1A traceability matrix template, column by column.
One row per requirement. Each column is there because a rule or an inspector expects what it holds.
| Column | What to enter | Why it is there |
|---|---|---|
| ID | The requirement’s unique number from the URS. Good practice, not a rule: never reuse one | Tests traceable to individual requirements, draft 9.51 |
| Requirement | One testable need, as worded in the approved URS | User requirements traceable through the life cycle, Annex 11 4.42 |
| Risk | High, medium or low, with the risk assessment reference | Validation extent rests on a documented risk assessment, Annex 11 section 1;2 draft 9.21 |
| Met by | The functional, design or configuration item, with its version | Draft 6.5 and 6.6;1 design qualification, WHO 7.23 |
| Verified by | Test case and step, or the inspection, analysis or supplier evidence used instead, with the reason. One test may serve several rows | “inspection, analysis or test”, PI 011-3 9.3;4 supplier documentation reviewed, draft 9.91 |
| Result | Pass or fail, the system version, who executed it and when | Executed test scripts as evidence, draft 9.4;1 who performed it and the date, FDA CSA5 |
| Deviation | Its number and disposition; the failed result stays in the row | Failures recorded as deviations, Annex 15 2.8;6 Annex 11 4.22 |
| Status | Verified, open, or withdrawn with an approved rationale | Results summarized against acceptance criteria, Annex 15 2.96 |
Read it in both directions. Forward, every requirement needs a verified result. Backward, every test needs a requirement: the 2025 draft revision of Annex 11 says test cases that trace to none “do not meet the requirements to qualification and validation”.1
2Example: a filled-in traceability matrix.
Example, invented: Velloran Biologics and Kestrane LIMS are not real. Velloran is validating Kestrane LIMS 7.2, a software-
| ID | Requirement | Risk | Met by | Verified by | Result |
|---|---|---|---|---|---|
| URS-012 | Only users with the QC Reviewer role can approve a result. The system refuses approval by the user who entered it. | High | Role set CFG-04 v3 | OQ-07, steps 1 to 9 | Pass on 7.2.0, 14 Sep 2026, AM |
| URS-018 | The LIMS calculates assay, as % of label claim, from peak areas received from the chromatography data system, as in method QCM-104. It reports one decimal place, rounding half up. | High | Calculation CFG-11 v2, then v3 | OQ-12 | Failed on v2: 99.46% reported as 99.4%, DEV-26-033. Pass on 7.2.0 with v3, 21 Sep 2026, AM |
| URS-021 | Every creation, change or deletion of a result records the user, date and time, old and new value, and reason. | High | Standard audit trail | OQ-15 | Pass on 7.2.0, 15 Sep 2026, RT |
| URS-030 | Results, metadata and audit trails can be restored from backup within 24 hours. | High | Supplier’s backup service | OQ-18, backup and restore in the validation tenant | Pass on 7.2.0, restored in 6 hours, 24 Sep 2026, RT |
| URS-044 | The supplier notifies each release at least 30 days before production, with release notes naming the functions changed. | Medium | Service agreement clause 8.2 | Inspection of the signed agreement, QA-REV-091 | Verified, 2 Sep 2026, LB |
| URS-052 | A dashboard shows each analyst’s count of samples awaiting review. | Low | Standard dashboard | Supplier’s release tests for 7.2, accepted in assessment SA-07 | Accepted, 5 Sep 2026, LB |
The summary counts every row. Of 64, 62 are in scope: 41 verified by Velloran’s own tests, 15 by assessed supplier evidence and 6 by inspection of documents. Two were withdrawn with an approved rationale and stay in the matrix, so the report reads 62 of 62 verified and 2 of 64 withdrawn, not a bare 100%. The backward check found OQ-21 and OQ-22, written for a stability module Velloran does not license, and they were dropped before execution.
URS-030 is OQ because it tests a function in the validation tenant; Annex 11 7.2 asks for restore to be checked during validation.2 URS-052 can rest on supplier evidence because the count decides nothing and creates no GMP record; reports and release are on the draft’s focus list, so certificate of analysis generation would be rated high and tested by Velloran.1
2.1The same matrix for equipment.
