GAMP 5 Second Edition groups software components into four categories: 1, infrastructure software, tools and IT services; 3, standard system components; 4, configured components; and 5, custom applications and components. Category 2, firmware, was dropped in 2008. A LIMS, eQMS or MES has no single category: its hosting is usually Category 1, its configured workflows and records Category 4, and its scripts and bespoke interfaces Category 5. For supplier assessment alone, a configured product counts as Category 4.Checked against its sources on 25 November 2026. Latest change: The table of systems people argue about no longer gives draft Annex 11’s off-the-shelf test as being available in identical copies alone: the draft also asks that the product be provided to the general public, and allows it to be implemented with some customization. 1 more change. How these answers are made

Illustration of a seal resting on four bound volumes, Requirements, Configuration, Verification and Change control, with a red ribbon running through them all.

1The categories at a glance.

The categories sit in Appendix M4 of GAMP 5 Second Edition, “Categories of Software and Hardware”.1 They group components by one question: “What complexity of activity has to be done to create the component for this specific application?”2

Table 1. Names from ISPE’s 2026 article, which lists them without numbers. The numbers are GAMP 4’s, as PIC/S reproduces them, and ISPE’s later articles keep them.2,11,10
CategorySecond Edition nameGAMP 4 nameEveryday examplesTypical likelihood of failure
1Infrastructure software, tools and IT servicesOperating systemsOperating systems, most open-source libraries and tools,3 cloud platforms and managed databases,4 infrastructure as code5Low inherent GxP risk3
2None since 2008FirmwareNoneNone
3Standard system componentsStandard software packagesOff-the-shelf software used as supplied;6 FDA’s case of a spreadsheet’s basic input functions used only to record readings, which FDA gives without a category7Low6
4Configured componentsConfigurable software packagesConfigurable workflows that need no programming;8 configuration of large applications such as ERP6Medium6
5Custom applications and componentsCustom (bespoke) softwareRPA scripts,9 bespoke equipment interfaces10High6

ISPE’s 2008 summary of GAMP 5 says “Category 2 no longer exists”: firmware stopped being a category of its own in the first edition, not the second.12 PIC/S notes that firmware is “usually qualified for the intended use (including version, release or related criteria) as part of performance qualification / process validation”, so a balance’s firmware is qualified with the balance.11

The likelihoods are “guidelines only”: “Complex configuration could increase the probability, and low-complex custom software could be medium.”6 And likelihood is half the picture: ISPE’s method asks first about “the severity of the impact on patient safety, product quality, and data integrity”.2

2Which category is a LIMS, eQMS or MES?

None of them has one. Systems “are generally made up of a combination of components from different categories”,13 and ISPE says categorization at a whole-system level “adds little value and should be avoided”, except to scale supplier assessment or as an early, informal view based on the most significant component.2 On that view, a LIMS, eQMS or MES whose core product you configure is Category 4. For validation, categorize the parts.

Table 2. Parts placed by the questions in the next section. The RPA row is ISPE’s own.4,8,10,9
SystemCategory 1Category 4Category 5
LIMSCloud platform, managed databaseSample workflows, specification limits, audit trail settingsCalculation scripts; bespoke instrument interfaces
eQMSCloud platform under the SaaS applicationDeviation, CAPA, change control and document workflows, forms and rolesBespoke integrations, such as to ERP or LIMS
MESCloud platform or servers, databaseEach master production record configured in the MESBespoke equipment interfaces; custom calculation code
RPAPlatform and botsNoneEach automation script

Category 3 parts are functions used exactly as delivered, such as a LIMS’s standard reports. For an MES, FDA says qualifying the platform “does not demonstrate that a given MPCR generated by the MES contains the correct calculations”,14 and ISPE describes batch instructions on an MES as having their own controlled life cycles and validation.9 So each master record is validated for its intended use when it is built or changed, not once with the platform. Equipment connections repeat the work: ISPE says “many interfaces currently fall into Category 5 (bespoke) or at least Category 4 (configurable)”, and connecting a piece of equipment for the first time typically creates a new interface to validate.10

For an eQMS bought as a service, ISPE treats the platform-as-a-service components beneath it as Category 1, controlled by good IT practice rather than IQ, OQ and PQ protocols.4 The configured workflows remain yours to validate: MHRA rejects “vendor-supplied validation data in isolation of system configuration and users intended use”.15 Validating SaaS covers supplier assessment.

3How to decide a component’s category.

