1The categories at a glance.
The categories sit in Appendix M4 of GAMP 5 Second Edition, “Categories of Software and Hardware”.1 They group components by one question: “What complexity of activity has to be done to create the component for this specific application?”2
| Category | Second Edition name | GAMP 4 name | Everyday examples | Typical likelihood of failure |
|---|---|---|---|---|
| 1 | Infrastructure software, tools and IT services | Operating systems | Operating systems, most open-source libraries and tools,3 cloud platforms and managed databases,4 infrastructure as code5 | Low inherent GxP risk3 |
| 2 | None since 2008 | Firmware | None | None |
| 3 | Standard system components | Standard software packages | Off-the-shelf software used as supplied;6 FDA’s case of a spreadsheet’s basic input functions used only to record readings, which FDA gives without a category7 | Low6 |
| 4 | Configured components | Configurable software packages | Configurable workflows that need no programming;8 configuration of large applications such as ERP6 | Medium6 |
| 5 | Custom applications and components | Custom (bespoke) software | RPA scripts,9 bespoke equipment interfaces10 | High6 |
ISPE’s 2008 summary of GAMP 5 says “Category 2 no longer exists”: firmware stopped being a category of its own in the first edition, not the second.12 PIC/S notes that firmware is “usually qualified for the intended use (including version, release or related criteria) as part of performance qualification / process validation”, so a balance’s firmware is qualified with the balance.11
The likelihoods are “guidelines only”: “Complex configuration could increase the probability, and low-complex custom software could be medium.”6 And likelihood is half the picture: ISPE’s method asks first about “the severity of the impact on patient safety, product quality, and data integrity”.2
2Which category is a LIMS, eQMS or MES?
None of them has one. Systems “are generally made up of a combination of components from different categories”,13 and ISPE says categorization at a whole-system level “adds little value and should be avoided”, except to scale supplier assessment or as an early, informal view based on the most significant component.2 On that view, a LIMS, eQMS or MES whose core product you configure is Category 4. For validation, categorize the parts.
| System | Category 1 | Category 4 | Category 5 |
|---|---|---|---|
| LIMS | Cloud platform, managed database | Sample workflows, specification limits, audit trail settings | Calculation scripts; bespoke instrument interfaces |
| eQMS | Cloud platform under the SaaS application | Deviation, CAPA, change control and document workflows, forms and roles | Bespoke integrations, such as to ERP or LIMS |
| MES | Cloud platform or servers, database | Each master production record configured in the MES | Bespoke equipment interfaces; custom calculation code |
| RPA | Platform and bots | None | Each automation script |
Category 3 parts are functions used exactly as delivered, such as a LIMS’s standard reports. For an MES, FDA says qualifying the platform “does not demonstrate that a given MPCR generated by the MES contains the correct calculations”,14 and ISPE describes batch instructions on an MES as having their own controlled life cycles and validation.9 So each master record is validated for its intended use when it is built or changed, not once with the platform. Equipment connections repeat the work: ISPE says “many interfaces currently fall into Category 5 (bespoke) or at least Category 4 (configurable)”, and connecting a piece of equipment for the first time typically creates a new interface to validate.10
For an eQMS bought as a service, ISPE treats the platform-
3How to decide a component’s category.
- Is it infrastructure, a tool or an IT service the application relies on, rather than it doing the GxP work? Category 1, like operating systems, cloud platforms and infrastructure as code.3,
4, 5 - Is it used as supplied, with only installation and environment settings? Category 3. In FDA’s spreadsheet case, from its device software guidance, the manufacturer may need no assurance beyond the developer’s and initial installation and configuration; custom formulas in the same spreadsheet used directly in production may need more.7
- Did you set it up by choosing among options the supplier built, without writing code? Configured workflows, forms, roles and limits are Category 4.8 Record the choices in a controlled configuration specification.16
- Did anyone write code for this use? Scripts and bespoke interfaces are Category 5, each with its own controlled life cycle.9,
10 - Then adjust for complexity, novelty and supplier.
| Situation | Likelihood of defects | Possible action |
|---|---|---|
| Complex configuration | Higher than typical | More verification, such as a formal configuration review |
| Less competent supplier | Higher than typical | More supplier surveillance, particularly during verification |
| Newly released | Might be higher than typical | More verification; more hypercare early in operation |
| Copy of proven config | Lower than typical | Test only each instance’s parameters |
4The systems people argue about.
