1What an equipment logbook must record.
21 CFR 211.182 requires “A written record of major equipment cleaning, maintenance (except routine maintenance such as lubrication and adjustments), and use” in individual equipment logs “that show the date, time, product, and lot number of each batch processed”. The people who perform and double-check the cleaning and maintenance date and sign or initial the log, and “Entries in the log shall be in chronological order.”1
EU GMP goes wider. Section 4.31 asks for logbooks for “major or critical analytical testing, production equipment, and areas where product has been processed”, recording “in chronological order, as appropriate, any use of the area, equipment/method, calibrations, maintenance, cleaning or repair operations, including the dates and identity of people who carried these operations out”. Its “as appropriate” can be read as qualifying the whole list, so in practice your procedure should say which entries each log carries.2 ICH Q7 asks API makers for records of major equipment use, cleaning and maintenance with the date, the time “if appropriate”, the product, the batch and who cleaned or maintained (6.20).3 PIC/S uses the 4.31 text,4 MHRA’s GMP guidance lists EudraLex Volume 4 and the Orange Guide,5 and for EU veterinary medicines Implementing Regulation (EU) 2025/2091 has said “Logbooks shall be kept” since 16 July 2026 (Article 22(3)).6
2Equipment logbook format: the columns and where each comes from.
Use these columns for a paper page or an electronic log. Some are what 211.182 and EU 4.31 ask a log to show; others help show that a procedure, hold time or labeling rule was met.
| Column | What to write | Basis |
|---|---|---|
| Equipment | Name and distinctive ID, the same ID the batch record uses | 211.105(b) |
| Date and time | When the activity happened, written as it is done | 211.182; EU 4.8 |
| Activity | Use, cleaning, maintenance, calibration, repair or inspection before use | 211.182, 211.67(b)(6) and (c); EU 4.31 |
| Product and batch | The batch processed, and the batch a cleaning removed | 211.182; Q7 6.20 |
| Detail | Procedure and version, work order or reason, and the clean hold expiry after cleaning | 211.67(b); Annex 15 10.8 |
| Status after | Clean, in use, awaiting cleaning or out of service, matching the label | 211.105(a); Q7 5.26; EU 3.44 |
| Done by | Signature or initials, dated | 211.182; EU 4.31 |
| Checked by | Second person for cleaning and maintenance, or the person verifying automated cleaning | 211.182 |
3Example: a completed logbook page.
This page is invented: the Quillby plant, the dryer, products, batches and people are illustrative. The site sets a 24-hour dirty hold and a 72-hour clean hold.
Header: fluid bed dryer FBD-02, room G-14, shared between products, so it has its own log. Book LB-FBD02-07.
| Date and time | Activity | Product and batch | Detail | Status after | By, checked |
|---|---|---|---|---|---|
| 3 Nov 2026, 06:40 | Inspection before use | Exemplol 50 mg, 26E-118 | Visually clean; label matches last entry; clean hold to 21:30 | Clean | AK |
| 3 Nov, 06:55 to 10:35 | Use: drying | Exemplol 50 mg, 26E-118 | Recipe DRY-50 version 3 | Awaiting cleaning | AK |
| 3 Nov, 10:40 to 11:30 | Maintenance | None in dryer | Inlet filter replaced, WO-3381; leak check passed | Awaiting cleaning | DS, MT |
| 3 Nov, 11:45 to 14:15 | Cleaning | Exemplol 50 mg, 26E-118 | Product change, SOP-CL-031 version 4; started 1 h 10 min after use; clean hold to 6 Nov 14:15 | Clean | AK, MT |
| 4 Nov, 07:05 | Inspection before use | Examplex 10 mg, 26X-207 | Visually clean, within clean hold | Clean | RB |
| 4 Nov, 07:20 to 11:00 | Use: drying | Examplex 10 mg, 26X-207 | Batch first written 26X-270, struck through once; RB, 4 Nov 11:05, digits transposed | Awaiting cleaning | RB |
Two things on this page follow the rules rather than habit. The use rows have no checker, because 211.182 asks for the double-check on cleaning and maintenance. The fan bearing greased on 4 November is not here: 211.182 excludes routine lubrication, though 4.31 does not, so an EU site’s procedure says where it goes.1,
4How it runs in Seal.
