1Steps and the qualification file.
ICH Q10 makes the pharmaceutical company “ultimately responsible” for processes that control the quality of purchased materials, from assessing a supplier before selecting it to checking that materials come “from approved sources using the agreed supply chain”.1 The rules depend on the buyer. ICH Q7 section 7 covers an API maker’s own raw material suppliers; a drug product maker qualifying an API source works under EU GMP Chapter 5 or Part 211 and, where it audits, audits against ICH Q7, the standard FDA and Health Canada also apply to APIs.2,
| Step | What goes on file | Basis |
|---|---|---|
| 1. Rank the risk | Risk class for material and supplier, and the controls it sets | EU 5.27;3 excipient guidelines6 |
| 2. Map the supply chain | Original manufacturer, site and every distributor, back to the active substance’s starting materials; verified periodically | EU 5.29;3 EMA Q&A;7 Q7 7.132 |
| 3. Assess on paper | Questionnaire, quality history, certificates and inspection record; not a substitute for a required audit | Q7 7.31;2 EMA Q&A8 |
| 4. Audit | Report, deficiencies graded, corrective actions assessed, recommendation | EU 5.29;3 EMA Q&A8 |
| 5. Agree in writing | Quality agreement or specification: production, testing, labeling, packaging, distribution, complaints, recalls, rejection | EU 5.28;3 Q10 2.71 |
| 6. Approve the source | Quality unit decision naming manufacturer, site, material and specification, with conditions and date | EU 5.27;3 Q7 7.12;2 211.229 |
| 7. Check each delivery | Approved manufacturer and supplier information at goods receipt; each consignment checked against it | EU 5.30;3 EMA Q&A7 |
| 8. Monitor and requalify | Quality trends, a re-assessment period with its reason, change control for any new source | EU 5.29;3 EMA Q&A;8 Q7 7.142 |
Each approval carries one status on the approved supplier list: approved; approved with conditions, such as an active substance source on paper assessment, which EMA accepts only as an “interim and temporary measure”; or disqualified.8,
1.1Step 1: rank the risk.
EU GMP sets supervision “proportionate to the risks posed by the individual materials”, taking account of their source, manufacturing process, supply chain complexity and final use.3 The EU excipient guidelines rank excipients and their makers as, for example, low, medium or high risk.6 Three tiers built on those factors:
| Tier | Materials, and why | Before approval | Requalify, and why |
|---|---|---|---|
| High | Active substances; excipients with transmissible spongiform encephalopathy (TSE), viral, diethylene or ethylene glycol (DEG/EG) or sterility risk | On-site audit, questionnaire, first lots tested in full | Re-audit at 36 months, 24 after a major finding; repeat audits are required for active substances |
| Medium | Other excipients (impurities, supply chain); primary and printed packaging (contact, mix-ups) | Questionnaire and a gap analysis against the GMP needed; audit where gaps show | Questionnaire every 3 years; audit when defects, trends or changes call for it |
| Low | Unprinted secondary packaging: no product contact, no text | Approval on documents; checks at receipt | Yearly review of receipts and complaints: outside EU 5.45 |
Move a supplier up a tier for a long or broker-led supply chain, known adulteration of that material, or gaps against the GMP it needs.3,
2Which suppliers need an on-site audit?
| Supplier | What the rules expect | Basis |
|---|---|---|
| Active substance | An audit of the manufacturer and of each distributor; a paper-based assessment only as an interim, temporary measure | EU 5.29;3 EMA Q&A8 |
| Excipient | A formalized risk assessment, then a control strategy such as audit, document retrieval or testing | EU 5.29;3 guidelines 3.56 |
| High-risk excipient | Knowledge of the original manufacturer and every repacker or distributor; DEG/EG testing of every container, unless justified | FDA, May 2023;11 EMA Q&A12 |
| Packaging | Primary and printed: supplier selection, qualification and approval get attention similar to starting materials, so audit where the risk assessment calls for it | EU 5.453 |
| API raw materials | A system for evaluating suppliers of critical materials; a supplier audit is one way to rule out cross-contamination from non-dedicated tankers | Q7 7.11 and 7.222 |
| Contract lab or service | Assessed before contracting, then monitored; for a calibration provider, its data governance | EU 7.5 and 7.7;13 EMA Q&A8 |
| Tissue or blood (ATMP) | Authorized EU blood and tissue establishments need no extra audit of donation, procurement and testing; the agreement should allow one | EU Part IV 7.2614 |
For cell and gene therapy, EU GMP Part IV has critical raw materials’ specifications agreed with the supplier, for investigational products whenever possible, and accepts its certificate only once risks are mitigated, “e.g. qualification of suppliers”; for raw materials authorized as EU medicinal products, such as human serum albumin, no certificate is required. Biological raw materials’ supply chains are assessed for viral, microbial and TSE risk.14 See cell and gene therapy GMP.