  1. Is it infrastructure, a tool or an IT service the application relies on, rather than it doing the GxP work? Category 1, like operating systems, cloud platforms and infrastructure as code.3,4,5
  2. Is it used as supplied, with only installation and environment settings? Category 3. In FDA’s spreadsheet case, from its device software guidance, the manufacturer may need no assurance beyond the developer’s and initial installation and configuration; custom formulas in the same spreadsheet used directly in production may need more.7
  3. Did you set it up by choosing among options the supplier built, without writing code? Configured workflows, forms, roles and limits are Category 4.8 Record the choices in a controlled configuration specification.16
  4. Did anyone write code for this use? Scripts and bespoke interfaces are Category 5, each with its own controlled life cycle.9,10
  5. Then adjust for complexity, novelty and supplier.
Table 3. ISPE’s examples of critical thinking about categories, from its 2026 article.2
SituationLikelihood of defectsPossible action
Complex configurationHigher than typicalMore verification, such as a formal configuration review
Less competent supplierHigher than typicalMore supplier surveillance, particularly during verification
Newly releasedMight be higher than typicalMore verification; more hypercare early in operation
Copy of proven configLower than typicalTest only each instance’s parameters

4The systems people argue about.

The same arguments come up at site after site. Where ISPE, a regulator or FDA’s device guidance has addressed the case, the last column cites it; where none has, the reading is ours, from the questions above.

Table 4. Our readings, citing a source where one has addressed the case.
SystemThe argumentWhat settles it
PLC on a packaged skidThe vendor ships hundreds, so 3; somebody wrote it, so 5Whether yours is an identical copy: draft Annex 11 calls a product off the shelf when it is provided to the general public, available in “multiple and identical copies” and implemented “without or with some customization”.16 We read logic changed for your skid as code written for this use, so 5, and set points entered without changing the logic as parameters
Chromatography data systemOne number for the wholeThree parts: the package as supplied, 3; your methods and report templates, 4; any calculation you typed or scripted, 5
Temperature monitoringIt only records, and alertsFDA’s device guidance puts collecting data for review, and alerts on exceptions in data, outside high process risk, and maintaining a temperature essential to safety inside it.7 If nothing but the alarm saves the product at night, we treat the alarm as high risk
Environmental monitoring trendA report, so lowFDA’s device guidance counts automated trending of data the manufacturer identifies as essential to safety and quality as high process risk;7 decide whether anyone acts on the trend without checking the points
Spreadsheet with formulas or a macroIt is only a spreadsheetEU GMP questions and answers: formulas “should be verified for correctness”, templates checked for accuracy and kept under version control, and validation under Annex 11 is required at least where there is custom code such as a macro17
Dashboard over validated dataIt changes nothingThe query is yours. If a release or batch decision reads it, test the query against the source; if it only opens a meeting, try it once
Electronic signature on a formConfigured, so 4In FDA’s device examples it is not high process risk and is tested by scenario; Part 11 still applies to the signatures7
Training record systemIt touches no productThe same examples: not high process risk, tested unscripted, including attempts to break the record such as deleting the audit trail7
Cloud storage for recordsInfrastructure, so nothing to validateFDA’s device guidance treats storage that holds quality records as used directly, with assurance aimed at record integrity and Part 11;7 Annex 11 asks for infrastructure to be qualified18
Python script on open-source librariesAll of it 5ISPE puts most open-source software in Category 1; the script you wrote is 5, and you record the library versions it runs on3
Low-code appNo code, so 4Look at what was made. Choosing fields and a route is 4; a formula or branch that exists for this one use is code in all but name, so we treat it as 5

5Template: component categorization record.

Table 5. One row per component, kept with the validation plan.
FieldWhat to recordBasis
SystemName and inventory entry, with its GMP functionalityAnnex 11, 4.318
ComponentEach platform, product, configuration set, script and interfaceSection 12.22
Supplier, versionSupplier, product, version and hosting modelAnnex 11, 3.2 and 4.518
Category1, 3, 4 or 5, and the question that decided itAppendix M42
ConfigurationConfiguration specification reference, for Category 4 partsDraft Annex 11, 6.616
GxP impactWhat a failure would do to patients, product and dataAnnex 11, 118
AdjustmentsComplexity, novelty, supplier record, proven copyISPE, Table 12
AssuranceSupplier evidence, verification and tests planned, and their depthAnnex 11, 1 and 4.718

6Example: a configured LIMS, component by component.

This example is invented: Tarnwick Biologics, its QC laboratory and its LIMS are illustrative.