In Seal’s electronic logbooks, each row of the FBD-02 page would be an entry against the dryer on a versioned template, with event time and entry time kept separate. Approved event types move the dryer through configured states such as in use, dirty, cleaning and released clean, and a cleaning entry does not by itself make it ready. In cleaning validation, the dirty-hold clock starts at the final product contact, and the production step checks clean state and hold limits at use. A correction like the transposed batch number keeps the original value beside the corrected one, with the reason, user and time.
The equipment blueprint connects calibration, qualification, cleaning and maintenance evidence to the workflow that selects the asset, so a missing prerequisite is flagged at the step, and in the maintenance blueprint return to service remains a separate, authorized decision. When a check fails, Neil can trace the equipment’s impact, finding the batches and results recorded against it with missing links kept visible, for the equipment and quality owners to decide on.
5Laboratory equipment logbook: an HPLC example.
EU GMP asks for logbooks for “major or critical analytical testing” (4.31) and for each test record to give a “Reference to the equipment used” (6.17).2,
This page is invented, from the same Quillby plant. Header: HPLC system HPLC-07, QC laboratory, calibration due 15 January 2027.
| Date and time | Sample and test | Sequence, column | By | Reviewed |
|---|---|---|---|---|
| 5 Nov 2026, 08:10 to 14:30 | Exemplol 50 mg, 26E-112, assay, TM-114 version 2 | SEQ-041, C18-019 | PL | JN, 6 Nov: matches audit trail |
| 5 Nov, 14:45 to 15:20 | None: pump seal replaced, WO-3402; system suitability passed | SEQ-042, C18-019 | DS | JN, 6 Nov: matches audit trail |
| 5 Nov, 16:05 to 21:30 | Exemplol 50 mg, 26E-112, related substances, TM-115 version 1 | SEQ-044, C18-022 | PL | JN, 6 Nov: audit trail also shows SEQ-043, stopped at 15:52 and not logged; investigation opened |
It is the same comparison FDA’s investigators made at Ava Inc.:
“The audit trail for the Fourier Transform Infrared (FTIR) spectroscopy equipment showed no activity from September 23 to 30, 2025. However, your testing records, including the FTIR daily usage log, showed drug testing was performed with this equipment during this time frame.” Ava Inc., FDA warning letter, 14 April 202611
Point the log at the electronic record, not a printout. A balance or pH meter printout can be the original record, but “the spectral file created by FT-IR (Fourier transform infrared spectroscopy) is dynamic and can be reprocessed”, and its printout “would not satisfy CGMP requirements to retain original records or true copies” (FDA data integrity Q&A 10).10
6Logbook entry mistakes and how to fix them.
- Blank fields. PIC/S says “Unused, blank fields within documents should be voided (e.g. crossed-out), dated and signed”, and lists ditto marks among the unclear entries reviewers should check for (PI 041-1, 8.6).12
- Late or missed entries. Records are made “at the time each action is taken” (EU 4.8), or “directly after performing the activities” (Q7 6.14).2,
3 Write a missed entry on the next free line with the time of the work, the time of writing and the reason, signed. Squeezed between earlier lines, it would look as if it had been written at the time. - The wrong book. Strike the entry through so it stays readable, sign and date it, note the right book’s number, and make the entry there (EU 4.9; Q7 6.14). EU 4.9 asks for the reason where appropriate; Q7 does not mention one. The batch record corrections page covers the method.2,
3 - Spoiled pages. Keep incomplete or erroneous pages, with the written reason for replacing them (FDA data integrity Q&A 6), and re-issue only through the register.10
7Who reviews the logbook, when and against what.