3Supplier questionnaire.
| Field | Ask for | Source |
|---|---|---|
| Sites | Manufacturing site address; the original manufacturer if the supplier is not it | Q7 7.13;2 EU 5.273 |
| Supply chain | Every distributor, repacker and storage point between maker and you | EU 5.29;3 EMA Q&A7 |
| Quality system | Pharmaceutical quality system; batch release by QC independent of production; change, deviation, complaint and recall systems; self-inspection; contracts for outsourced work | Guidelines 2.66 |
| Certificates | Quality-system and GMP certificates, and the standard each was granted against; recent inspections and outcomes | Guidelines 3.3;6 EMA Q&A8 |
| Filings | ASMF, US DMF or CEP reference; written authorization to reference a DMF | EU variations Q.I.a.1(f), Q.III.1;15 21 CFR 314.420(b)16 |
| Shared facilities | Other products made at the site, and which share equipment or buildings | EU 5.29;3 EMA Q&A8 |
| Contamination risks | TSE, viral, microbial and endotoxin risks; impurity and residual solvent profiles | Guidelines 2.3;6 C.02.0105 |
| Certificate systems | How certificates are produced and reviewed, and notice of significant system changes | EMA data integrity Q&A8 |
| Change notice | Commitment to report process or specification changes and significant deviations | C.02.0105 |
4Example: qualifying an API manufacturer.
Example, all invented. Site A holds an EU manufacturing authorization and makes tablets for the EU and US. It needs a second source of API-Z and chooses Supplier S, which makes API-Z at Site M and at a second plant, Site N. Site A uses the risk tiers above.
| Date in 2026 | Step | Record |
|---|---|---|
| 6 January | Risk class | High: active substance for an oral tablet. Plan: on-site audit, three lots fully tested |
| 9 January | Supply chain | Starting material from Supplier R to Site M, then by road direct to Site A; no distributor |
| 22 January | Desk assessment | Questionnaire: four other APIs made in shared equipment; EEA GMP certificate from 2024; no FDA warning letter or EU non-compliance statement found |
| 16 to 18 February | Audit | Two named auditors, 3 days on site against ICH Q7, focused on shared equipment; 1 major finding (cleaning validation of a shared dryer), 4 minor |
| 20 March | CAPA assessed | Plan and dates accepted; recommendation: approve Site M, re-audit in 24 months |
| 5 May | Agreement | Quality agreement signed, including notice of changes and deviations |
| 12 May | Approval | Supplier S, Site M, API-Z, specification SP-0412 version 3, direct supply only; every lot fully tested |
| 18 June | CAPA closed | Revised dryer cleaning validation report reviewed; major finding closed with evidence |
| 10 August | Review | Three lots tested in full and matching the certificates; reduced testing approved |
| 2 October | Change | Supplier S proposes supplying from Site N; change control opened; Site N not approved |
Risk ranking to approval took 18 weeks: ten to the accepted corrective action plan, then seven and a half, mostly for the quality agreement. Reduced testing waited three more months for three lots. The approval covers Site M only, not every site of Supplier S, so the October proposal is a new qualification through change control, not an update.
Selling tablets made with Site M’s API also depends on the marketing authorizations. In the EU, adding Site M is a variation under category Q.I.a.1: Type IAIN when route, specifications and batch size match those approved and the substance is neither biological nor sterile, with batch analysis from both sites and a Qualified Person’s declaration that Site M complies with GMP; Type II when it rests on an active substance master file. A source holding a certificate of suitability (CEP) is added under category Q.III.1 instead.15 In the US it is a prior approval supplement, a changes-
5Monitoring, requalification and disqualification.
ICH Q10 asks for monitoring and review of “the quality of the material from the provider”, and any improvements needed.1
| Trigger | What it calls for | Basis |
|---|---|---|
| Requalification lapsed | The supplier is no longer adequately qualified; FDA cited a firm for using one | Happy Farm, 202618 |
| Data-integrity action | A regulator’s warning letter or non-compliance statement: risk-assess affected products; delisting is possible | EMA DI Q228 |
| Certificate lost | For an excipient maker, review the risk and revise the control strategy | Excipient guidelines 4.16 |
| Defects or trends | Review the number, type and severity of defects and the quality trend; revise controls | Excipient guidelines 4.16 |
| CoA discrepancy | Investigate; stop accepting the supplier’s certificates until measures are complete | EU 5.36(v)3 |
| Unnotified change | A breach of the agreed duty to notify: assess the change, and test in full after a significant process change | C.02.010;5 EU 5.36(iv)3 |
6What an audit report must show.