The same arguments come up at site after site. Where ISPE, a regulator or FDA’s device guidance has addressed the case, the last column cites it; where none has, the reading is ours, from the questions above.
| System | The argument | What settles it |
|---|---|---|
| PLC on a packaged skid | The vendor ships hundreds, so 3; somebody wrote it, so 5 | Whether yours is an identical copy: draft Annex 11 calls a product off the shelf when it is provided to the general public, available in “multiple and identical copies” and implemented “without or with some customization”.16 We read logic changed for your skid as code written for this use, so 5, and set points entered without changing the logic as parameters |
| Chromatography data system | One number for the whole | Three parts: the package as supplied, 3; your methods and report templates, 4; any calculation you typed or scripted, 5 |
| Temperature monitoring | It only records, and alerts | FDA’s device guidance puts collecting data for review, and alerts on exceptions in data, outside high process risk, and maintaining a temperature essential to safety inside it.7 If nothing but the alarm saves the product at night, we treat the alarm as high risk |
| Environmental monitoring trend | A report, so low | FDA’s device guidance counts automated trending of data the manufacturer identifies as essential to safety and quality as high process risk;7 decide whether anyone acts on the trend without checking the points |
| Spreadsheet with formulas or a macro | It is only a spreadsheet | EU GMP questions and answers: formulas “should be verified for correctness”, templates checked for accuracy and kept under version control, and validation under Annex 11 is required at least where there is custom code such as a macro17 |
| Dashboard over validated data | It changes nothing | The query is yours. If a release or batch decision reads it, test the query against the source; if it only opens a meeting, try it once |
| Electronic signature on a form | Configured, so 4 | In FDA’s device examples it is not high process risk and is tested by scenario; Part 11 still applies to the signatures7 |
| Training record system | It touches no product | The same examples: not high process risk, tested unscripted, including attempts to break the record such as deleting the audit trail7 |
| Cloud storage for records | Infrastructure, so nothing to validate | FDA’s device guidance treats storage that holds quality records as used directly, with assurance aimed at record integrity and Part 11;7 Annex 11 asks for infrastructure to be qualified18 |
| Python script on open-source libraries | All of it 5 | ISPE puts most open-source software in Category 1; the script you wrote is 5, and you record the library versions it runs on3 |
| Low-code app | No code, so 4 | Look at what was made. Choosing fields and a route is 4; a formula or branch that exists for this one use is code in all but name, so we treat it as 5 |
5Template: component categorization record.
| Field | What to record | Basis |
|---|---|---|
| System | Name and inventory entry, with its GMP functionality | Annex 11, 4.318 |
| Component | Each platform, product, configuration set, script and interface | Section 12.22 |
| Supplier, version | Supplier, product, version and hosting model | Annex 11, 3.2 and 4.518 |
| Category | 1, 3, 4 or 5, and the question that decided it | Appendix M42 |
| Configuration | Configuration specification reference, for Category 4 parts | Draft Annex 11, 6.616 |
| GxP impact | What a failure would do to patients, product and data | Annex 11, 118 |
| Adjustments | Complexity, novelty, supplier record, proven copy | ISPE, Table 12 |
| Assurance | Supplier evidence, verification and tests planned, and their depth | Annex 11, 1 and 4.718 |
6Example: a configured LIMS, component by component.
This example is invented: Tarnwick Biologics, its QC laboratory and its LIMS are illustrative.