Table 6. Invented example.
ComponentCategoryWhyGxP impactAssurance planned
Cloud platform, database1Platform as a service4Indirect; holds every recordSupplier assessment; good IT practice; updates screened18,4
Standard reports3Used as delivered6Medium; reviewers read resultsSupplier evidence against the URS; output checked against source records18
Audit trail settings4Events and fields chosen at set-upHigh; data integrityConfiguration specification; each GMP change shown captured with its reason16,18
Sample workflows4Login, testing, review and approval configured8High; release pathEach workflow verified for its intended use14
Specification limits4, complexLimits and rounding set OOS flags2High; release decisionsFormal configuration review; tests at limits and of error handling18
Potency script520 lines written for this laboratoryHigh; feeds release resultsCode review; independent recalculation across the range, at boundaries and for rounding14,18
CDS interface5Bespoke results transfer10High; moves raw resultsTests of mappings, rejected transfers and reconciliation18
Second site copy4, provenIdentical copy of a tested configuration2As the originalOnly that site’s parameters verified2

The potency script is short, and ISPE says “if the code comprises only 20 lines, then the probability is likely to be less”.6 That lowers likelihood, not severity: the script calculates a release result, and FDA expects validation to show that a workflow’s “intended steps, requirements, and calculations” are accurate.14

7Typical starting activities by category.

Section 12.2 of the guide warns: “Categorization is not intended to provide a checklist approach to validation.”2 With that caution, GAMP 4’s summary, as PIC/S reproduces it for inspectors, is a starting point to scale by risk.

Table 7. PI 011-⁠3, section 15.1, reproducing GAMP 4 Appendix M4.11
CategoryGAMP 4 starting point
1Record the version, including service pack; the application’s functional testing challenges it indirectly
2, firmwareRecord the version, and configuration if configurable; calibrate; verify against user requirements; manage custom firmware as Category 5
3Record the version and environment configuration; verify against user requirements; consider a supplier audit for critical, complex applications
4Record the version and configuration; verify against user requirements; normally audit the supplier for critical, complex applications; manage custom programming as Category 5
5Audit the supplier and validate the complete system

That table scales by category alone. The rules scale by more: 21 CFR 211.68(b) bases the degree and frequency of input and output checks on “the complexity and reliability of the computer or related system”, and Annex 11 bases the extent of validation on a risk assessment that takes in patient safety, data integrity and product quality.19,18 Crossing the category with what relies on the part gives a working plan; read along a row for the same category at different risk.

Table 8. A working plan for effort, ours and not GAMP’s.
Created byNobody relies on itA person checks it firstIt decides or controls alone
Installed and used as suppliedSupplier evidence, installation checkSupplier evidence, plus a short check of your useScripted test of your use, with limits and errors
ConfiguredTry it once and keep the noteUnscripted tests of each configured ruleConfiguration review, then scripted tests at and around each limit
Written for youCode under version control, tried onceCode review and a test set with known answersCode review, boundary and wrong-input tests, recalculation by another route, repeated on every change

8What inspectors cite.

PIC/S tells inspectors what to look for: “Inspectors will be interested in the company’s approach to identifying GxP risks and the criteria for assessing the fitness for purpose of the system application.”11 Neither letter below mentions a category.

Your GC laboratory instrument was not adequately qualified because you failed to validate the control software or enable audit trails, and the GC data file creation and modification dates were not accurate.

Laboratorios Jaloma S.A. de C.V., FDA warning letter 320-⁠26-⁠78, 22 May 2026, under 21 CFR 211.68(b).20 The lesson: instrument software is validated with the instrument, and audit trail settings are configuration you switch on and verify.

FDA’s April 2026 letter to Ava Inc. asks for an assessment of each laboratory computer system that begins with “A list of all hardware (both standalone and networked) and software used by your laboratory”, then covers each system’s “qualification/validation status” and the “suitability of current hardware/software for its intended use(s)”.21 The lesson: the inventory comes first, as Annex 11 4.3 also asks.18

9What the regulations say, and where CSA fits.

Neither the 2011 Annex 11 nor its 2025 draft uses GAMP’s categories, though the 2011 text asks for a formal process for “bespoke or customised computerised systems” (4.6). Annex 11 says “The application should be validated; IT infrastructure should be qualified.”18 The draft asks validation to “address both standard and configured system functionality, as well as any functionality realised through customisation”, close to Categories 3 to 5, and keeps the user “fully responsible” when relying on a vendor’s qualification.16 FDA asks for validation “commensurate with the risk posed by the automated system”;14 risk-based validation covers that assessment.