EMA lists what inspectors expect in an audit report on an active substance manufacturer:8
- the site’s full postal address, ownership, age, staff numbers and role in making each active substance;
- the auditors’ names and employers, on whose behalf the audit was done, the key staff taking part and the contact who arranged it;
- audit dates, with the time on site justified;
- scope against the EU GMP Part II or ICH Q7 chapters, what was not covered, and the high-risk areas chosen;
- every product and intermediate made at the site, the buildings audited, any area where access was refused, and which products share equipment;
- dates and outcomes of earlier audits;
- findings against each section, each deficiency graded, for example critical, major or minor;
- the auditors’ review of the supplier’s corrective actions, an overall recommendation including whether reduced controls at receipt are supported, a re-assessment period, and the lead auditor’s signature and date.
Inspectors may ask for the full report, the site’s responses and evidence that deficiencies were closed.8 A GMP certificate does not replace it: EMA says certificates and inspection reports “alone cannot fulfil” the manufacturer’s obligations or section 5.29, though they can inform a risk-based audit program.8
Third-party audits are acceptable under conditions EMA updated in April 2025: conflicts of interest declared and assessed, including auditors who “stand to make commercial gain from sale or supply of an audit report”, and a written final assessment of each report covering contract, scope, duration, auditor competence, frequency, corrective actions and conflicts, for which the Qualified Person has “the ultimate responsibility”.8
7How the rules differ.
| Point | FDA, drugs | EU GMP | Health Canada |
|---|---|---|---|
| Supplier audits | Not in Part 211, but FDA can cite failure to “evaluate, qualify, audit, and monitor” contract facilities | Required for active substance manufacturers and distributors | Audit report needed to certify a vendor |
| Who approves | Quality control unit approves or rejects components | Documented approval with evidence kept | Only approved fabricators named in the specification |
| Relying on supplier tests | Validated, with your own identity test on each lot | Five conditions, including audits of testing sites | Vendor certification, first three lots fully tested |
| Brokers, distributors | Identity testing of every container “may be valuable”, particularly from distributors | Buy direct “where possible” | Brokers generally can’t be certified |
The PIC/S GMP guide (PE 009-18, September 2026) carries the same Chapter 5 supplier text in substance, and MHRA’s GMP guidance lists EudraLex Volume 4, so the EU column also describes PIC/S and UK expectations.22,
8How inspectors enforce it.
As a pre-inspection checklist, FDA’s 2026 letters to TSP Solutions, Happy Farm Botanicals and SnugZ USA ask for:10,
- an evaluation of every supplier of components, containers and closures, to show each is reliable and appropriately qualified;
- a historical review of whether each material is consistently of acceptable quality;
- the program’s “selection, qualification, and disqualification provisions”;
- “vigilant lifecycle monitoring of all suppliers using sound quality risk management practices”;
- the specifications used to release each incoming lot, a commitment to a specific identity test on every lot, and results showing each manufacturer’s certificate is reliable;
- the program for qualifying and overseeing contract facilities that test components and products.
FDA cites supplier qualification alongside identity testing and traceability. Harbin Jixianglong Biotech Co., Ltd., warning letter of 1 May 2026:30
On (b)(4), your firm purchased semaglutide API (batch (b)(4)) from (b)(4), a supplier that was not on your approved supplier list.
Happy Farm Botanicals, Inc., 1 September 2026:18
Additionally, you did not adequately qualify your (b)(4) supplier as the requalification date had lapsed.
Almon Healthcare Private Limited, 13 July 2026, after accepting material the supplier had deliberately mislabeled:4
Furthermore, your QU relied on your supplier’s certificate of analysis without conducting supplier qualification as your standard operating procedure requires.
9How it runs in Seal.
In Seal’s supplier quality management, each receipt is compared with the recorded qualification scope: the manufacturer, site, material and specification the approval covers. A new site or revised specification becomes linked qualification work, approvals can carry conditions and expiry, and qualification, material disposition and batch release remain separate decisions. Neil, Seal’s AI agent, can check a receipt against the approved supplier scope and prepare an exception-review package; supplier quality decides qualification and disposition.
For ongoing monitoring, Neil builds supplier scorecards by counting on-time and in-full delivery from every receipt line and quality from inspections and nonconformances, with each number linked to the records it was counted from. When a supplier announces a change, supplier change notifications trace the changed material through every use and keep old, transitional and changed inventory distinct until each site and market may use it.
