1The steps and deliverables, as a checklist.
WHO expects a computerized system to be validated “according to an approved protocol and a final report including results and conclusions, prior to routine use”.1 Annex 11 asks the documents to “cover the relevant steps of the life cycle”, justified by the risk assessment.2 Copy the table into your validation plan, and where your risk assessment shows a row isn’t needed, record why.
| Step | Deliverable | Owner | What it must show | Clause |
|---|---|---|---|---|
| 1. Inventory | Inventory entry; system description if critical | Process owner | GMP function, criticality and validation status; for critical systems, data flows, interfaces and security | Annex 11 4.3;2 PI 041-1 9.33 |
| 2. Plan | Validation plan or protocol | Process owner, QA | Scope, risk approach, specification, acceptance criteria, testing, review, training and release, with roles | WHO 3.3 and 3.41 |
| 3. Risk assessment | System and function risk assessment | Process owner, system owner | The extent of validation and data integrity controls | Annex 11 12 |
| 4. Requirements | User requirements specification (URS) | Process owner | Required functions, intended uses and critical data, based on risk and GMP impact | Annex 11 4.4;2 WHO 5.21 |
| 5. Records, signatures | Part 11 and Annex 11 assessment | Process owner, QA | Which records and signatures are GMP records, and the audit trail, access, signing and printout controls each needs | 21 CFR 11.10, 11.50 and 11.70;4 Annex 11 8, 9, 12 and 142 |
| 6. Supplier | Supplier assessment; formal agreement | QA | Competence, an audit where risk calls for one, the third party’s duties in writing, supplier documents checked against the URS | Annex 11 3.1 to 3.3 and 4.52 |
| 7. Specifications | Functional and configuration specifications; design review | System owner | Functions and settings, including the audit trail configuration, traceable to the requirements they meet | WHO 5.5, 5.6, 6 and 71 |
| 8. Installation (IQ) | IQ record | System owner, IT | Installed and configured as specified in the test and production environments | WHO 9.1 to 9.31 |
| 9. Function (OQ) | OQ scripts and results | Validation lead | Alarms and error messages; boundary, range, limit and nonsense-entry tests; parameter limits, data limits and error handling | WHO 10.2;1 Annex 11 4.72 |
| 10. Data migration | Migration check | Process owner | Data “not altered in value and/or meaning” | Annex 11 4.8;2 WHO 13.13 and 13.141 |
| 11. SOPs and training | Procedures; training records | Process owner | Use, audit trail review, signing, access, backup and restore, change and incident handling, in place before PQ | WHO 11.1 and 11.21 |
| 12. Use (PQ and UAT) | PQ and UAT records | Users | Intended use in the live or an equivalent environment, including review of data and audit trails | WHO 12.1 to 12.51 |
| 13. Traceability | Traceability matrix | Validation lead | Each requirement linked to its risk, tests and results: PQ to URS, OQ to functional specification, IQ to design | Annex 11 4.4;2 PI 011-3 23.105 |
| 14. Report and release | Validation report; release | QA | Results against acceptance criteria, deviations root-caused, a stated conclusion, then release | WHO 3.5 to 3.81 |
| 15. Operation | Change, incident, audit trail review, backup and periodic review records; continuity plan | System owner | Controlled changes, restore checks, incidents assessed, a tested fallback for critical processes, periodic evaluation | Annex 11 7.2, 9 to 11, 13 and 16;2 WHO 13.151 |
| 16. Retirement | Retirement plan and report | Process owner, QA | Records archived in readable form, with retrieval tested and reported | WHO 14;1 Annex 11 172 |
1.1How the rows scale.
- Not configurable, such as a balance or pH meter that stores no data: MHRA says these “may only require calibration”.6 Rows 1 and 3 still apply: list it, and record the risk assessment that justifies calibration alone.
- Configured off-the-shelf, such as a LIMS: review the supplier’s documentation against the URS2 and test what you configure. ICH Q7 says qualified commercial software “does not require the same level of testing”.7 Every row applies, with OQ aimed at the configuration.
- Bespoke or customized: Annex 11 adds “formal assessment and reporting of quality and performance measures for all the life-cycle stages”.2 WHO expects custom-developed and configurable systems to be developed under a documented quality system, with code written and reviewed to documented programming standards and development testing that may include unit and integration testing.1
FDA calls IQ, OQ and PQ “one of many legitimate ways to organize software validation tasks at the user site”.8 Software categories are in GAMP 5 categories.
