1Four paragraphs, and the clause that makes (d) so common.
Section 211.22, “Responsibilities of quality control unit”, opens Subpart B of Part 211, Organization and Personnel. Its four paragraphs read as FDA wrote them in 1978:1,
“(a) There shall be a quality control unit that shall have the responsibility and authority to approve or reject all components, drug product containers, closures, in-process materials, packaging material, labeling, and drug products, and the authority to review production records to assure that no errors have occurred or, if errors have occurred, that they have been fully investigated. The quality control unit shall be responsible for approving or rejecting drug products manufactured, processed, packed, or held under contract by another company. (b) Adequate laboratory facilities for the testing and approval (or rejection) of components, drug product containers, closures, packaging materials, in-process materials, and drug products shall be available to the quality control unit. (c) The quality control unit shall have the responsibility for approving or rejecting all procedures or specifications impacting on the identity, strength, quality, and purity of the drug product. (d) The responsibilities and procedures applicable to the quality control unit shall be in writing; such written procedures shall be followed.” 21 CFR 211.22, eCFR1
The last clause was not in the proposal. When a comment called (d) too broad, FDA answered that it “does not define the responsibilities of the quality control unit, but it does require that all its responsibilities, including those required in § 211.22, be in writing”, and added “such written procedures shall be followed” for consistency with the rest of the rule.3 That one clause is why (d) reaches any written procedure for a quality unit duty, wherever else Part 211 sets the duty, and why it is cited so often.
2The most cited section in Part 211, three years running.
| Cited as | What it covers | FY2023 | FY2024 | FY2025 | Per 100 drug 483s, FY2023 to FY2025 |
|---|---|---|---|---|---|
| 211.22, all paragraphs | The whole section | 200 | 272 | 309 | 39.2, 48.5, 43.3 |
| 211.22(d) | Responsibilities and procedures written and followed | 152 | 201 | 243 | 29.8, 35.8, 34.1 |
| 211.22(a) | Approving or rejecting, reviewing records, contract products | 42 | 56 | 53 | 8.2, 10.0, 7.4 |
| 211.22(c) | Approving or rejecting procedures and specifications | 6 | 15 | 13 | 1.2, 2.7, 1.8 |
| Drug 483s | Issued from FDA’s electronic tools | 510 | 561 | 713 |
Section 211.22 was the most cited Part 211 section in each of the three years, and in fiscal year 2025 it drew 309 citations, 73 more than 211.192, the next. On its own, 211.22(d) was the most cited Part 211 reference in 2025; 211.22(a) was 13th and 211.22(c) 40th. Paragraph (b), on laboratory facilities, drew no citation in any of the three years.4
The count rose every year, but drug 483s rose too, from 510 to 713. Per 100 483s the section went from 39.2 citations to 48.5 and fell back to 43.3, and (d) from 29.8 to 35.8 and then 34.1. The rate is higher than in fiscal year 2023, but fiscal year 2025 did not continue the 2024 rise.4
These are citations, not 483s: a 483 that cites 211.22 twice counts twice, and handwritten 483s aren’t in FDA’s files. Each records an investigator’s observation, not a conclusion FDA has reached.4 The dashboard counts that follow include only inspections whose classification is final, so they are lower, and fiscal year 2026 is still being classified.5
3Paragraph (d): written, and followed.
Six standard citations cover the section, and an investigator keeps or deletes the bracketed options in each:4
| Cited as | Paragraph | FDA’s short description | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Cite 1105 | (d) | Procedures not in writing, fully followed | 152 | 201 | 243 |
| Cite 9001 | (a) | Lack of quality control unit | 15 | 27 | 28 |
| Cite 1033 | (a) | Authority lacking to review records, investigate errors | 14 | 7 | 11 |
| Cite 1049 | (a) | Approve or reject components, products | 11 | 16 | 8 |
| Cite 1079 | (a) | Contract drug products--lack of responsibility | 2 | 6 | 6 |
| Cite 1098 | (c) | Approve or reject procedures or specs | 6 | 15 | 13 |
Cite 1105 is the whole of (d), and 78.6% of the section’s fiscal year 2025 citations (243 of 309). Its long text is “The responsibilities and procedures applicable to the quality control unit are not [in writing] [fully followed]. Specifically, ***”.4 The Data Dashboard keeps the wording each investigator left after choosing:
| What the investigator wrote | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
| 211.22(d), all wordings | 115 | 171 | 222 | 130 |
| “are not in writing and fully followed” | 55 | 88 | 97 | 54 |
| “are not fully followed” | 45 | 56 | 81 | 60 |
| “are not in writing” | 14 | 23 | 41 | 15 |
| Both options deleted (“are not.”) | 1 | 4 | 3 | 0 |
| 211.22(a), all wordings | 35 | 51 | 51 | 29 |
| “There is no quality control unit.” | 13 | 24 | 28 | 14 |
- Following is the problem more often than writing. In fiscal year 2025 the investigator kept “fully followed” in 178 of 222 dashboard citations under (d) (80.2%), and in 422 of 508 over the three full years (83.1%).5 Most 211.22(d) observations fault what the unit did, not only what it wrote.