AQuestions and answers
Can a supplier be approved before the audit?
For an active substance in the EU, only as a stopgap. EMA accepts paper-based assessments, such as questionnaires, document review, analytical results and history with the supplier, as a useful interim and temporary measure, particularly where recent positive inspection information exists and earlier audits were satisfactory, but never as a replacement for the on-site audit. One limit applies: the QP must not release product without knowing the auditors’ positive recommendation, so paper alone cannot support release of product made from an active substance source never audited. Record the conditions of the interim approval and the date by which the audit must happen.
How often should suppliers be requalified?
EU GMP, ICH Q7 and Part 211 set no fixed interval. EU GMP asks for further audits at intervals defined by quality risk management, and EMA expects each audit report to propose a re-assessment period. Set the interval by the material’s risk and the supplier’s record, and write down the reason.
Does approving a supplier cover all of its sites?
No. Qualification applies to a defined material from a named manufacturing site through an agreed supply chain. A different site of the same company is a different source: ICH Q7 treats a change in the source of a critical raw material as a change control, and EU GMP checks each delivery against the approved manufacturer information.
What is an approved supplier list?
It is the controlled record of which manufacturer, site and supplier the quality unit has approved for each material, with any conditions. Receiving checks against it: EU GMP compares each delivery with approved manufacturer and supplier information, Health Canada requires raw materials from approved fabricators named in the specification, and FDA has cited a firm for buying API from a supplier that was not on its list. Removing a supplier from the list is how disqualification takes effect.
Who approves a supplier?
The quality unit. ICH Q7 says materials should be bought from suppliers approved by the quality unit, and US CGMP gives the quality control unit the authority to approve or reject components, containers and closures. Other functions take part: WHO makes the person responsible for quality control responsible for approving suppliers together with other relevant departments, and EU GMP asks that everyone selecting and qualifying suppliers has current knowledge of the suppliers, the supply chain and its risks.
References30 sources
References
- 1ICH Q10, Pharmaceutical Quality System, section 2.7, ICH, 4 June 2008. https:/
/ database. ich. org/ sites/ default/ files/ Q10%20Guideline. pdf (read 26 November 2026) - 2ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, sections 7.1 to 7.3, ICH, 10 November 2000. https:/
/ database. ich. org/ sites/ default/ files/ Q7%20Guideline. pdf (read 26 November 2026) - 3EudraLex Volume 4, Part I, Chapter 5, Production, sections 5.27 to 5.30, 5.35, 5.36 and 5.45, European Commission, in operation from 1 March 2015. https:/
/ health. ec. europa. eu/ document/ download/ 4a1fdb4f- 6f6f- 49c4- b264- 8056e5bbe078_ en?filename=chapter_ 5. pdf (read 26 November 2026) - 4Warning letter to Almon Healthcare Private Limited, MARCS-CMS 729291, FDA, 13 July 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ almon- healthcare- private- limited- 729291- 07132026 (read 26 November 2026) - 5Good manufacturing practices guide for drug products (GUI-0001), sections C.02.009 and C.02.010, Health Canada, published July 2020, page modified 17 April 2026. https:/
/ www. canada. ca/ en/ health- canada/ services/ drugs- health- products/ compliance- enforcement/ good- manufacturing- practices/ guidance- documents/ gmp- guidelines- 0001/ document. html (read 26 November 2026) - 6Guidelines of 19 March 2015 on the formalised risk assessment for ascertaining the appropriate good manufacturing practice for excipients of medicinal products for human use (2015/C 95/02), sections 2.2 to 2.6, 3.1 to 3.5 and 4.1, Official Journal of the European Union. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ?uri=CELEX:52015XC0321(02) (read 26 November 2026) - 7Guidance on good manufacturing practice and good distribution practice: questions and answers, EU GMP Part I Chapter 5, question 2 (August 2015), EMA. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers#chapter- 5 (read 26 November 2026) - 8Guidance on good manufacturing practice and good distribution practice: questions and answers, EU GMP Part II active substance questions 2, 3, 4, 8, 9 and 10 (third-party audits and final assessment updated April 2025), and data integrity questions 20 to 22, EMA. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers (read 26 November 2026) - 921 CFR 211.22, Responsibilities of quality control unit, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 22 (read 26 November 2026) - 10Warning letter to TSP Solutions Pte. Ltd., MARCS-CMS 735071, FDA, 22 October 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ tsp- solutions- pte- ltd- 735071- 10222026 (read 26 November 2026) - 11Testing of Glycerin, Propylene Glycol, Maltitol Solution, Hydrogenated Starch Hydrolysate, Sorbitol Solution, and other High-Risk Drug Components for Diethylene Glycol and Ethylene Glycol, guidance for industry, Revision 1, FDA, May 2023. https:/