2Where the duty to validate comes from.
| Source | Status | What it asks |
|---|---|---|
| 21 CFR 211 | US regulation, finished drugs | FDA reads 211.63, 211.68(b) and 211.110(a) as making each CGMP workflow “an intended use of a computer system to be checked through validation”9 |
| 21 CFR 11.10(a) | US regulation, electronic records | “Validation of systems”, under enforcement discretion since 2003 (below)4 |
| ISO 13485 | US devices, through 21 CFR 820.10 | Subclauses 4.1.6, 7.5.6 and 7.6: validate production and quality management system software for its intended use10, |
| Directive (EU) 2017/1572 | EU law, human medicines | Article 9(2): systems used instead of written documents are first validated “by showing that the data will be appropriately stored during the anticipated period of storage”12 |
| EU GMP Annex 11 | EU guideline, since 30 June 2011 | “The application should be validated; IT infrastructure should be qualified.”2 |
| Regulations (EU) 2025/2091 and 2025/2154 | EU law, veterinary medicines and their active substances, since 16 July 2026 | Annex IV, II.1: “Any related software application shall also be validated”;13 Article 20(1): “Computerised systems related to the good manufacturing practices for active substances shall be validated”14 |
| ICH Q7 5.40 | Guideline for APIs | “GMP related computerized systems should be validated”, to a depth set by “diversity, complexity and criticality”7 |
In the US the validation duty FDA enforces comes from the predicate rules, not Part 11. FDA’s 2003 guidance says it “intends to exercise enforcement discretion regarding specific part 11 requirements for validation of computerized systems (§ 11.10(a) and corresponding requirements in § 11.30)”, while firms “must still comply with all applicable predicate rule requirements for validation”. It recommends basing the decision to validate, and its extent, on “a justified and documented risk assessment”.15 The rest of Part 11 is in Part 11 requirements.
The system is wider than the software: FDA says “computer or related systems” can mean “computer hardware, software, peripheral devices, networks, cloud infrastructure, personnel, and associated documents”. Qualifying an MES platform shows it meets its specifications, but “it does not demonstrate that a given MPCR generated by the MES contains the correct calculations”.9
3Example: one LIMS calculation from requirement to release.
Example. Calderbrook, an invented tablet site, configures a laboratory information management system (LIMS) to calculate assay results for Ostrivane 50 mg tablets. The results feed batch release, so the system is in the inventory as GMP critical. Its URS has 42 requirements: 9 rated high risk, 21 medium and 12 low. One high-risk requirement, followed through every deliverable:
- URS-014. The LIMS reports assay as a percentage of the 50 mg label claim, rounded half up to one decimal place, compares the rounded result with the limits, flags results below 95.0% or above 105.0% as out of specification, and refuses blank or non-numeric entries.
- Risk RA-014. Failure: a result outside the limits is reported as passing, or one inside is flagged. Impact: high, because it reaches batch release. Control: a scripted OQ test with boundary, rounding and invalid entries, then PQ by analysts.
- OQ test TC-014. Run on 12 October 2026 by a validation analyst who signed and dated each step, and reviewed by QA on 13 October, with screenshots TC-014-S1 to S9 as the “evidence of testing” WHO asks for.1
| Step | Entry (mg per tablet) | Expected | Actual | Result |
|---|---|---|---|---|
| 1 | 50.00 | 100.0%, passes | 100.0%, passed | Pass |
| 2 | 47.50 | 95.0%, passes at the lower limit | 95.0%, passed | Pass |
| 3 | 47.47 | 94.94% reported as 94.9%, flagged | 94.9%, flagged | Pass |
| 4 | 47.48 | 94.96% reported as 95.0%, passes | 95.0%, passed | Pass |
| 5 | 52.52 | 105.04% reported as 105.0%, passes | 105.0%, passed | Pass |
| 6 | 52.53 | 105.06% reported as 105.1%, flagged | 105.1%, flagged | Pass |
| 7 | 52.525 | 105.05% reported as 105.1% (half up), flagged | 105.1%, flagged | Pass |
| 8 | Blank | Entry refused | Accepted, reported as 0.0%, flagged | Fail: DEV-LIMS-003 |
| 9 | “4x.50” | Entry refused | Refused with an error message | Pass |
- Deviation DEV-LIMS-003. The root cause was a result field the configuration specification hadn’t marked as mandatory. It was corrected under change control. The regression assessment found two other test cases that use the field, TC-015 and TC-022; both were rerun with the whole of TC-014, and all passed on 14 October 2026, so the discrepancy was resolved “prior to proceeding to subsequent test phases”.1
- PQ. From 19 to 30 October 2026, two analysts entered 20 results from earlier batches in the live configuration under restricted release, and all 20 matched the approved paper results. A reviewer confirmed that a corrected entry showed the original value, the new value, the user, the time and the reason.
