failed ones included, reported in the application; pending changes listed1d(a)2
Ranges and hold timesBatch records within filed values, or the difference reported to FDA1d(c)2
ChromatographyTrends of traces, yields and impurities; resins product-dedicated, as filed, within validated lifetimes1d(i)2
Reference standardsSource, inventory and requalification as filed; new ones qualified under an approved protocol1e(e)2
Packaging and shippingLabels reconciled and discrepancies investigated; each filled lot identity-tested after labeling; storage temperature records; shipment by the validated process filed1f2
Data audit subsetRaw data behind process validation, release and stability results, and potency method validation, matching filed summaries with reviewable audit trails22

3PAI timeline, from readiness to recommendation.

FDA sets no preparation schedule. This suggested plan counts back from submission, when CP 7346.832M expects a site “ready for an inspection at the time of application submission”;2 the 12-month start and the mock follow NSF’s advisers, who count from the inspection itself.10

3.1The readiness plan.

Table 4. A suggested PAI readiness plan, counted from submission.
WhenActionBasis
12 months beforeCheck every claim the application will make against site records, in a conformance record (example below)10,1
9 monthsAudit, back to raw data, the stability, dissolution, content uniformity and impurity data to be filed (example below)1
6 monthsJustify each critical process parameter and the PPQ sampling plan from raw development data (quality by design); list open CAPAs1
3 to 6 monthsMock inspection: a front room hosting the audit, a back room finding documents, floor interviews10
At submissionEvery facility listed; each site ready or, for an ANDA, Form 356h says it is not5,11
BLA, after filingPlan a campaign to overlap FDA’s window: it expects the site, in general, “to be operational and manufacturing the complete product”2
BLA, in reviewLog each information request: inspectors audit “data with issues or risks identified during the application assessment”2

3.2After submission: an example timeline.

Example. An invented original NDA for a new molecular entity, standard review, received on Monday 15 March 2027.

Table 5. Example: a PAI timeline for a standard NME NDA.
DateWhat happensRule
Friday 14 May 2027Day 60: OPMA has asked OII for a PAI or entered a facility recommendation1,5
By Thursday 15 July 2027FDA tells the site it intends to inspect, if it needs to see the product being madeNotice goal: at least 60 days before the PAI, no later than midcycle1,5
13 to 17 September 2027The PAI; a Form 483 at the close
Friday 8 October 2027Business day 15: the response date FDA’s March 2026 draft guidance recommends12
Monday 18 October 2027Business day 20, skipping Columbus Day: last day for the program manager’s recommendation1,13
Saturday 15 January 2028Goal for completing GMP inspections10 months from receipt5
Tuesday 14 March 2028Goal for FDA’s action10 months from filing5

For a priority NME NDA or original BLA, the inspection goal is 6 months.5 For an original 351(k) biosimilar BLA, BsUFA III aims to finish inspections within 10 months of receipt.6 An ANDA’s GDUFA III action goal is 10 months for a standard original, 15 if Form 356h says a site is not ready.11

4During the inspection, and at a CDMO.

Pace matters: records produced late without reasonable explanation, an investigator left without documents or people “for an unreasonable period of time”, or staff missing on an agreed date can each count as delay.14 Log each request verbatim with its owner and delivery time, and let the people who did the work answer from the records: FDA may interview key employees, “such as the lead validation engineer”.1 Open an investigation the day an item looks headed for the 483: FDA’s March 2026 draft guidance recommends a response within 15 business days, and CP 7346.832M already asks that of CDER biologic sites.12,2 See also what to expect in an FDA inspection.

At a CDMO, a suggested split: the sponsor owns the conformance record and the CDMO supplies the records behind it. FDA says a quality agreement should set expectations for FDA inspections, pre-approval included,15 so settle raw data access, a joint mock and sponsor attendance there; see quality agreements.

5Examples: a conformance record and a traced result.

Example: rows from two conformance records, one per application, for invented ANDA Product X tablets (exhibit Batch 25-⁠017) and BLA Product Y.

Table 6. Example: conformance record rows.8,1
SectionFiled claimSite recordResultAction
X: 3.2.R.1.P.1Batch 25-⁠017: 98,640 of 100,000 tabletsExecuted batch record and yield reconciliation: 98,640MatchNone
X: 3.2.P.3.3Compression force 9 to 10 kNMaster record allows 8 to 11 kNGapAlign the record by change control; assess batches run outside 9 to 10 kN
X: 3.2.P.5.2Assay method TM-⁠204, version 3Laboratory uses version 4 since February 2026GapAssess the change; amend the application if needed
Y: 3.2.S.2.53 PPQ campaigns, none failedCampaign log: 4 started, 3 passed, 1 failed at harvestGapReport it: FDA verifies that “all failed campaigns” were filed2

FDA separates factual integrity, raw data matching what was filed, from contextual integrity, surrounding records supporting it.1 Suppose Product X’s application reports Batch 25-⁠017 assay as 99.6%.