| Component | Category | Why | GxP impact | Assurance planned |
|---|---|---|---|---|
| Cloud platform, database | 1 | Platform as a service4 | Indirect; holds every record | Supplier assessment; good IT practice; updates screened18, |
| Standard reports | 3 | Used as delivered6 | Medium; reviewers read results | Supplier evidence against the URS; output checked against source records18 |
| Audit trail settings | 4 | Events and fields chosen at set-up | High; data integrity | Configuration specification; each GMP change shown captured with its reason16, |
| Sample workflows | 4 | Login, testing, review and approval configured8 | High; release path | Each workflow verified for its intended use14 |
| Specification limits | 4, complex | Limits and rounding set OOS flags2 | High; release decisions | Formal configuration review; tests at limits and of error handling18 |
| Potency script | 5 | 20 lines written for this laboratory | High; feeds release results | Code review; independent recalculation across the range, at boundaries and for rounding14, |
| CDS interface | 5 | Bespoke results transfer10 | High; moves raw results | Tests of mappings, rejected transfers and reconciliation18 |
| Second site copy | 4, proven | Identical copy of a tested configuration2 | As the original | Only that site’s parameters verified2 |
The potency script is short, and ISPE says “if the code comprises only 20 lines, then the probability is likely to be less”.6 That lowers likelihood, not severity: the script calculates a release result, and FDA expects validation to show that a workflow’s “intended steps, requirements, and calculations” are accurate.14
7Typical starting activities by category.
Section 12.2 of the guide warns: “Categorization is not intended to provide a checklist approach to validation.”2 With that caution, GAMP 4’s summary, as PIC/S reproduces it for inspectors, is a starting point to scale by risk.
| Category | GAMP 4 starting point |
|---|---|
| 1 | Record the version, including service pack; the application’s functional testing challenges it indirectly |
| 2, firmware | Record the version, and configuration if configurable; calibrate; verify against user requirements; manage custom firmware as Category 5 |
| 3 | Record the version and environment configuration; verify against user requirements; consider a supplier audit for critical, complex applications |
| 4 | Record the version and configuration; verify against user requirements; normally audit the supplier for critical, complex applications; manage custom programming as Category 5 |
| 5 | Audit the supplier and validate the complete system |
That table scales by category alone. The rules scale by more: 21 CFR 211.68(b) bases the degree and frequency of input and output checks on “the complexity and reliability of the computer or related system”, and Annex 11 bases the extent of validation on a risk assessment that takes in patient safety, data integrity and product quality.19,
| Created by | Nobody relies on it | A person checks it first | It decides or controls alone |
|---|---|---|---|
| Installed and used as supplied | Supplier evidence, installation check | Supplier evidence, plus a short check of your use | Scripted test of your use, with limits and errors |
| Configured | Try it once and keep the note | Unscripted tests of each configured rule | Configuration review, then scripted tests at and around each limit |
| Written for you | Code under version control, tried once | Code review and a test set with known answers | Code review, boundary and wrong-input tests, recalculation by another route, repeated on every change |
8What inspectors cite.
PIC/S tells inspectors what to look for: “Inspectors will be interested in the company’s approach to identifying GxP risks and the criteria for assessing the fitness for purpose of the system application.”11 Neither letter below mentions a category.
Your GC laboratory instrument was not adequately qualified because you failed to validate the control software or enable audit trails, and the GC data file creation and modification dates were not accurate.
Laboratorios Jaloma S.A. de C.V., FDA warning letter 320-26-78, 22 May 2026, under 21 CFR 211.68(b).20 The lesson: instrument software is validated with the instrument, and audit trail settings are configuration you switch on and verify.
FDA’s April 2026 letter to Ava Inc. asks for an assessment of each laboratory computer system that begins with “A list of all hardware (both standalone and networked) and software used by your laboratory”, then covers each system’s “qualification/
9What the regulations say, and where CSA fits.
Neither the 2011 Annex 11 nor its 2025 draft uses GAMP’s categories, though the 2011 text asks for a formal process for “bespoke or customised computerised systems” (4.6). Annex 11 says “The application should be validated; IT infrastructure should be qualified.”18 The draft asks validation to “address both standard and configured system functionality, as well as any functionality realised through customisation”, close to Categories 3 to 5, and keeps the user “fully responsible” when relying on a vendor’s qualification.16 FDA asks for validation “commensurate with the risk posed by the automated system”;14 risk-based validation covers that assessment.