- Report VR-LIMS-01, approved on 4 November 2026. The 9 high-risk requirements had 33 test cases and the 21 medium ones had one each, 54 in all: 53 passed first time and 1 passed after DEV-LIMS-003. The 12 low-risk requirements relied on the supplier’s release testing, reviewed against the URS. The LIMS was released for GMP use on 5 November 2026, with its first periodic review due in November 2027.
Read in either direction, URS-014, RA-014, TC-014, DEV-LIMS-003 and VR-LIMS-01 form one line of a traceability matrix; writing requirements like URS-014 is in the URS guide, and the site’s validation master plan schedules this release.
4How it runs in Seal.
In Seal’s computer system assurance, URS-014 is a requirement with its risk and the test cases that cover it. The analyst works through TC-014 as a test run, recording what happened at each step, Pass or Fail, and a screenshot where the step asks for one. The failed blank entry raises a warning that has to be answered and is recorded as a deviation, linked to its correction and retest.
The release is a change control. A rule can require a Check that passes only when every approved test case has a finished, passing run on the version being released, and the change cannot publish until that Check passes and every sign-off is given. Each requirement then shows which tests cover it, whether they passed and on which version, so the trace view is generated from the records rather than reconciled at the end. Where your plan uses IQ, OQ and PQ, validation in Seal maps the evidence onto them.
5What inspectors check.
5.1Which FDA program covers a pre-approval inspection.
| Application | Program | Computerized systems |
|---|---|---|
| NDA or ANDA | CP 7346.832, implemented 10 August 2026 | No checklist, and the word “computer” doesn’t appear. Objective 3, the data integrity audit, compares raw data, “hardcopy or electronic”, with the summary data filed16 |
| CDER BLA | CP 7346.832M, implemented 14 May 2026 | A computerized systems checklist, below17 |
| CBER BLA | CP 7345.848, implemented 1 October 2010 | A pre-license inspection covers all systems; investigators “determine if the software for computers and automated data processing systems are validated”18 |
5.2FDA.
In routine drug inspections, CP 7356.002 covers the “validation and security of computerized or automated processes” in the materials, production and laboratory systems, and lists their “Lack of validation” among problems that can lead to regulatory action.19 For CDER biologics, CP 7346.832M tells the team to, at a minimum:17
- “Confirm that computerized systems involved in product manufacturing operations are validated for their intended use.”
- Verify written procedures for operating and maintaining the systems, and access controls that “prohibit unauthorized access, unauthorized changes to data, and deletion of data”.
- Verify the administrator role is “assigned to personnel independent from those responsible for the record content”, and the quality unit controls the list of authorized users.
- Verify audit trails are “properly configured, enabled, and locked”, critical-data audit trails are independently reviewed at data review and batch release, and aborted or incomplete runs are captured and investigated.
- Verify changes are “authorized, documented, and validated”, and that restoring backed-up data is verified.
Recent warning letters show what failing those checks looks like:
“Your GC laboratory instrument was not adequately qualified because you failed to validate the control software or enable audit trails, and the GC data file creation and modification dates were not accurate.” Laboratorios Jaloma S.A. de C.V., warning letter 320-26-78, 22 May 202620
“Your quality assurance employee instructed your software vendor to make changes to your electronic batch record which were not captured in the audit trail or managed through your quality system.” Intas Pharmaceuticals Limited, warning letter 320-26-57, 30 March 202621
Jaloma maps to rows 7 and 9 of the checklist, Intas to rows 6 and 15.
5.3UK and PIC/S.
PIC/S tells inspectors to select the GxP-critical systems from the information the site provides and “consider firstly the validation evidence for the selected system(s) and then the routine operational controls for maintaining a valid system”, to “Look for evidence of inconsistency, or muddled standards”, and to check each test phase against its specification, as row 13 does.5
Neither data integrity guide accepts the vendor’s package alone. MHRA says “the acceptance of vendor-supplied validation data in isolation of system configuration and users intended use is not acceptable”.6 PIC/S wants “specific tests to ensure data integrity is maintained during operations that reflect normal and intended use”.3
6Judgment calls the sources settle.
| Question | What the sources say |
|---|---|
| GMP and non-GMP use | Assess and mitigate the potential for non-CGMP functions to affect CGMP operations9 |
| Replacing manual work | No loss of product quality, process control or quality assurance, and no increase in overall process risk2 |
| Periodic review | Performance, security, maintenance, changes and upgrades, deviations, incidents and audit trails, documents, procedures, training, CAPA effectiveness1 |
How much testing each function needs is in risk-based validation, cloud systems in validating SaaS and spreadsheets in spreadsheet validation.