| Review | Who | When | Compared with | Basis |
|---|---|---|---|---|
| Entry check | Second person | As cleaning or maintenance is done | The work itself | 211.182 |
| Status check | Operator | Before each use | Label or status board against the last entry | 211.67(b)(6); FDA Q&A |
| Batch review | Quality unit | Before release | Equipment IDs in the batch record against the log; clean hold; open entries | 211.105(b), 211.188(b)(2), 211.192 |
| Audit trail review | Whoever reviews the record | With the record | Instrument or system audit trail against the use log | FDA data integrity Q&A 7, 8; Annex 11 section 9 |
| Between batches | Owner your procedure names | Interval your procedure sets | Maintenance, cleaning and idle entries no batch review reaches; page gaps | Practice; Part 211 asks for none |
On status labels, FDA says temporary labels such as “clean, ready for use” need not be kept and dry-erase boards are acceptable, but the label “should correspond with the information recorded in the equipment cleaning and use log”, and an investigator may check that it does.13 FDA’s inspection program lists “Equipment cleaning and use logs” among the production items investigators cover, and asks for adherence to procedures to be verified “through observation whenever possible”.15 So the batch record’s equipment IDs, the log and the label on the machine should agree on the day.
8Which equipment needs a logbook?
| Situation | US, 21 CFR 211 | EU GMP and ICH Q7 |
|---|---|---|
| Shared major equipment | Individual log required (211.182) | Logbook required (4.31) |
| Dedicated, in sequence | No separate log; cleaning, maintenance and use go in the batch record (211.182) | No dedicated exception in 4.31; Q7 allows the batch record or separate records (6.21) |
| Critical lab instruments | Not named in 211.182; calibration records required (211.160(b)(4), 211.194(d)) | Logbook required (4.31); not named in Q7 6.20 |
| Processing rooms | 211.182 covers equipment only | Logbook required (4.31); Q7 6.20 covers equipment only |
| Routine lubrication and adjustment | Excluded from the log (211.182) | Not excluded by 4.31; your procedure says where they go |
9Controlling and closing a logbook.
Document control issues each bound, paginated book against a register, so a missing book or page shows. FDA calls such notebooks “good document control because they allow easy detection of unofficial notebooks as well as any gaps in notebook pages” (data integrity Q&A 6).10 PIC/S guidance asks for a unique identifier for each blank document, “recording the issue of each document in a register”, “sequential numbering of issued pages in bound books”, reconciliation after use, and a controlled re-issue that keeps every copy and records the justification and approval (PI 041-1, 8.4).12
| Book | Equipment | Issued | Pages | Closed or returned | Archived |
|---|---|---|---|---|---|
| LB-FBD02-06 | FBD-02 | 12 Jun 2026 | 1 to 100 | Returned 2 Oct 2026, all pages used | QA archive, box 26-14 |
| LB-FBD02-07 | FBD-02 | 2 Oct 2026 | 1 to 100 | Open | Not yet |
| LB-HPLC07-03 | HPLC-07 | 20 Aug 2026 | 1 to 200 | Open | Not yet |
- Keep it readily available for inspection at the site where the work happened (211.180(c)).1
- Keep it at least 1 year after the latest expiry date of any batch it records, or 3 years after distribution for OTC products exempt from expiry dating (211.180(a)); the batch record retention page compares the EU and other rules.1
- For an electronic log, let only authorized people change records, check input and output, and keep a backup (211.68(b)); Part 11 applies where it replaces paper,1,
17 and in the EU the extent of validation rests on “a justified and documented risk assessment” (Annex 11, 1).14 How to choose a CMMS lists what to test first.
The Commission consulted on new drafts of Chapter 4 and Annex 11 from 7 July to 7 October 2025. The Chapter 4 draft keeps logbooks (4.47), extends them to areas where product is “processed or handled” and adds a section on hybrid paper and electronic systems; on 25 November 2026 EudraLex still lists the January 2011 texts as current.18,
10What inspectors cite.
FDA’s FY 2025 data cite 211.182 15 times on drug Form 483s: 11 under written records kept in individual logs, 3 under the information the logs must show and 1 under dating and signing. Manually prepared 483s are not included.21 Letters show what the gaps look like.