FDA’s Computer Software Assurance guidance, final on 3 February 2026, does not use the categories either. It sorts each feature by whether its failure “may result in a quality problem that foreseeably compromises safety”, and names GAMP 5 only among resources. For high process risk it suggests scripted testing or a mix of scripted and unscripted; for the rest, unscripted methods such as scenario testing, error guessing and exploratory testing; and it says neither choice is exclusive. Its scope is software used in medical device production or the quality management system: it was prepared by FDA’s device and biologics centers in consultation with the drug center, and it supersedes the September 2025 version and section 6 of the General Principles of Software Validation.7 For a drug site it is reasoning to borrow, not guidance written for drug CGMP; CSV and CSA compares the two approaches.
The EU draft pulls the other way. CSA accepts exploratory testing recorded with its objectives, issues found and conclusion. The draft Annex 11 says test cases not traceable to requirements or specifications “do not meet the requirements to qualification and validation”, and wants evidence as executed test scripts described in enough detail to repeat.7,
10How it runs in Seal.
Seal’s validation and AI assurance guide assesses assurance at three boundaries: the managed platform, your configured process, and custom logic and connected systems. It says software categorization follows the actual components and their use, so a configurable platform does not give every script, integration or deployment the same GAMP category, and the scope and assurance rationale are agreed in your validation plan.
The computer system assurance blueprint sets the depth of testing from intended use and function risk, and releases against a fixed configuration baseline. In the LIMS blueprint, the user requirements, functional and design specifications, configuration specification, verification results and approval are kept together in Seal and updated with the configuration they describe.
To classify one component at a time, the free GAMP 5 category and CSA classifier returns its category, CSA assurance level and deliverables, and writes a Word scope memo.
AQuestions and answers
What happened to GAMP Category 2?
Category 2 was firmware in GAMP 4. It went in 2008, when the first edition of GAMP 5 refined the categories, and the Second Edition kept the numbers 1, 3, 4 and 5. Under GAMP 4, configurable firmware was recorded with its version and configuration, and custom firmware was managed as Category 5.
What is the difference between GAMP Category 4 and Category 5?
Category 4 parts are set up by choosing among options the supplier built, without writing code. Category 5 parts are code written for your use, such as scripts and bespoke interfaces. One product often holds both: a configured LIMS with a custom calculation script has Category 4 and Category 5 parts, and each is tested according to its own risk.
Does the software category decide how much testing is needed?
Not by itself. The Second Edition calls the category one factor in a risk-based approach and scales life cycle activities by the GxP impact, complexity and novelty of the system. A complex configured component may need more testing than a short piece of custom code, and a short script that calculates a release result still needs thorough testing.
What GAMP category is a spreadsheet?
It depends on what the spreadsheet does. GAMP covers end-user applications, including spreadsheets, in Appendix S3. FDA’s device software assurance guidance treats basic data entry in an off-the-shelf spreadsheet as low risk, but says custom formulas used directly in production or the quality system may need further validation by the manufacturer.
Should we accept a supplier’s stated GAMP category?
As a starting point. ISPE notes that a whole-system category is often useful to suppliers positioning their products as standard or configurable, and that it helps scope supplier assessment. Your own categorization follows the components you use, configure and extend, so one product can hold Category 3, 4 and 5 parts at your site.
Does FDA’s CSA guidance replace the GAMP 5 categories?
No. They answer different questions. The category describes what was done to create a part, and so how likely a defect is. CSA asks what a failure would do, and it is FDA guidance for medical device production and quality system software, which names GAMP 5 only as a resource.