For equipment the rows run from the URS through design qualification, factory and site acceptance tests (FAT, SAT), IQ, OQ and PQ. Three rows for IS-03, an invented filling isolator at the same site:
| ID | Requirement | Risk | Met by | Verified by | Result |
|---|---|---|---|---|---|
| EQ-004 | Interior surfaces are smooth and crevice-free and withstand the site’s sporicidal agent. | High | Design specification DS-03, section 4 | FAT-03 inspection, repeated at IQ-03: shipping can scratch surfaces. Supplier’s compatibility data for the agent reviewed at FAT | Pass at FAT, 3 Jun 2026; pass at IQ, 24 Jun 2026, KD |
| EQ-012 | An alarm sounds when the pressure difference to the room stays below 30 Pa for over 10 seconds. Acknowledging it records user, time and reason in the audit trail. | High | Control configuration CS-03 v1 | OQ-03 test 6: 29 Pa for 11 seconds must alarm, for 9 must not; acknowledging must record user, time and reason | Pass, 2 Jul 2026, KD |
| EQ-015 | Only the engineer access level can change alarm limits. | High | Control configuration CS-03 v1 | FAT-03 test 9, not repeated: IQ-03 confirmed the software version unchanged | Pass at FAT, 4 Jun 2026; version matched at IQ, 24 Jun 2026, KD |
Annex 15 lets some tests done at FAT stand “without the need to repeat on site at IQ/OQ if it can be shown that the functionality is not affected by the transport and installation”, and PIC/S lets FAT and SAT reduce IQ and OQ scope “with appropriate justification”.6,
3Is a traceability matrix required?
Not by that name: even the EU draft gives the matrix only as an example. Annex 11, Annex 15 and 21 CFR Parts 11 and 211 never use the word matrix, and of these only Annex 11 speaks of traceability.2,
| Rule | Status | What it says |
|---|---|---|
| EU GMP Annex 11, 4.4 | In operation since 30 June 2011 | User requirements “should be traceable throughout the life-cycle”; no format set2 |
| Draft Annex 11, 6.5, 9.5 | Consultation closed 7 October 2025; not adopted on 26 November 2026 | Requirements to design and test cases, “established and maintained”; a matrix as the example1, |
| PIC/S PI 011-3, 23.10 | Inspector guidance, 2007 | Inspectors check PQ against the URS, OQ against the functional specification, IQ against the design4 |
| PIC/S PI 006-4, 5.3.3 | In force since 1 October 2026 | A matrix linking the risk assessment to a process validation protocol “is also helpful”7 |
| EMA clinical, A2.4 | GCP guideline, in effect since 2023 | Each user requirement traced to test cases or other activities, updated as requirements change12 |
| US drugs | Parts 11 and 211; FDA guidance, 2018 | Neither word; each CGMP workflow validated for its “intended steps, requirements, and calculations”8, |
| US devices | 820.10(c) since 2 February 2026; guidance of 2002 and 2026 | ISO 13485 clause 7.3 for class II, III and some class I devices; traceability analysis in the 2002 software guidance, traceable scripted tests in CSA14, |
Under FDA’s drug rules a matrix is the plainest way to show that each workflow’s requirements were tested. In the UK, regulation C17 of the Human Medicines Regulations 2012 keeps EU GMP guidelines as they stood at the end of 2020 unless replaced, so the 2011 Annex 11 applies and the EU draft would not by itself.16 The draft’s other changes are on the Annex 11 revision page.
4Who builds it, and when.
Split the work four ways: the process owner and subject matter experts write and risk-rate the requirements, one validation lead builds and keeps the matrix, testers fill in results as they execute, and the quality unit approves. Annex 11 asks for “close cooperation between all relevant personnel such as Process Owner, System Owner, Qualified Persons and IT”, each with “defined responsibilities”.2 PIC/S expects “all relevant personnel and the Quality Unit” to approve specifications, protocols and acceptance criteria, and for drug equipment FDA says the quality control unit “must review and approve the qualification plan and report”.7,
- Validation plan, written by the validation lead and approved by QA. It sets the matrix’s scope, its granularity (test case or step), each column’s owner, the supplier evidence to be relied on and any service provider’s tasks.1,
12 See the validation master plan. - URS, approved. Each of the process owner’s requirements gets its row, ID and risk rating.2,
4 - Specification. The system owner or supplier names the design or configuration item meeting each row, and design qualification checks the forward link.3,
6 - Protocols. The validation lead gives each row its test or other verification and runs the backward check before execution.1,
4 - Execution. Testers enter results, versions, names, dates and deviations as they happen.1,
6, 5 - Report. QA approves the matrix with the validation report, open rows explained.6
- Every later change. The impact assessment reads the rows the change touches to choose what to retest, and updates the requirements, which the draft Annex 11 makes “the very basis for qualification and validation”.2,
1
Writing the requirements is covered in how to write a URS, how much testing each risk level deserves in risk-based validation, and the supplier rows of a SaaS matrix in validating SaaS for GxP.