“Additionally, your firm lacks equipment usage logs and cleaning documentation, to ensure that the equipment is adequately cleaned and to prevent carry-over contamination from a prior batch during production campaigns.” Medinatura New Mexico, Inc., FDA warning letter, 10 December 202522
Malta’s Medicines Authority found this at an Indian manufacturer:
“Various Logbooks/Registers were present in various forms other than hard bound, ranging from clipped with different paper and ink, stapled and loose papers in plastic folders. Evidence of reissued parts of logbooks replacing original parts were observed during the inspection.” Zenzi Pharmaceutical Industries Private Limited, statement of non-compliance MT/002NCR/2026, 5 May 202623
AQuestions and answers
Can one logbook cover several pieces of equipment?
In the US, 21 CFR 211.182 asks for individual equipment logs, so each piece of major equipment needs its own record, unless it is dedicated to one product with batches made in numerical sequence. An electronic system can hold many logs if every entry is tied to one piece of equipment and can be read in time order for it. EU GMP does not say individual, but each entry still has to show which equipment or area it concerns.
Does every logbook entry need a second signature?
Not under US rules. 211.182 asks for the person performing and the person double-checking to sign cleaning and maintenance entries, and where automated equipment does the cleaning, only the person verifying it. Use entries need the record of the batch, not a checker. EU GMP asks for the identity of the people who carried out each operation and leaves further checks to your procedures.
Should calibration be recorded in the equipment logbook?
EU GMP lists calibrations among the logbook’s contents. US rules require written records of calibration checks for automated equipment and laboratory instruments but do not require them in the equipment log, so a separate calibration record meets the US rule. Either way, equipment that fails a check needs to be traceable to the batches it touched.
Do logbook entries need start and end times?
Record both. The US rule asks for the date and time of each batch processed, and the end of use and the start and end of cleaning are what show that the dirty and clean hold times set in cleaning validation were met. A single time per entry cannot show either.
Can an MES or CMMS replace the equipment logbook?
An MES can, if it holds for each piece of equipment, in time order, every batch processed and every cleaning and maintenance with who did and who checked it. It is then an electronic record and has to meet the computerized system rules. A CMMS work order holds maintenance but not use or cleaning, so it cannot be the log on its own. An instrument audit trail shows changes to electronic data, not who cleaned the instrument, so review it against the log rather than in its place.
References23 sources
References
- 121 CFR Part 211, Current good manufacturing practice for finished pharmaceuticals, sections 211.67, 211.68, 211.105, 211.160, 211.180, 211.182, 211.188, 211.192 and 211.194, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 25 November 2026) - 2EudraLex Volume 4, Part I, Chapter 4: Documentation, European Commission, in operation 30 June 2011, sections 4.8, 4.9 and 4.31. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ chapter4_ 01- 2011_ en_ 0. pdf (read 25 November 2026) - 3ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, ICH, 10 November 2000, sections 5.26, 6.14, 6.20 and 6.21. https:/
/ database. ich. org/ sites/ default/ files/ Q7%20Guideline. pdf (read 25 November 2026) - 4PE 009-18, Guide to Good Manufacturing Practice for Medicinal Products, Part I, PIC/S, 24 September 2026, section 4.31. https:/
/ picscheme. org/ docview/ 11332 (read 25 November 2026) - 5Medicines: good manufacturing practice and good distribution practice, MHRA and Department of Health and Social Care, GOV.UK, last updated 13 May 2024. https:/
/ www. gov. uk/ guidance/ good- manufacturing- practice- and- good- distribution- practice (read 25 November 2026) - 6Commission Implementing Regulation (EU) 2025/2091 of 17 October 2025 laying down good manufacturing practice for veterinary medicinal products, applying from 16 July 2026, Article 22(3). https:/