Table 7. Example: tracing a filed assay result back to its audit trail.
StepRecordWhat it proves
SummaryAssay 99.6% in 3.2.P.5.4The claim
Calculation(1,245,000 ÷ 1,250,000) × (0.1002 ÷ 0.1000) × 99.8 = 99.6, from peak areas, weights and standard purityFactual integrity
ChromatogramSample and standard injections match the areas usedFactual integrity
Full sequenceEvery injection, blanks and system suitability included; none unexplainedContextual integrity
Audit trailNo reprocessing or deletion without a recorded reasonContextual integrity

6Scheduling calls, and how a failed PAI reads.

Table 8. Scheduling decisions, and the rule behind each.
SituationWhat the rules sayBasis
One campaign a monthAsk for a date when manufacturing will occur; FDA accommodates scheduled campaigns “where appropriate”14
Not ready (NDA, ANDA)Send “a written explanation and the date when it will be available for inspection”; lack of capacity is a withhold criterion1
BLA schedule slipsSend a written explanation and a new schedule at once: the product must be “available for inspection during all phases of manufacture”2,16
A site added lateFDA may have no time to inspect it this cycle; an unlisted site can move the goal date three months17,5

An NDA held up by a site that was not ready:

Our field investigator could not complete inspection of the Sharp Clinical Services, Inc., (FEI# 3003673570) manufacturing facility at 2400 Baglyos Circle, Bethlehem, PA, USA, 18020, because the facility was not ready for inspection. Satisfactory inspection is required before this application may be approved.

Acer Therapeutics Inc., NDA 214860, 15 June 2022.18

And after a PLI found data reliability concerns:

For resolution, we recommend you engage with an independent third party to develop a protocol for, and conduct, a comprehensive assessment on the impacted information and data submitted in your application to justify the acceptability of using these data and information to support licensure.

Eli Lilly and Company, BLA 761306, 28 September 2023.19

7Will FDA inspect your site?

For an NDA or ANDA, CDER’s integrated quality assessment (IQA) team decides from cumulative risk. If profile class status, compliance history, the product, operations and hazard signals already support the objectives, there is no PAI. If not, it may use alternative tools (a Mutual Recognition Agreement partner’s report, a records request or a remote interactive evaluation) where risk allows and they collect enough; otherwise it inspects.1,20

For a BLA, a license issues “only after inspection of the establishment(s) listed in the biologics license application”,16 though CP 7346.832M lets the IQA team decide,2 so plan on a PLI for a site new to FDA or to that profile class. Under CBER’s SOPP 8410, a new facility or suite, or a significant manufacturing change, generally gets one; an approved site recently inspected without an official action indicated outcome, taking on no significant new step, typically gets a waiver.4

8From 483 to recommendation.

For a CDER biologic, “solely application assessment issues are not included on Form FDA 483”, so a clean close is not a clean review.2 For the 483 itself, see Form 483 and how to respond.

Table 9. Approve and withhold, from Part V of the program.1
RecommendationWhen it applies
ApproveNo significant issues would adversely affect the site’s ability to perform the functions described
WithholdSignificant data integrity problems; serious CGMP concerns with key batches; incomplete master instructions; no capacity; unmet commitments; failed method validation or stability; unreported failing data; failed PPQ without changes; delaying or limiting the inspection

A PAI can grow: OII may add a CP 7356.002 surveillance inspection, and spreading data reliability problems can lead to a recommendation that CDER “consider invoking the Application Integrity Policy (AIP)”.1

9How the EU and MHRA differ.

Table 10. Pre-approval GMP inspections in the EU and at MHRA.
EU centralized procedureMHRA
When it inspectsEEA sites normally not, unless product or process issues arise; others normally, unless an EEA or MRA authority inspected similar products in 2 to 3 years21Product-related GMP inspections while it assesses a UK marketing authorization application; EEA outcomes recognized22
NoticeSites “inspection ready” at submission; EMA writes with date and scope21“We tell you about this inspection in advance”22
FindingsDraft report in 15 days; comments in a further 1521A post-inspection letter; reply by email22
OutcomeReport by Day 181, or Day 121 for a product or process inspection; a non-compliance statement blocks a positive opinion21An accepted response brings a GMP certificate22

10What changed in 2025 and 2026, and what to do.

  • 4 September 2025: FDA began releasing complete response letters promptly, so a facility failure may become public.23
  • April and June 2026: CDER biologics got their own program, CP 7346.832M, and CP 7346.832 replaced its 2022 text. 483 responses now go to OPMA, not an ORA division, and OPMA makes the final call on approvals as well as withholds: update SOPs naming the old route.2,1,24
  • August 2026: the proposed PDUFA VIII letter proposes facility readiness guidance, a CMC facility pre-submission meeting 3 to 6 months before submission and post-⁠PAI meetings; GDUFA IV’s proposal adds post-⁠PAI meetings. Neither is in force.25,26

11How it runs in Seal.