FDA’s Computer Software Assurance guidance, final on 3 February 2026, does not use the categories either. It sorts each feature by whether its failure “may result in a quality problem that foreseeably compromises safety”, and names GAMP 5 only among resources. For high process risk it suggests scripted testing or a mix of scripted and unscripted; for the rest, unscripted methods such as scenario testing, error guessing and exploratory testing; and it says neither choice is exclusive. Its scope is software used in medical device production or the quality management system: it was prepared by FDA’s device and biologics centers in consultation with the drug center, and it supersedes the September 2025 version and section 6 of the General Principles of Software Validation.7 For a drug site it is reasoning to borrow, not guidance written for drug CGMP; CSV and CSA compares the two approaches.

The EU draft pulls the other way. CSA accepts exploratory testing recorded with its objectives, issues found and conclusion. The draft Annex 11 says test cases not traceable to requirements or specifications “do not meet the requirements to qualification and validation”, and wants evidence as executed test scripts described in enough detail to repeat.7,16 It does accept alternative practices “proven and documented to provide the same or higher level of control”.16 A site serving both markets that tests by exploration has that case to make: each session written against a numbered requirement, recording what was tried, with what data and what happened, so that someone else could repeat it.

10How it runs in Seal.

Seal’s validation and AI assurance guide assesses assurance at three boundaries: the managed platform, your configured process, and custom logic and connected systems. It says software categorization follows the actual components and their use, so a configurable platform does not give every script, integration or deployment the same GAMP category, and the scope and assurance rationale are agreed in your validation plan.

The computer system assurance blueprint sets the depth of testing from intended use and function risk, and releases against a fixed configuration baseline. In the LIMS blueprint, the user requirements, functional and design specifications, configuration specification, verification results and approval are kept together in Seal and updated with the configuration they describe.

To classify one component at a time, the free GAMP 5 category and CSA classifier returns its category, CSA assurance level and deliverables, and writes a Word scope memo.

AQuestions and answers

What happened to GAMP Category 2?

Category 2 was firmware in GAMP 4. It went in 2008, when the first edition of GAMP 5 refined the categories, and the Second Edition kept the numbers 1, 3, 4 and 5. Under GAMP 4, configurable firmware was recorded with its version and configuration, and custom firmware was managed as Category 5.

What is the difference between GAMP Category 4 and Category 5?

Category 4 parts are set up by choosing among options the supplier built, without writing code. Category 5 parts are code written for your use, such as scripts and bespoke interfaces. One product often holds both: a configured LIMS with a custom calculation script has Category 4 and Category 5 parts, and each is tested according to its own risk.

Does the software category decide how much testing is needed?

Not by itself. The Second Edition calls the category one factor in a risk-based approach and scales life cycle activities by the GxP impact, complexity and novelty of the system. A complex configured component may need more testing than a short piece of custom code, and a short script that calculates a release result still needs thorough testing.

What GAMP category is a spreadsheet?

It depends on what the spreadsheet does. GAMP covers end-user applications, including spreadsheets, in Appendix S3. FDA’s device software assurance guidance treats basic data entry in an off-the-shelf spreadsheet as low risk, but says custom formulas used directly in production or the quality system may need further validation by the manufacturer.

Should we accept a supplier’s stated GAMP category?

As a starting point. ISPE notes that a whole-system category is often useful to suppliers positioning their products as standard or configurable, and that it helps scope supplier assessment. Your own categorization follows the components you use, configure and extend, so one product can hold Category 3, 4 and 5 parts at your site.

Does FDA’s CSA guidance replace the GAMP 5 categories?

No. They answer different questions. The category describes what was done to create a part, and so how likely a defect is. CSA asks what a failure would do, and it is FDA guidance for medical device production and quality system software, which names GAMP 5 only as a resource.