- The commonest wording keeps both options. “Not in writing and fully followed” was the wording kept most often in each full year: 55, 88 and 97 citations. It is also FDA’s text left unedited, so it may not always mean both were found. Among fiscal year 2026 inspections classified so far, “not fully followed” alone leads, 60 to 54, and those counts will grow as more are classified.5
- Missing procedures are a growing share. “Not in writing” alone rose from 14 of 115 citations (12.2%) in fiscal year 2023 to 41 of 222 (18.5%) in 2025.5
- The commonest (a) citation is that there is no unit at all. In fiscal year 2025, 28 of the 51 dashboard citations under (a) read only “There is no quality control unit.”, and 65 of 137 over the three full years.5 In the yearly files, cite 9001 went from 15 to 28 citations, 2.9 to 3.9 per 100 drug 483s; a unit lacking the authority to approve, reject, review or investigate (cites 1049 and 1033) drew 19 in fiscal year 2025.4
Where to look first follows from the program investigators work to. Compliance Program 7356.002 begins its quality system review with “whether the quality unit has fulfilled the responsibility to review and approve all procedures related to manufacturing, quality control, and quality assurance”, and says “The establishment’s adherence to written procedures should be verified through observation whenever possible.” It then lists the areas covered: oversight of contracted operations and suppliers, product reviews, complaint reviews, discrepancy and failure investigations, change management, rejects, stability failures and returns, among others.6 Those areas, compared with the procedures that govern them, are where a 211.22(d) observation is found. If a 483 has already arrived, responding to a 483 covers the reply, and the most common 483 observations puts 211.22(d) beside every other drug citation.
4Example: testing 211.22(d) before an inspector does.
Invented for illustration. A solid-dose site released 160 batches in the last 12 months. Its head of QA tests 211.22(d) the way the drug inspection program does: for each written quality unit responsibility, a sample of the year’s records compared with the procedure in force at the time.
| Responsibility and procedure | What the procedure says | Records checked | Not as written | Result |
|---|---|---|---|---|
| Batch disposition, QA-014 | QA releases a batch only when each deviation on it is closed or has an approved impact assessment | 40 of 160 releases | 3 released with a deviation open and no assessment (7.5%) | Not fully followed |
| Deviations, QA-021 | Closed within 30 days, or an extension approved by the head of QA | 25 | 6 closed late: 4 with an approved extension, 2 without (8.0%) | Not fully followed |
| Change control, QA-008 | QA approves a change before it is implemented | 15 | 1 implemented 9 days before approval (6.7%) | Not fully followed |
| Complaints, QA-030 | QA reviews each complaint for a possible specification failure | 12 | 0 | Followed |
| Specifications, QC-002 | QA approves each new or revised specification | 10 | 0 | Followed |
| Contract laboratory results | No procedure: certificates are accepted by email, and nobody is named to review them | 8 reports | Not applicable | Not in writing |
Six of the 102 records checked against a procedure (5.9%) were not as written, and one responsibility had no procedure at all. A 483 written on these facts would keep both options, “are not in writing and fully followed”, the wording investigators kept most often in each of the last three full years.5 The fix, item by item:
| Finding | Correction now | Corrective action |
|---|---|---|
| 3 batches released with a deviation unassessed | Impact assessments completed and approved for the 3 batches, with their status confirmed; the other 120 releases checked, finding none more | Release cannot be signed while a deviation on the batch lacks an approved assessment |
| 2 deviations late without extension | Both extensions assessed and recorded late, with the reason | Due dates tracked with an escalation before day 30; the 30-day target reviewed against the year’s data under change control |
| 1 change implemented before approval | Change assessed retrospectively; batches made under it reviewed under 211.192 | The change made inside its approval workflow; the owner’s training checked |
| Contract laboratory results | Procedure written: who reviews which reports, against which specification, and what happens on a failure; quality agreement updated | The 8 reports reviewed under the new procedure |
Two choices in it come from FDA’s own reading. FDA said in 1978 that the unit is responsible “for making sure that the procedures and specifications developed are appropriate and followed”, so each finding first asks whether the procedure or the practice was wrong: a 30-day target that most investigations miss may be the procedure’s fault.3 And FDA’s quality agreement guidance says a written agreement “can facilitate compliance with CGMP and, in particular, with 21 CFR 211.22(d)”, which is why the contract laboratory fix runs through the agreement as well as a procedure.7 The batches touched by the unapproved change and the unassessed deviations are investigated under 21 CFR 211.192.