5What inspectors look for, and cite.
PIC/S tells inspectors what to sample:
Inspectors should look for the traceability of actions, tests and the resolution of errors and deviations in selected documents. If the firm has not got proper change and version controls over its system life-cycle and validation documents, then the validation status is suspect.
PIC/S PI 011-3, section 23.11.4
FDA’s drug warning letters since 2021 don’t mention traceability matrices: a full-text search of its warning letters, whose index reaches back to January 2021, for the phrase on 26 November 2026 returned two letters, both to device makers.18 The nearest drug finding is a requirement in the firm’s own procedures that its system did not meet:
your Laboratory Information Management System (LIMS) did not include a dilution factor to calculate the number of cfus per gram or milliliter of product for microbial limit test results, as required by your own procedures and applicable compendial methods.
Reliance Life Sciences Private Limited, Navi Mumbai, warning letter of 18 August 2026, under 21 CFR 211.194(a).19 The letter doesn’t mention a matrix; a row tracing that procedural requirement to a LIMS test is the check that finds such a gap before release.
FDA’s device inspectors do cite matrices:
Without design traceability matrices there is no documentation demonstrating that all design requirements, including safety requirements, were properly verified and validated.
Olympus Medical Systems Corporation, warning letter of 7 October 2026, on inspections between October and November 2025 under the former device Quality System regulation. The firm’s own procedures required the matrices.20
Your firm determined that only design verification, not design validation, was required for this user need, but you did not document your justification for this determination.
Happiest Baby, Inc., warning letter of 15 June 2026: a judgment recorded in Design Traceability Matrix DTM-000001, for user need 12 of its SNOO Smart Sleeper, without its reason.21
The lessons carry to drug validation: a procedure requiring a matrix is itself checked, and every judgment in the matrix needs its reason.
6How it runs in Seal.
In Seal’s computer system assurance blueprint, each requirement links forward to configuration and evidence and back to its rationale, so orphan requirements and tests show up during the work, not in a matrix exported at the end. Every execution of a test case is its own test run, so a requirement shows which tests cover it, whether they passed and on which version. The commissioning and qualification blueprint calculates coverage from those links with an explicit denominator, exposing untested requirements, orphan tests, open failures and requirements verified only in an obsolete configuration. FAT results earn qualification credit only under an approved strategy, with their source, witness status and intended credit recorded.
Neil can prepare a traceability matrix that keeps mapped and executed evidence apart, since a linked but unexecuted test does not satisfy a requirement. The validation owner approves the risk-based coverage and verifies the execution evidence.
AQuestions and answers
What is the difference between forward and backward traceability in a traceability matrix?
Forward traceability starts from a requirement and follows it to the design and the tests that verify it, showing nothing was left untested. Backward traceability starts from a test or design item and follows it back to the requirement it serves, showing nothing was built or tested without a reason. A traceability matrix shows both.
Is a traceability matrix used in agile development?
Yes. The draft revision of Annex 11 says requirements apply whether a system is developed in a linear or an iterative way, and FDA’s software validation guidance expects each version of the requirements and design in an iterative project to be controlled. Update the matrix each iteration and record the version tested against each result.
Can a spreadsheet be the traceability matrix?
It can, but it has to stay controlled and current through every change, which is hard to do by hand. The draft revision of Annex 11 encourages effective tools to hold requirements and their traceability, and FDA’s CSA guidance favors automated traceability and digital records over manual documentation.
Does the traceability matrix need to be approved?
Yes, as a qualification and validation document. Annex 15 says every document generated during qualification and validation should be approved and authorized by appropriate personnel as defined in the quality system. Approve it with the validation report, and again whenever a change updates it.
Who owns the traceability matrix?
During the project the validation lead keeps it and QA approves it. After go-live it stays with the system’s validation records, and the system owner, whom Annex 11 defines as the person responsible for the availability and maintenance of a computerized system, keeps it current through change control. The process owner, responsible for the business process, still owns the requirements in it, and QA approves each updated version.