References21 sources

References

  1. 1ISPE GAMP 5 Guide, Second Edition, table of contents, ISPE, 2022. https://ispe.org/sites/default/files/publications/guidance-documents/2022-TOC/ISPE-GAMP5-Ed2_TOC.pdf (read 25 November 2026)
  2. 2When Is a Category Not a Category?, Pharmaceutical Engineering, ISPE, January/February 2026, including Table 1. https://ispe.org/pharmaceutical-engineering/january-february-2026/when-category-not-category (read 25 November 2026)
  3. 3GAMP Considerations When Relying on Open-⁠Source Software, Pharmaceutical Engineering, ISPE, March/April 2022. https://ispe.org/pharmaceutical-engineering/march-april-2022/gamp-considerations-when-relying-open-source-software (read 25 November 2026)
  4. 4Continuous Operational Control of PaaS in GxP Environments, Pharmaceutical Engineering, ISPE, July/August 2026. https://ispe.org/index.php/pharmaceutical-engineering/july-august-2026/continuous-operational-control-paas-gxp-environments (read 25 November 2026)
  5. 5The Use of Infrastructure as Code in Regulated Companies, Pharmaceutical Engineering, ISPE, January/February 2024. https://ispe.org/pharmaceutical-engineering/january-february-2024/use-infrastructure-code-regulated-companies (read 25 November 2026)
  6. 6Removing the Frustration from Functional Risk Management, Pharmaceutical Engineering, ISPE, January/February 2025. https://ispe.org/pharmaceutical-engineering/january-february-2025/removing-frustration-functional-risk-management (read 25 November 2026)
  7. 7Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026, sections I, III and V and Appendix A. https://www.fda.gov/media/188844/download (read 25 November 2026)
  8. 8The Application of GAMP 5 to the Implementation and Operation of a GxP Compliant Clinical System, white paper, ISPE, 1 September 2013. https://ispe.org/pharmaceutical-engineering/white-papers/application-gampr-5-implementation-and-operation-gxp-compliant-clinical (read 25 November 2026)
  9. 9A GAMP Approach to Robotic Process Automation, Pharmaceutical Engineering, ISPE, May/June 2020. https://ispe.org/pharmaceutical-engineering/gamp-approach-robotic-process-automation (read 25 November 2026)
  10. 10Pharma 4.0: Plug & Produce Architectural Principles, white paper, ISPE, 5 December 2024. https://ispe.org/pharmaceutical-engineering/white-papers/pharma-40-plug-produce-architectural-principles (read 25 November 2026)
  11. 11PI 011-⁠3, Good Practices for Computerised Systems in Regulated “GXP” Environments, PIC/S, 25 September 2007, sections 6.3, 15.1 and 15.2. https://picscheme.org/docview/3444 (read 25 November 2026)
  12. 12GAMP 4 to GAMP 5 Summary, ISPE, 2008, published through Accuris (formerly Techstreet), section 5. https://images.techstreet.com/direct/tocs/ISPE/ISPE_GAMP_4-5_sum.pdf (read 25 November 2026)
  13. 13What You Need to Know About GAMP 5 Guide, 2nd Edition, Pharmaceutical Engineering, ISPE, January/February 2023. https://ispe.org/pharmaceutical-engineering/january-february-2023/what-you-need-know-about-gampr-5-guide-2nd-edition (read 25 November 2026)
  14. 14Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, question 3. https://www.fda.gov/media/119267/download (read 25 November 2026)
  15. 15‘GXP’ Data Integrity Guidance and Definitions, Revision 1, MHRA, March 2018, section 6.19. https://assets.publishing.service.gov.uk/media/5aa2b9ede5274a3e391e37f3/MHRA_GxP_data_integrity_guide_March_edited_Final.pdf (read 25 November 2026)
  16. 16Annex 11: Computerised Systems, draft for consultation, European Commission and PIC/S, July 2025, clauses 2.3, 6.6, 7.1, 9.1, 9.4, 9.5 and 9.7 and glossary. https://health.ec.europa.eu/document/download/40231f18-e564-4043-94de-c031f813d38b_en?filename=mp_vol4_chap4_annex11_consultation_guideline_en.pdf (read 25 November 2026)
  17. 17Guidance on good manufacturing practice and good distribution practice: questions and answers, EU GMP guide annexes, Annex 11, questions 1 to 3, European Medicines Agency. https://www.ema.europa.eu/en/human-regulatory-overview/research-development/compliance-research-development/good-manufacturing-practice/guidance-good-manufacturing-practice-good-distribution-practice-questions-answers (read 25 November 2026)
  18. 18EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, European Commission, in operation from 30 June 2011, principle and sections 1, 3, 4.3 to 4.7, 5 and 9. https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf (read 25 November 2026)
  19. 1921 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-D/section-211.68 (read 25 November 2026)
  20. 20Warning letter 320-⁠26-⁠78 to Laboratorios Jaloma S.A. de C.V., MARCS-⁠CMS 725939, FDA, 22 May 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/laboratorios-jaloma-sa-de-cv-725939-05222026 (read 25 November 2026)
  21. 21Warning letter 320-⁠26-⁠64 to Ava Inc., MARCS-⁠CMS 721180, FDA, 14 April 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/ava-inc-721180-04142026 (read 25 November 2026)