5The 211.22 procedures: a checklist.
Section 211.22 does not list documents, but each duty in it needs a written procedure under (d), and each procedure needs a record that shows it was followed.1,
| 211.22 | What must be in writing | The record that shows it was followed | Where it is covered |
|---|---|---|---|
| (a) Materials and products | Who approves or rejects components, containers, closures, in-process materials, packaging, labeling and drug products, and on what evidence | A signed disposition for each lot and batch | Incoming material release |
| (a) Record review | The unit’s authority to review production records, and the review before release | A review record for each batch | Batch record review; 21 CFR 211.192 |
| (a) Errors investigated | The unit’s authority to investigate fully; who investigates what; who approves the conclusion | Investigation reports approved by the unit | Deviation investigation report; OOS investigation |
| (a) Contract products | The owner’s unit approves or rejects; what the contract site approves; how results reach the owner | Quality agreement; the owner’s release of each batch | Quality agreement |
| (b) Laboratory | Which laboratory, in-house or contract, tests what, and how a contract laboratory is qualified and its work checked | Laboratory qualification; review of results | 21 CFR 211.160 |
| (c) Procedures and specifications | The unit approves or rejects each procedure and specification affecting identity, strength, quality or purity, and each change; others may draft them | Approval signatures and dates; change records | Document control; change control |
| (d) The responsibilities | Each responsibility, who holds it and which procedure carries it out | The approved, current list | Quality manual |
| (d) Followed | How the unit checks that its procedures are followed | Self-inspection records and the actions they raise | GMP internal audit |
The linked answers on material release, batch record review, investigations, quality agreements, document and change control, the quality manual and internal audits each have a Word download. How QA and QC can share these duties, and who signs what, is in QA vs QC.
6How it runs in Seal.
In Seal’s quality management system, deviations, CAPA, change control, documents, training, audits, suppliers, complaints and risk are records in one system, and each event opens with its evidence, read from Seal or from the ERP, LIMS, MES and training systems you already run. A corrective action can become a control in the workflow, released through change control with its own verification, rather than ending as a revised document and a training task.
In batch release, the release case gives each requirement an owner, a source and a recorded outcome, and closes only when its obligations, exceptions, decisions and approved open controls agree. Closing an investigation does not itself release a batch: QA records how the approved conclusion affects the batches in scope, which is the check the three releases in the example above lacked.
7What FDA said the quality unit is, and is not.
Most of what the four paragraphs leave open, FDA answered in the 1978 preamble, in reply to comments on the proposal.
| Question | FDA’s answer | Source |
|---|---|---|
| Must the unit do the work itself? | No. FDA meant the unit to be responsible “for ensuring that controls are implemented during manufacturing operations which assure drug product quality, not that the quality control unit actually perform each one of the duties”, and changed the definition’s “perform” to “be responsible for” | 1978 preamble, comment 913 |
| Can one person be the unit? | In very small operations, yes, but “that person still has the responsibility for implementing all the controls and reviewing the results of manufacturing”. FDA’s 2006 guidance adds a periodic review by another qualified person not involved in production | Comment 93;3 2006 guidance III.F8 |
| Can testing go to an outside laboratory? | Yes. Paragraph (b) needs facilities available “from whatever source”, and the manufacturer must see “that the outside laboratory used is qualified to do the work and that the work is performed satisfactorily” | Comments 94 and 1013 |
| Who releases a contract-made product? | The owner: “The responsibility to approve release of a drug product for distribution must rest with the owner of the drug product.” The contract facility also approves or rejects the products or results of its own operations | Comment 97;3 2016 guidance IV7 |
| Must the unit write the procedures and specifications? | No. Others may take “primary and initial responsibility”; specification and formula committees are allowed. Paragraph (c) covers what happens before production, (a) the production itself | Comments 102 and 1043 |
| Does each equipment adjustment need quality approval? | No. Production may make minor adjustments without approval of each one, but the procedures for them must be “reviewed in advance by the quality control unit” | Comment 1033 |
| Does “reject” mean destroy? | No. Reprocessing, reworking, diversion to other uses, return to the supplier or destruction “may occur after a decision to reject” | Comments 95 and 1003 |
| Does (c) reach facilities and equipment? | Yes, in FDA’s reading: the unit reviews and approves “all initial design criteria and procedures pertaining to facilities and equipment and any subsequent changes” | 2006 guidance IV.B.38 |
FDA also wrote in 1978 that the rules “do not subordinate the quality control unit’s authority and responsibility to any other unit” and “do not dictate the organizational structure of a firm”: they “simply require that the quality control unit have final responsibility for certain actions in the manufacturing process”.3 FDA’s 2006 guidance keeps the line from the other side: the unit “should not take on the responsibilities of other units of a manufacturer’s organization, such as the responsibilities handled by manufacturing personnel, engineers, and development scientists.”8
AQuestions and answers
What is the difference between 21 CFR 211.22 and 211.192?