7What changed in 2025 and 2026.
- FDA, devices. The Computer Software Assurance guidance of 3 February 2026 replaces the version of 24 September 2025. It covers software used in device production or the quality management system, and supplements the 2002 software validation guidance “except this guidance supersedes Section 6” of it.10 The comparison is in CSV vs CSA.
- FDA, device regulation. Since 2 February 2026, 21 CFR Part 820 incorporates ISO 13485:2016 by reference and has no section 820.70, so a guide that sends device makers to 820.70(i) is out of date.22,
11 - EU. Drafts of a revised Annex 11, a revised Chapter 4 and a new Annex 22 on artificial intelligence were open for consultation from 7 July to 7 October 2025.23 On 25 November 2026 they are still drafts: the Commission still lists Annex 11 “(revision January 2011)” and no Annex 22, so the 2011 text is in force for human medicines.24 What the draft changes is in the Annex 11 revision.
AQuestions and answers
What goes in a computer system validation report?
WHO’s guideline sets out the contents. The report refers to the protocol, outlines how validation was done and evaluates the results against the predetermined acceptance criteria. It describes each change or deviation from the protocol, with the justification for accepting or rejecting it and the root cause of each deviation, and summarizes the procedures and training in place. It ends by stating whether validation succeeded, with recommendations for future monitoring where needed, and is approved before the system is released for routine GMP use.
Who is responsible for computer system validation?
The regulated company. Annex 11 names the process owner, who is responsible for the business process, the system owner, who looks after the system and the security of its data, Qualified Persons and IT, and asks each to have defined responsibilities. Suppliers can do parts of the work under a formal agreement, but the company defines the intended use, reviews the supplier’s evidence against its own requirements and approves release.
How do you validate a legacy system that was never validated?
Start by justifying why it is still in use and how critical it is. Then write or confirm the user requirements, run a gap analysis of the documents that exist, such as specifications, qualification records and SOPs, and formally review its history of use, maintenance, error reports and changes. Where that evidence falls short, qualify the system retrospectively. History alone won’t do if the system now runs outside its old operating ranges or the process has changed.
What is the difference between computer system validation and software validation?
Software validation proves that a piece of software meets its specifications and intended use. Computer system validation covers everything the process relies on: software, hardware, infrastructure, networks, the people who use it and their procedures, in the way the GxP process uses them. A validated software package can still sit in a system that isn’t validated for its intended use.
Can validation testing be done in a test environment instead of production?
Partly. WHO accepts performance qualification in a test environment only if it is functionally equivalent to the live one in its overall software and hardware configuration; otherwise PQ runs in the live environment, under restricted release for GMP use if needed. Installation qualification covers both the test and the production environments, and some end-to-end or regression testing should show the system works once fully configured and deployed in production.
Is IT infrastructure validated or qualified?
Qualified. Under Annex 11, the application is validated and the IT infrastructure it runs on is qualified. Annex 11 defines that infrastructure as the hardware and software, such as networking software and operating systems, that makes it possible for the application to function.