A PAI asks whether the filed CMC content matches the site’s records and whether the raw data behind it hold up. In Seal’s inspection readiness workflow, a readiness assessment lists, for each requirement, the expected evidence, its owner and source, and any known gap, with an action to close it. During the inspection each request keeps its verbatim wording, agreed interpretation, owner and the evidence delivered, each delivered package keeps its source record versions, and observations become commitments linked to CAPA and verification. Neil can prepare a commitment evidence review that maps each commitment to its completion evidence; regulatory and quality owners approve any external response.

In Seal’s regulatory submissions workflow, each section keeps the studies, batches and results it rests on, with missing evidence and exclusions recorded, so an authority question is answered from the same sources as the original content. Commitments made to an authority keep their due date, owner, required evidence and fulfillment status.

AQuestions and answers

Are clinical and bioequivalence sites inspected before approval too?

Yes, but not in the PAI itself. FDA’s Bioresearch Monitoring program inspects them under its own compliance programs, such as 7348.003 and 7348.004 for the clinical and analytical sides of bioequivalence studies. For new molecular entity NDAs and original BLAs, FDA’s goal is to finish clinical (GCP), nonclinical laboratory (GLP) and manufacturing (GMP) inspections within 10 months of receipt for a standard review and 6 months for a priority one. The PAI still checks that the biobatch and the samples FDA receives are genuine.

Is a pre-approval inspection announced in advance?

Often, though FDA need not. For an original NDA or BLA where FDA needs to see the product being made, its goal is to tell you at least 60 days ahead. Otherwise FDA’s inspection manual leaves pre-announcing a drug inspection to the inspecting division; when it does, notice is generally at least five calendar days, so that the right records and people are there, and it is not an appointment. Foreign inspections qualify for notice, except for-cause ones and those in FDA’s unannounced foreign inspection pilot. Asking for a later start without a reasonable explanation can count as delay.

Does process validation have to be finished before a PAI?

Usually not for an NDA or ANDA. FDA does not withhold their approval solely because commercial-scale process validation is incomplete at the time of the inspection, though at least Stage 1 data should be available, and the firm must reach a high degree of assurance that the process consistently makes product meeting its quality attributes before it distributes the product. Aseptic filling and sterilization are the exception: FDA requires data filed to show those processes are validated before approval. A CDER biologic is different: process validation data are assessed in the application, and inspectors check that every failed PPQ campaign was reported.

What is the difference between a PAI and a pre-license inspection?

A pre-license inspection supports an original BLA. A PAI supports an NDA or ANDA and, for biologics, a supplement with a significant manufacturing change, under both CDER’s Compliance Program 7346.832M and CBER’s 7345.848. NDA and ANDA inspections follow Compliance Program 7346.832.

Do medical devices get pre-approval inspections?

Yes, for premarket approval applications. FDA issues the inspection assignment once the application shows that design, development and manufacturing are adequately documented. FDA expects the facility to comply with the Quality Management System Regulation, and CDRH should consider withholding approval if the inspection finds deficiencies affecting the device under review that meet the program’s Situation 1 criteria.

How long does a pre-approval inspection last?

Neither CDER program sets a length. Coverage decides it: an NDA or ANDA inspection always covers development history, the commercial process, conformance to the application and a data integrity audit, and for a biologic FDA schedules the visit around operations it considers relatively high risk, using the manufacturing schedule you supply. Any figure quoted in days is experience, not a rule, so keep subject experts available until the closing meeting.