Section 211.22(a) gives the quality control unit the authority to review production records and to see that errors are fully investigated. Section 211.192 is the duty itself: the unit reviews and approves every batch’s production and control records before release, and any unexplained discrepancy or specification failure is thoroughly investigated, extended to other batches that may be affected and written up with its conclusions and follow-up. FDA has standard citations for both: a unit lacking the authority is cited under 211.22(a), records not reviewed and approved by the unit under 211.192.
Does 21 CFR 211.22 require separate QA and QC departments?
No. It names one quality control unit, which Part 210 defines as any person or organizational element the firm designates to be responsible for quality control duties, and FDA said in 1978 that the rule does not dictate a firm’s organizational structure. FDA’s 2006 quality systems guidance notes that industry generally divides the unit’s work between QC and QA. If your procedures divide it, 211.22(d) holds you to the division you wrote.
Can one person be the quality control unit?
In very small operations, yes. FDA said in 1978 that a single individual can function as the quality control unit but still has the responsibility for implementing all the controls and reviewing the results of manufacturing. Its 2006 guidance recommends that another qualified individual, not involved in production, periodically review that person’s quality activities.
Who releases a product made by a contract manufacturer?
The owner’s quality unit approves or rejects it: 211.22(a) says so, and FDA said in 1978 that the responsibility to approve release for distribution must rest with the owner of the drug product. FDA’s 2016 quality agreement guidance adds that the contract facility approves or rejects the products or results of its own operations, and that the quality agreement should be clear about release.
Can a 211.22 observation lead to official action?
A single 483 observation is not FDA’s decision. FDA’s drug inspection program says significant deficiencies, or a trend of them, within a system can show system failure and should lead to a referral for official action indicated (OAI), and its examples for the quality system include a pattern of failure to review, approve or follow procedures and a pattern of failure to conduct investigations and resolve discrepancies.
References8 sources
References
- 121 CFR 211.22, Responsibilities of quality control unit, paragraphs (a) to (d) and source note, eCFR, current to 24 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 22 (read 26 November 2026) - 221 CFR Part 211, source note and Subpart B, eCFR, current to 24 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 26 November 2026) - 3Human and Veterinary Drugs: Current Good Manufacturing Practice in Manufacture, Processing, Packing, or Holding, final rule, 43 FR 45014, preamble paragraphs 89 to 105 (43 FR 45033 to 45035), FDA, 29 September 1978. https:/
/ www. govinfo. gov/ content/ pkg/ FR- 1978- 09- 29/ pdf/ FR- 1978- 09- 29. pdf (read 26 November 2026) - 4Inspection Observations, FY2023, FY2024 and FY2025 Excel files, Summary and Drugs sheets, inspections ending 1 October 2022 to 30 September 2025, FDA, page current as of 16 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- observations (read 26 November 2026) - 5FDA Data Dashboard, Inspections, Citations dataset (entire), downloaded 26 November 2026, inspections ending through 17 November 2026, final classifications only. https:/
/ datadashboard. fda. gov/ oii/ cd/ inspections. htm (read 26 November 2026) - 6Compliance Program 7356.002, Drug Manufacturing Inspections, Part III, quality system, FDA, implementation date 17 October 2022. https:/
/ www. fda. gov/ media/ 75167/ download (read 26 November 2026) - 7Contract Manufacturing Arrangements for Drugs: Quality Agreements, guidance for industry, sections III and IV, FDA, November 2016. https:/
/ www. fda. gov/ media/ 86193/ download (read 26 November 2026) - 8Guidance for Industry: Quality Systems Approach to Pharmaceutical CGMP Regulations, sections III.F and IV.B.3, FDA, September 2006. https:/
/ www. fda. gov/ media/ 71023/ download (read 26 November 2026)