References21 sources
References
- 1ISPE GAMP 5 Guide, Second Edition, table of contents, ISPE, 2022. https:/
/ ispe. org/ sites/ default/ files/ publications/ guidance- documents/ 2022- TOC/ ISPE- GAMP5- Ed2_ TOC. pdf (read 25 November 2026) - 2When Is a Category Not a Category?, Pharmaceutical Engineering, ISPE, January/February 2026, including Table 1. https:/
/ ispe. org/ pharmaceutical- engineering/ january- february- 2026/ when- category- not- category (read 25 November 2026) - 3GAMP Considerations When Relying on Open-Source Software, Pharmaceutical Engineering, ISPE, March/April 2022. https:/
/ ispe. org/ pharmaceutical- engineering/ march- april- 2022/ gamp- considerations- when- relying- open- source- software (read 25 November 2026) - 4Continuous Operational Control of PaaS in GxP Environments, Pharmaceutical Engineering, ISPE, July/August 2026. https:/
/ ispe. org/ index. php/ pharmaceutical- engineering/ july- august- 2026/ continuous- operational- control- paas- gxp- environments (read 25 November 2026) - 5The Use of Infrastructure as Code in Regulated Companies, Pharmaceutical Engineering, ISPE, January/February 2024. https:/
/ ispe. org/ pharmaceutical- engineering/ january- february- 2024/ use- infrastructure- code- regulated- companies (read 25 November 2026) - 6Removing the Frustration from Functional Risk Management, Pharmaceutical Engineering, ISPE, January/February 2025. https:/
/ ispe. org/ pharmaceutical- engineering/ january- february- 2025/ removing- frustration- functional- risk- management (read 25 November 2026) - 7Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026, sections I, III and V and Appendix A. https:/
/ www. fda. gov/ media/ 188844/ download (read 25 November 2026) - 8The Application of GAMP 5 to the Implementation and Operation of a GxP Compliant Clinical System, white paper, ISPE, 1 September 2013. https:/
/ ispe. org/ pharmaceutical- engineering/ white- papers/ application- gampr- 5- implementation- and- operation- gxp- compliant- clinical (read 25 November 2026) - 9A GAMP Approach to Robotic Process Automation, Pharmaceutical Engineering, ISPE, May/June 2020. https:/
/ ispe. org/ pharmaceutical- engineering/ gamp- approach- robotic- process- automation (read 25 November 2026) - 10Pharma 4.0: Plug & Produce Architectural Principles, white paper, ISPE, 5 December 2024. https:/
/ ispe. org/ pharmaceutical- engineering/ white- papers/ pharma- 40- plug- produce- architectural- principles (read 25 November 2026) - 11PI 011-3, Good Practices for Computerised Systems in Regulated “GXP” Environments, PIC/S, 25 September 2007, sections 6.3, 15.1 and 15.2. https:/
/ picscheme. org/ docview/ 3444 (read 25 November 2026) - 12GAMP 4 to GAMP 5 Summary, ISPE, 2008, published through Accuris (formerly Techstreet), section 5. https:/
/ images. techstreet. com/ direct/ tocs/ ISPE/ ISPE_ GAMP_ 4- 5_ sum. pdf (read 25 November 2026) - 13What You Need to Know About GAMP 5 Guide, 2nd Edition, Pharmaceutical Engineering, ISPE, January/February 2023. https:/
/ ispe. org/ pharmaceutical- engineering/ january- february- 2023/ what- you- need- know- about- gampr- 5- guide- 2nd- edition (read 25 November 2026) - 14Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, question 3. https:/
/ www. fda. gov/ media/ 119267/ download (read 25 November 2026) - 15‘GXP’ Data Integrity Guidance and Definitions, Revision 1, MHRA, March 2018, section 6.19. https:/
/ assets. publishing. service. gov. uk/ media/ 5aa2b9ede5274a3e391e37f3/ MHRA_ GxP_ data_ integrity_ guide_ March_ edited_ Final. pdf (read 25 November 2026) - 16Annex 11: Computerised Systems, draft for consultation, European Commission and PIC/S, July 2025, clauses 2.3, 6.6, 7.1, 9.1, 9.4, 9.5 and 9.7 and glossary. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 25 November 2026) - 17Guidance on good manufacturing practice and good distribution practice: questions and answers, EU GMP guide annexes, Annex 11, questions 1 to 3, European Medicines Agency. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers (read 25 November 2026) - 18EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, European Commission, in operation from 30 June 2011, principle and sections 1, 3, 4.3 to 4.7, 5 and 9. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 25 November 2026) - 1921 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- D/ section- 211. 68 (read 25 November 2026) - 20Warning letter 320-26-78 to Laboratorios Jaloma S.A. de C.V., MARCS-CMS 725939, FDA, 22 May 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ laboratorios- jaloma- sa- de- cv- 725939- 05222026 (read 25 November 2026) - 21Warning letter 320-26-64 to Ava Inc., MARCS-CMS 721180, FDA, 14 April 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ ava- inc- 721180- 04142026 (read 25 November 2026)