1Who asks for a computerized system inventory?
No US regulation requires a list of computerized systems. 21 CFR 211.68 requires computers used in making drugs to be checked under a written program, and Part 11 requires closed systems to be validated; neither names an inventory.1,
The inventory itself comes from EU GMP and PIC/S guidance. Annex 11, guidance under Article 47 of Directive 2001/83/EC, says “An up to date listing of all relevant systems and their GMP functionality (inventory) should be available.”5 PIC/S says what the list should hold.6,
| What the text asks | Basis |
|---|---|
| Computers checked under a written program; no list named | Rule: 21 CFR 211.68(a) |
| Closed systems validated; no list named | Rule: 21 CFR 11.10(a) |
| Decide which records are Part 11 records, and document it | Guidance: FDA Part 11 guidance, III.B.2 |
| A current listing of systems and their GMP functionality | Guidance: Annex 11, 4.3 |
| A system description for each critical system | Guidance: Annex 11, 4.3 |
| Name, location, function, criticality, validation status and documents | Guidance: PIC/S PI 041-1, 9.3 |
| Ownership, supplier, functionality, links and validation status | Guidance: PIC/S PI 011-3, 6.3 |
| Classified by use, criticality and validation status; plans for what is not validated | Guidance: PIC/S PI 011-3, 23.8 |
PIC/S gives inspectors the reason: “Companies that do not have adequate visibility of all computerised systems in place may overlook the criticality of systems and may thus create vulnerabilities within the data lifecycle.” It adds, “An inventory list serves to clearly communicate all systems in place and their criticality, ensuring that any changes or modifications to these systems are controlled.”6 Its older guide lists an inventory among the information an inspector considers when preparing an inspection: “The list should also indicate validation status and risk ranking.”7
For a US-only site, our reading is that the inventory is the practical way to show which systems the 211.68 program covers and which records are Part 11 records. The July 2025 draft of Annex 11, still a draft on 26 November 2026, has no inventory clause;8,
2Computerized system inventory form: the columns.
PIC/S names the minimum: name, location, function, criticality and validation status.6 A row that also names owners, supplier, interfaces and the next review answers an inspector’s first questions about a system without opening another document.
| Field | What to enter | Basis |
|---|---|---|
| Name, version, instance | Product and release; which instance or tenant | Guidance: PI 041-1 9.3 |
| Location, hosting | Site and server, or the SaaS supplier | Guidance: PI 041-1 9.3 |
| Primary function | What it does in the process | Guidance: PI 041-1 9.3 |
| GMP functionality, records | GxP records it creates or holds; Part 11 records? | Guidance: Annex 11, 4.3; FDA III.B.2 |
| Owners | Process owner and system owner | Guidance: PI 011-3 6.3 |
| Supplier, service model | Supplier, support end, SaaS or on site | Guidance: PI 011-3 6.3 |
| Interfaces | Systems it sends data to or takes data from | Guidance: PI 011-3 6.3; Annex 11, 4.3 |
| GxP impact | Direct, indirect or none, with the reason | Guidance: PI 041-1 9.3 |
| Critical? | Yes or no; the system description’s number | Guidance: Annex 11, 4.3 |
| Software category | GAMP 5 category | Practice: GAMP 5 |
| Validation status | Validated, planned, or not required; report number | Guidance: PI 041-1 9.3 |
| Periodic review | Interval, last report, end of current period | Practice; Guidance: Annex 11, 11 |
| Lifecycle state | In use, read-only or retired, with dates | Practice |
| Retention end | Read-only rows: when the last records’ retention ends | Guidance: Annex 11, 7.1 and 17 |
- One row per instance that can differ. A validation instance, a second site, a second SaaS tenant or a module switched on for one department can carry its own configuration and evidence, so it gets its own row or a line under its system. This is practice.
- GxP or not is a decision, so record it. How to decide is in what GxP is; the row holds the answer and its reason, on PIC/S’s scale of “direct GMP/GDP impact, indirect impact, none”.6
- The software category shapes how much supplier evidence and testing you plan. It comes from GAMP 5, which is practice, not a rule; see GAMP 5 software categories.
- Infrastructure has its own register. Annex 11 says “The application should be validated; IT infrastructure should be qualified.”5 Practice is to list servers, networks and directory services in an infrastructure register and name them in each row’s hosting column.
- GxP spreadsheets are listed too, in the inventory or in a register it points to; see spreadsheet validation.
3Which row does a system get?
- Non-GxP. List it anyway, with impact none and the reason. PIC/S’s scale includes none,6 and FDA’s Part 11 guidance recommends documenting which records are Part 11 records;3 a row with a reason shows the decision was made.