/ www. fda. gov/ media/ 167974/ download (read 26 November 2026) - 12Guidance on good manufacturing practice and good distribution practice: questions and answers, Annex 8: excipients at high risk of DEG/EG contamination, question 4 (January 2025), EMA. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers#annex- 8 (read 26 November 2026) - 13EudraLex Volume 4, Part I, Chapter 7, Outsourced Activities, sections 7.5 and 7.7, European Commission, in operation from 31 January 2013. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ vol4- chap7_ 2012- 06_ en_ 0. pdf (read 26 November 2026) - 14EudraLex Volume 4, Part IV, Guidelines on Good Manufacturing Practice specific to Advanced Therapy Medicinal Products, sections 7.14 to 7.16 and 7.26, European Commission, adopted 22 November 2017, operational from 22 May 2018. https:/
/ health. ec. europa. eu/ system/ files/ 2017- 11/ 2017_ 11_ 22_ guidelines_ gmp_ for_ atmps_ 0. pdf (read 26 November 2026) - 15Guidelines on the details of the various categories of variation (C/2025/5045), categories Q.I.a.1 and Q.III.1, European Commission, Official Journal C series, 22 September 2025, applying from 15 January 2026. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ?uri=OJ:C_ 202505045 (read 26 November 2026) - 1621 CFR 314.420, Drug master files, paragraphs (a) to (c), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 314. 420 (read 26 November 2026) - 1721 CFR 314.70, Supplements and other changes to an approved NDA, paragraphs (a) to (d), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 314. 70 (read 26 November 2026) - 18Warning letter to Happy Farm Botanicals, Inc., MARCS-CMS 731926, FDA, 1 September 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ happy- farm- botanicals- inc- 731926- 09012026 (read 26 November 2026) - 1921 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, eCFR, up to date as of 24 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 26 November 2026) - 20Contract Manufacturing Arrangements for Drugs: Quality Agreements, guidance for industry, section V.B, FDA, November 2016. https:/
/ www. fda. gov/ media/ 86193/ download (read 26 November 2026) - 21Questions and Answers on Current Good Manufacturing Practice Requirements: Control of Components and Drug Product Containers and Closures, question 4, FDA, content current as of 16 November 2022. https:/
/ www. fda. gov/ drugs/ guidances- drugs/ questions- and- answers- current- good- manufacturing- practice- requirements- control- components- and- drug (read 26 November 2026) - 22PIC/S Guide to Good Manufacturing Practice for Medicinal Products, PE 009-18, Part I, Chapter 5, PIC/S, 24 September 2026. https:/
/ picscheme. org/ en/ publications?tri=gmp (read 26 November 2026) - 23Medicines: good manufacturing practice and good distribution practice, MHRA, last updated 13 May 2024. https:/
/ www. gov. uk/ guidance/ good- manufacturing- practice- and- good- distribution- practice (read 26 November 2026) - 24WHO good manufacturing practices for pharmaceutical products: main principles, WHO Technical Report Series No. 986, Annex 2, sections 8.8 and 8.9, World Health Organization, 2014. https:/
/ www. who. int/ publications/ m/ item/ trs986- annex2 (read 26 November 2026) - 2521 CFR 200.10, Contract facilities (including consulting laboratories) utilized as extramural facilities by pharmaceutical manufacturers, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 200. 10 (read 26 November 2026) - 26General Chapter 〈1083〉 Supplier Qualification, USP–NF, United States Pharmacopeia, 2023, public preview. https:/
/ doi. org/ 10. 31003/ USPNF_ M6562_ 02_ 01 (read 26 November 2026) - 2721 CFR Part 820, Quality Management System Regulation, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820 (read 26 November 2026) - 28Quality Management System Regulation: Frequently Asked Questions, question 8, FDA. https:/
/ www. fda. gov/ medical- devices/ quality- management- system- regulation- qmsr/ quality- management- system- regulation- frequently- asked- questions (read 26 November 2026) - 29Warning letter to SnugZ USA, Inc., MARCS-CMS 735284, FDA, 28 September 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ snugz- usa- inc- 735284- 09282026 (read 26 November 2026) - 30Warning letter to Harbin Jixianglong Biotech Co., Ltd., MARCS-CMS 723330, FDA, 1 May 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ harbin- jixianglong- biotech- co- ltd- 723330- 05012026 (read 26 November 2026)