References21 sources
References
- 1Annex 11: Computerised Systems, draft for stakeholders’ consultation, European Commission, July 2025, sections 6 and 9. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 26 November 2026) - 2EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, revision 1, in operation from 30 June 2011, sections 1, 2, 3.3, 4, 7.2 and 10. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 26 November 2026) - 3WHO Technical Report Series No. 1019, Annex 3, Good manufacturing practices: guidelines on validation, Appendix 5, Validation of computerized systems, section 7, WHO, 2019. https:/
/ www. who. int/ docs/ default- source/ medicines/ norms- and- standards/ guidelines/ production/ trs1019- annex3- gmp- validation. pdf (read 26 November 2026) - 4PI 011-3, Good Practices for Computerised Systems in Regulated GxP Environments, PIC/S, 25 September 2007, sections 9.3, 23.10 and 23.11. https:/
/ picscheme. org/ docview/ 3444 (read 26 November 2026) - 5Computer Software Assurance for Production and Quality Management System Software, guidance for industry and FDA staff, FDA, 3 February 2026, sections I and V. https:/
/ www. fda. gov/ media/ 188844/ download (read 26 November 2026) - 6EudraLex Volume 4, Annex 15: Qualification and Validation, European Commission, in operation from 1 October 2015, sections 2, 3.3 and 3.6. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2015- 10_ annex15_ 0. pdf (read 26 November 2026) - 7PI 006-4, Recommendations on Qualification and Validation, PIC/S, in force from 1 October 2026, sections 4.1.6, 4.1.7 and 5.3.3. https:/
/ picscheme. org/ docview/ 11277 (read 26 November 2026) - 821 CFR Part 11, Electronic Records; Electronic Signatures, eCFR, full text searched. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11 (read 26 November 2026) - 921 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, eCFR, full text searched. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 26 November 2026) - 10Stakeholders’ Consultation on EudraLex Volume 4: Chapter 4, Annex 11 and New Annex 22, European Commission, 7 July to 7 October 2025. https:/
/ health. ec. europa. eu/ consultations/ stakeholders- consultation- eudralex- volume- 4- good- manufacturing- practice- guidelines- chapter- 4- annex_ en (read 26 November 2026) - 11EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission, listing Annex 11 as the January 2011 revision. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 26 November 2026) - 12Guideline on computerised systems and electronic data in clinical trials, EMA/
INS/ GCP/ 112288/ 2023, European Medicines Agency, 9 March 2023, Annex 2, sections A2.4 and A2.5. https:/ / www. ema. europa. eu/ en/ documents/ regulatory- procedural- guideline/ guideline- computerised- systems- and- electronic- data- clinical- trials_ en. pdf (read 26 November 2026) - 13Data Integrity and Compliance With Drug CGMP: Questions and Answers, guidance for industry, FDA, December 2018, question 3. https:/
/ www. fda. gov/ media/ 119267/ download (read 26 November 2026) - 1421 CFR 820.10, Requirements for a quality management system, eCFR, paragraph (c). https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820/ subpart- B/ section- 820. 10 (read 26 November 2026) - 15General Principles of Software Validation; Final Guidance for Industry and FDA Staff, FDA, 11 January 2002, sections 3.2 and 5.2. https:/
/ www. fda. gov/ media/ 73141/ download (read 26 November 2026) - 16The Human Medicines Regulations 2012, regulation C17, legislation.gov.uk. https:/
/ www. legislation. gov. uk/ uksi/ 2012/ 1916/ regulation/ C17 (read 26 November 2026) - 17Process Validation: General Principles and Practices, guidance for industry, FDA, January 2011, section IV.C.1. https:/
/ www. fda. gov/ media/ 71021/ download (read 26 November 2026) - 18Warning Letters, FDA, full-text search for “traceability matrix”, index from January 2021, 26 November 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ compliance- actions- and- activities/ warning- letters (read 26 November 2026) - 19Warning letter to Reliance Life Sciences Private Limited, 320-26-117, MARCS-CMS 730801, FDA, 18 August 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ reliance- life- sciences- private- limited- 730801- 08182026 (read 26 November 2026) - 20Warning letter to Olympus Medical Systems Corporation, MARCS-CMS 729208, FDA, 7 October 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ olympus- medical- systems- corporation- 729208- 10072026 (read 26 November 2026) - 21Warning letter to Happiest Baby, Inc., MARCS-CMS 718306, FDA, 15 June 2026. https:/