- Read-only. A system kept for its records is still a GxP system until those records are migrated, archived or past retention, and it keeps the criticality its records give it: a read-only system holding release results is still critical. Annex 11 says archived data “should be checked for accessibility, readability and integrity”, and before relevant changes to the system “the ability to retrieve the data should be ensured and tested.”5 The row names the records held, when their retention ends and the plan to retire the system; see system decommissioning. The 2025 draft adds “A final review should be conducted when the system is taken out of use.”8
- Critical. Annex 11 asks for more than a row: “For critical systems an up to date system description detailing the physical and logical arrangements, data flows and interfaces with other systems or processes, any hardware and software pre-requisites, and security measures should be available.”5 PIC/S’s examples of critical systems start with “systems used to control the purchasing and status of products and materials”, and include systems that “generate, store or process data that is used to determine batch quality” and those “used in the decision process for the release of products.”6 They get the shortest periodic review interval.
- Direct or indirect. Record which, and why; the review interval follows from it.
Validation status belongs in every row, whatever its class. Where a GxP system is not validated for its current use, the row carries the plan. PIC/S’s older guide says “Firms should have plans to complete any outstanding retrospective validation of GxP related computer systems within a reasonable time period depending on the risks and complexity of the systems.” The continued use of critical systems that suppliers cannot support and that cannot be validated “must be justified by regulated users, supported by alternative fail-safe arrangements and considered for urgent phased replacement.”7 What validation involves is in computer system validation.
4How it runs in Seal.
In Seal’s computer system validation blueprint, the regulated system is the unit of control. Its record defines the product, service model, owners, supplier, hosting, interfaces, data, users, electronic records and signatures, and lifecycle state, and separate instances, tenants, modules and configurations can carry different risk and evidence, even from the same supplier.
Each system’s record states its intended use, GxP impact and supplier, and shows the version currently validated, worked out from the last released change control. In the Systems Query, Seal’s list of systems, each shows the version it is validated on and its next periodic review.
5Example: Exampla’s computerized system inventory.
Invented for illustration. Exampla Pharma Services LLC, a contract manufacturer and testing laboratory in Durham, North Carolina, keeps its inventory as QA-INV-001. QA’s computer systems lead owns it, and each system owner keeps their rows current. On 1 October 2026 it was reissued after its yearly check with 18 rows: 5 platforms, 12 standalone instruments and the old LIMS. Each standalone instrument has its own row. The 18 chromatographs that ExamCDS controls and acquires from, 14 HPLC and 4 GC, are listed on ExamCDS’s row instead, because their data are made and kept in ExamCDS; the instruments themselves are qualified under USP <1058>.
| System | Impact and status | Review period ends |
|---|---|---|
| ExamLIMS 6.1, virtual servers | Critical; validated, live 8 March 2025 | 7 March 2027 |
| ExamCDS 3.4, virtual servers, with 14 HPLC and 4 GC | Critical; validated, live 14 October 2024 | 13 October 2026 |
| ExamMES 2, SaaS | Critical; validated, live 2 June 2025 | 1 June 2027 |
| ExamQMS, SaaS | Direct; validated, live 9 January 2024 | 8 January 2028 |
| ExamBMS, on-site server | Critical; validated, live 21 May 2023 | 20 May 2027 |
| 12 instruments: 3 FTIR, 1 UV-Vis and 2 Karl Fischer with PCs; 6 balances | Critical; each qualified | With each yearly requalification |
| ExamLab 4, one physical server | Critical; read-only since 8 March 2025; out of support; retention ends 31 December 2033 | 7 March 2027; final review before retirement in 2027 |
Each row holds every field of the form. ExamCDS’s row, in full:
| Field | ExamCDS 3.4 |
|---|---|
| Name, version, instance | ExamCDS 3.4, production; validation instance on a line below |
| Location, hosting | Virtual servers, Raleigh data center; clients in the Durham laboratory |
| Primary function | Runs and acquires from the chromatographs; processes and reports results |
| GMP functionality, records | Raw data, methods, results, audit trails, signatures; Part 11 records: yes |
| Owners | Process owner: head of QC; system owner: lab manager |
| Supplier, service model | Self-hosted on Exampla’s virtual servers; supplier support for 3.4 until 31 December 2027 |
| Interfaces | 14 HPLC and 4 GC; results to ExamLIMS |
| GxP impact | Direct: its results decide batch release |
| Critical? | Yes; data flow description revised under CC-25-072 |
| Software category | GAMP 5 category 4, configured product |
| Validation status | Validated in 2024, 46 test cases; GC-04 under CC-26-041 |
| Periodic review | 12 months; last QA-PR-003; period ends 13 October 2026 |
| Lifecycle state | In use since 14 October 2024 |
| Retention end | None: in use |
ExamLab 4 follows the red path in the diagram. It is GxP, holding QC results from 2014 to March 2025, and nothing is created or changed in it, so its row names the records held, their retention end, 31 December 2033 for the 2025 results kept 8 years, and the plan to retire the server in 2027. It stays critical, because those results released batches, and as a read-only system it is reviewed every 24 months, its first period ending 7 March 2027; the final review in its decommissioning plan comes first.