References26 sources

References

  1. 1Compliance Program 7346.832, Preapproval Inspections, FDA, issued 29 June 2026. https://www.fda.gov/media/193382/download (read 26 November 2026)
  2. 2Compliance Program 7346.832M, Prelicense and Preapproval Inspections of CDER-⁠Regulated Biological Product Manufacturers, FDA, issued 14 April 2026. https://www.fda.gov/media/191983/download (read 26 November 2026)
  3. 3Compliance Program 7345.848, Inspection of Biological Drug Products, FDA, implemented 1 October 2010. https://www.fda.gov/media/73834/download (read 26 November 2026)
  4. 4SOPP 8410, Determining When Pre-License/Pre-Approval Inspections Are Necessary, version 4, CBER, FDA, effective 6 January 2020. https://www.fda.gov/media/108969/download (read 26 November 2026)
  5. 5PDUFA Reauthorization Performance Goals and Procedures, Fiscal Years 2023 Through 2027, FDA. https://www.fda.gov/media/151712/download (read 26 November 2026)
  6. 6Biosimilar Biological Product Reauthorization Performance Goals and Procedures, Fiscal Years 2023 Through 2027, FDA. https://www.fda.gov/media/152279/download (read 26 November 2026)
  7. 7SUPAC-⁠MR: Modified Release Solid Oral Dosage Forms, guidance for industry, FDA, September 1997, glossary. https://www.fda.gov/media/70956/download (read 26 November 2026)
  8. 8ANDA Submissions: Content and Format, guidance for industry, Revision 1, FDA, June 2019, sections 3.2.P.3 and 3.2.R. https://www.fda.gov/media/128127/download (read 26 November 2026)
  9. 9Investigations Operations Manual 2026, Chapter 5, Inspections, section 5-⁠14.7, FDA. https://www.fda.gov/media/166533/download (read 26 November 2026)
  10. 10FDA inspection readiness: How to prepare for surveillance and pre-approval inspections, Manufacturing Chemist, with NSF. https://manufacturingchemist.com/fda-inspection-readiness-how-to-prepare-for-surveillance (read 26 November 2026)
  11. 11GDUFA Reauthorization Performance Goals and Program Enhancements, Fiscal Years 2023 to 2027, FDA. https://www.fda.gov/media/153631/download (read 26 November 2026)
  12. 12Responding to FDA Form 483 Observations at the Conclusion of a Drug CGMP Inspection, draft guidance for industry, FDA, March 2026. https://www.fda.gov/media/191427/download (read 26 November 2026)
  13. 135 U.S.C. 6103, Holidays, United States Code, govinfo. https://www.govinfo.gov/content/pkg/USCODE-2023-title5/html/USCODE-2023-title5-partIII-subpartE-chap61-subchapI-sec6103.htm (read 26 November 2026)
  14. 14Circumstances that Constitute Delaying, Denying, Limiting, or Refusing a Drug or Device Inspection, guidance for industry, Revision 1, FDA, June 2024. https://www.fda.gov/media/86328/download (read 26 November 2026)
  15. 15Contract Manufacturing Arrangements for Drugs: Quality Agreements, guidance for industry, FDA, November 2016. https://www.fda.gov/media/86193/download (read 26 November 2026)
  16. 1621 CFR 601.20, Biologics licenses; issuance and conditions, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-F/part-601/subpart-C/section-601.20 (read 26 November 2026)
  17. 17Complete response letter to Citius Pharmaceuticals, Inc., BLA 761312, FDA, 28 July 2023. https://download.open.fda.gov/crl/761312Orig1s000OtherActionLtrs.pdf (read 26 November 2026)
  18. 18Complete response letter to Acer Therapeutics Inc., NDA 214860, FDA, 15 June 2022. https://download.open.fda.gov/crl/214860_2023_Orig1s000OtherActionLtrs.pdf (read 26 November 2026)
  19. 19Complete response letter to Eli Lilly and Company, BLA 761306, FDA, 28 September 2023. https://download.open.fda.gov/crl/761306_2024_Orig1s000OtherActionLtrs.pdf (read 26 November 2026)
  20. 20Alternative Tools: Assessing Drug Manufacturing Facilities Identified in Pending Applications, guidance for industry, FDA, September 2025. https://www.fda.gov/media/172290/download (read 26 November 2026)
  21. 21Pre-authorisation guidance, question 5.2.1, When can I expect a pre-authorisation GMP inspection and how are they conducted?, European Medicines Agency, revised March 2024. https://www.ema.europa.eu/en/human-regulatory-overview/marketing-authorisation/pre-authorisation-guidance (read 26 November 2026)
  22. 22Medicines: good manufacturing practice and good distribution practice, MHRA, updated 13 May 2024. https://www.gov.uk/guidance/good-manufacturing-practice-and-good-distribution-practice (read 26 November 2026)
  23. 23FDA Announces Real-⁠Time Release of Complete Response Letters, Posts Previously Unpublished Batch of 89, FDA, 4 September 2025. https://www.fda.gov/news-events/press-announcements/fda-announces-real-time-release-complete-response-letters-posts-previously-unpublished-batch-89 (read 26 November 2026)
  24. 24Compliance Program 7346.832, Preapproval Inspections, FDA, issued 16 September 2022, archived copy. https://web.archive.org/web/2025/https://www.fda.gov/media/121512/download (read 26 November 2026)
  25. 25PDUFA Reauthorization Performance Goals and Procedures, Fiscal Years 2028 Through 2032, proposed, FDA, August 2026. https://www.fda.gov/media/193977/download (read 26 November 2026)
  26. 26GDUFA Reauthorization Performance Goals and Program Enhancements, Fiscal Years 2028 to 2032, proposed, FDA. https://www.fda.gov/media/194166/download (read 26 November 2026)