/ eur- lex. europa. eu/ eli/ reg_ impl/ 2025/ 2091/ oj/ eng (read 25 November 2026) - 7EudraLex Volume 4, Part I, Chapter 3: Premises and Equipment, European Commission, 13 August 2014, in operation 1 March 2015, section 3.44. https:/
/ health. ec. europa. eu/ document/ download/ 18d76565- 137b- 41d2- a602- 794527f708c1_ en?filename=chapter_ 3. pdf (read 25 November 2026) - 8EudraLex Volume 4, Annex 15: Qualification and Validation, European Commission, 30 March 2015, in operation 1 October 2015, section 10.8. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2015- 10_ annex15_ 0. pdf (read 25 November 2026) - 9EudraLex Volume 4, Part I, Chapter 6: Quality Control, European Commission, 28 March 2014, in operation 1 October 2014, section 6.17. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2014- 11_ vol4_ chapter_ 6_ 0. pdf (read 25 November 2026) - 10Data Integrity and Compliance With Drug CGMP: Questions and Answers, guidance for industry, FDA, December 2018, questions 6, 7, 8 and 10. https:/
/ www. fda. gov/ media/ 119267/ download (read 25 November 2026) - 11Ava Inc., warning letter 320-26-64, MARCS-CMS 721180, FDA, 14 April 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ ava- inc- 721180- 04142026 (read 25 November 2026) - 12PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S guidance, 1 July 2021, sections 8.4 and 8.6. https:/
/ picscheme. org/ docview/ 4234 (read 25 November 2026) - 13Questions and Answers on Current Good Manufacturing Practice Regulations: Production and Process Controls, question 1, FDA. https:/
/ www. fda. gov/ drugs/ guidances- drugs/ questions- and- answers- current- good- manufacturing- practice- regulations- production- and- process (read 25 November 2026) - 14EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, in operation 30 June 2011, sections 1 and 9. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 25 November 2026) - 15Compliance Program 7356.002, Drug Manufacturing Inspections, FDA, implementation date 17 October 2022, Production System. https:/
/ www. fda. gov/ media/ 75167/ download (read 25 November 2026) - 16Guidelines on Good Manufacturing Practice specific to Advanced Therapy Medicinal Products, C(2017) 7694 final, European Commission, 22 November 2017, section 6.29. https:/
/ health. ec. europa. eu/ document/ download/ ad33d9dd- 03f0- 4bef- af53- 21308ce2187d_ en?filename=2017_ 11_ 22_ guidelines_ gmp_ for_ atmps. pdf (read 25 November 2026) - 17Part 11, Electronic Records; Electronic Signatures, Scope and Application, guidance for industry, FDA, September 2003. https:/
/ www. fda. gov/ regulatory- information/ search- fda- guidance- documents/ part- 11- electronic- records- electronic- signatures- scope- and- application (read 25 November 2026) - 18Stakeholders’ consultation on EudraLex Volume 4, Good Manufacturing Practice guidelines: Chapter 4, Annex 11 and new Annex 22, European Commission, opened 7 July 2025, closed 7 October 2025. https:/
/ health. ec. europa. eu/ consultations/ stakeholders- consultation- eudralex- volume- 4- good- manufacturing- practice- guidelines- chapter- 4- annex_ en (read 25 November 2026) - 19EudraLex Volume 4, Chapter 4: Documentation, draft for consultation, European Commission, 2025, sections 4.47 and 4.82 to 4.85. https:/
/ health. ec. europa. eu/ document/ download/ fa336a6e- 753b- 46fc- b53b- 9178bacd8878_ en?filename=mp_ vol4_ chap4_ consultation_ guideline_ en. pdf (read 25 November 2026) - 20EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 25 November 2026) - 21Inspection Observations, FY 2025 data set, inspections ending 1 October 2024 to 30 September 2025, Drugs sheet, FDA. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- observations (read 25 November 2026) - 22Medinatura New Mexico, Inc., warning letter 320-26-27, MARCS-CMS 716025, FDA, 10 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ medinatura- new- mexico- inc- 716025- 12102025 (read 25 November 2026) - 23Statement of non-compliance with GMP, report MT/002NCR/2026, Zenzi Pharmaceutical Industries Private Limited, India, Malta Medicines Authority, 5 May 2026, EudraGMDP reference 184851. https:/
/ eudragmdp. ema. europa. eu/ inspections/ gmpc/ searchGMPNonCompliance. do (read 25 November 2026)