Of the 18 rows, 17 are critical, because almost every system at a contract manufacturer and testing laboratory produces data that decide batch quality or go into batch records: that is PIC/S’s list applied as written. ExamBMS is critical because it records cleanroom temperature, humidity and pressure during vial filling, a critical manufacturing process. ExamQMS is the one exception, rated direct: it holds deviations, CAPA, change control and training, none of them test results or batch records, so it is reviewed every 24 months. A firm that records its release decision in the QMS would rate it critical. With nearly every row critical, the class sorts little on its own; the impact reason in each row is what an inspector reads. The 6 balances print to paper and store no records; Exampla treats their qualification records as their system description and reviews them with their requalification.
The yearly check compared the inventory with IT’s list of networked devices and the laboratory’s instrument list. It found 2 Karl Fischer titrators whose PCs had been qualified but never listed, so 16 rows became 18. ExamCDS’s row points to its data flow description, which its first periodic review found had missed the interface to ExamLIMS.
6Keeping the inventory current.
Annex 11 asks for an “up to date” listing,5 and no text sets how often to check it. Common practice:
- Change control writes the row. A new system, an upgrade, a new interface or a retirement changes the row as part of the same change; see change control.
- The periodic review reads it. Each review confirms the row and sets the end of the next period.
- A yearly check finds what change control missed. Compare the inventory with IT’s device and software license lists, purchasing records, SaaS subscriptions and the instrument qualification list.
- Retired rows stay. Mark the system retired, with the date and where its records went, rather than deleting the row.
- The validation master plan points to it. See validation master plan.
- It is ready to hand over. PIC/S’s list of information for inspectors preparing an inspection includes “A list, or inventory, of all Computerised Systems on site by name and application for business, management, information and automation levels.”7
AQuestions and answers
Does FDA require a computerized system inventory?
No regulation in 21 CFR requires one. FDA’s Part 11 guidance recommends deciding which records are Part 11 records and documenting the decision, which is hard to do without a list of systems. Recent FDA warning letters that cite 211.68, such as the April 2026 letter to Fareva, have asked for a list of all hardware and software, standalone and networked, as part of the firm’s response. For sites that EU or PIC/S inspectors visit, Annex 11 and PI 041-1 expect the inventory.
Should non-GxP systems be on the inventory?
Listing them is good practice. PIC/S’s scale for impact runs from direct through indirect to none, and a row marked none with its reason shows that someone decided the system is not GxP, rather than that nobody looked. It also catches the day a non-GxP system starts holding GxP data, because the row is there to be changed.
Do spreadsheets belong on the computerized system inventory?
GxP spreadsheets do, either as rows in the inventory or in a spreadsheet register that the inventory points to. Each needs the same essentials: what it calculates, its criticality and its validation status. How to validate one is on the spreadsheet validation page.
What goes in a system description for a critical system?
Annex 11 section 4.3 lists it: the physical and logical arrangements, data flows and interfaces with other systems or processes, hardware and software prerequisites, and security measures. A diagram of data flows with a short text for each interface usually covers it. Keep it current through change control, because a description that misses a new interface is a finding at the next periodic review.
Who owns the computerized system inventory?
Your procedure decides. A common split is that quality assurance, often a computer systems or validation lead, owns the inventory and its yearly check, while each system owner keeps their rows current through change control. Annex 11 defines the system owner as the person responsible for the availability and maintenance of a system and for the security of its data.
References9 sources
References
- 121 CFR 211.68, Automatic, mechanical, and electronic equipment, paragraphs (a) and (b), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 68 (read 26 November 2026) - 221 CFR 11.10, Controls for closed systems, paragraph (a), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 11. 10 (read 26 November 2026) - 3Part 11, Electronic Records; Electronic Signatures: Scope and Application, final guidance, section III.B.2, FDA, August 2003. https:/
/ www. fda. gov/ media/ 75414/ download (read 26 November 2026) - 4Warning letter to Fareva Amboise, MARCS-CMS 723502, FDA, 10 April 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ fareva- amboise- 723502- 04102026 (read 26 November 2026) - 5EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, Principle and sections 4.3, 7.1, 11 and 17, European Commission, in operation from 30 June 2011. https:/
/ health. ec. europa. eu/ document/ download/ 8d305550- dd22- 4dad- 8463- 2ddb4a1345f1_ en?filename=annex11_ 01- 2011_ en. pdf (read 26 November 2026) - 6PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, section 9.3, item 2, PIC/S, 1 July 2021. https:/
/ picscheme. org/ docview/ 4234 (read 26 November 2026) - 7PI 011-3, Good Practices for Computerised Systems in Regulated GxP Environments, sections 6.3 and 23.8 and Table 1, PIC/S, 25 September 2007. https:/
/ picscheme. org/ docview/ 3444 (read 26 November 2026) - 8EudraLex Volume 4, Annex 11: Computerised Systems, draft for consultation, section 14.3, European Commission and PIC/S, July 2025. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 26 November 2026) - 9EudraLex Volume 4, Good Manufacturing Practice guidelines, listing Annex 11 “Computerised Systems (revision January 2011)”, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 26 November 2026)