References24 sources
References
- 1WHO Technical Report Series No. 1019, Annex 3, Good manufacturing practices: guidelines on validation, Appendix 5, Validation of computerized systems, sections 3 to 14, World Health Organization, 2019. https:/
/ www. who. int/ docs/ default- source/ medicines/ norms- and- standards/ guidelines/ production/ trs1019- annex3- gmp- validation. pdf (read 25 November 2026) - 2EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, revision 1, in operation from 30 June 2011, principle, sections 1 to 17, and glossary. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 25 November 2026) - 3PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, section 9.3. https:/
/ picscheme. org/ docview/ 4234 (read 25 November 2026) - 421 CFR Part 11, sections 11.10, 11.50 and 11.70, eCFR, up to date as of 23 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11 (read 25 November 2026) - 5PI 011-3, Good Practices for Computerised Systems in Regulated “GxP” Environments, PIC/S, 25 September 2007, sections 23.6 and 23.10. https:/
/ picscheme. org/ docview/ 3444 (read 25 November 2026) - 6‘GXP’ Data Integrity Guidance and Definitions, revision 1, MHRA, March 2018, sections 4.3 and 6.19. https:/
/ assets. publishing. service. gov. uk/ media/ 5aa2b9ede5274a3e391e37f3/ MHRA_ GxP_ data_ integrity_ guide_ March_ edited_ Final. pdf (read 25 November 2026) - 7ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, ICH, 10 November 2000, sections 5.40 to 5.42. https:/
/ database. ich. org/ sites/ default/ files/ Q7%20Guideline. pdf (read 25 November 2026) - 8General Principles of Software Validation; Final Guidance for Industry and FDA Staff, FDA, 11 January 2002, section 3.1.3. https:/
/ www. fda. gov/ media/ 73141/ download (read 25 November 2026) - 9Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, questions 1.f and 3. https:/
/ www. fda. gov/ media/ 119267/ download (read 25 November 2026) - 10Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026, sections I to III. https:/
/ www. fda. gov/ media/ 188844/ download (read 25 November 2026) - 1121 CFR Part 820, Quality Management System Regulation, including 820.10, eCFR, up to date as of 23 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820 (read 25 November 2026) - 12Commission Directive (EU) 2017/1572 of 15 September 2017 on the principles and guidelines of good manufacturing practice for medicinal products for human use, Article 9(2), Official Journal of the European Union L 238, 16 September 2017. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ?uri=CELEX:32017L1572 (read 25 November 2026) - 13Commission Implementing Regulation (EU) 2025/2091 of 17 October 2025 laying down good manufacturing practice for veterinary medicinal products, applicable from 16 July 2026, Annex IV, point II.1, EUR-Lex. https:/
/ eur- lex. europa. eu/ eli/ reg_ impl/ 2025/ 2091/ oj/ eng (read 25 November 2026) - 14Commission Implementing Regulation (EU) 2025/2154 of 17 October 2025 laying down good manufacturing practice for active substances used as starting materials in veterinary medicinal products, applicable from 16 July 2026, Article 20(1), EUR-Lex. https:/
/ eur- lex. europa. eu/ eli/ reg_ impl/ 2025/ 2154/ oj/ eng (read 25 November 2026) - 15Part 11, Electronic Records; Electronic Signatures: Scope and Application, Guidance for Industry, FDA, August 2003, section III.C.1. https:/
/ www. fda. gov/ media/ 75414/ download (read 25 November 2026) - 16Compliance Program 7346.832, Preapproval Inspections, FDA, issued 29 June 2026, implemented 10 August 2026, Objective 3. https:/
/ www. fda. gov/ media/ 193382/ download (read 25 November 2026) - 17Compliance Program 7346.832M, Prelicense and Preapproval Inspections of CDER-Regulated Biological Product Manufacturers, FDA, issued 14 April 2026, implemented 14 May 2026, Part III, Computerized Systems. https:/
/ www. fda. gov/ media/ 191983/ download (read 25 November 2026) - 18Compliance Program 7345.848, Inspection of Biological Drug Products (CBER), FDA, implemented 1 October 2010, Part III and Attachment 6. https:/
/ www. fda. gov/ media/ 73834/ download (read 25 November 2026) - 19Compliance Program 7356.002, Drug Manufacturing Inspections, FDA, issued 16 September 2022, implemented 17 October 2022, Parts III and V. https:/
/ www. fda. gov/ media/ 75167/ download (read 25 November 2026) - 20Laboratorios Jaloma S.A. de C.V., Warning Letter 320-26-78, FDA, 22 May 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ laboratorios- jaloma- sa- de- cv- 725939- 05222026 (read 25 November 2026) - 21Intas Pharmaceuticals Limited, Warning Letter 320-26-57, FDA, 30 March 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ intas- pharmaceuticals- limited- 721151- 03302026 (read 25 November 2026) - 22Medical Devices; Quality System Regulation Amendments, final rule, FDA, Federal Register 89 FR 7496, 2 February 2024, effective 2 February 2026. https:/
/ www. federalregister. gov/ documents/ 2024/ 02/ 02/ 2024- 01709/ medical- devices- quality- system- regulation- amendments (read 25 November 2026) - 23Stakeholders’ Consultation on EudraLex Volume 4, Good Manufacturing Practice Guidelines: Chapter 4, Annex 11 and New Annex 22, European Commission, 7 July 2025. https:/
/ health. ec. europa. eu/ consultations/ stakeholders- consultation- eudralex- volume- 4- good- manufacturing- practice- guidelines- chapter- 4- annex_ en (read 25 November 2026) - 24EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 25 November 2026)