1What Annex 11 is, section by section.
Annex 11, Computerised Systems, is one of the annexes to the EU GMP guide in EudraLex Volume 4.1 The official text is revision 1: five pages, in operation since 30 June 2011, and revised “in response to the increased use of computerised systems and the increased complexity of these systems”. It applies to “all forms of computerised systems used as part of a GMP regulated activities”, a computerized system being “a set of software and hardware components which together fulfill certain functionalities”.2
| Part | Sections |
|---|---|
| Principle | Scope; the application validated and the IT infrastructure qualified; no loss of quality, control or assurance where a system replaces a manual operation |
| General | 1 Risk Management; 2 Personnel; 3 Suppliers and Service Providers |
| Project phase | 4 Validation |
| Operational phase | 5 Data; 6 Accuracy Checks; 7 Data Storage; 8 Printouts; 9 Audit Trails; 10 Change and Configuration Management; 11 Periodic evaluation; 12 Security; 13 Incident Management; 14 Electronic Signature; 15 Batch release; 16 Business Continuity; 17 Archiving |
| Glossary | Application, bespoke or customized system, commercial off-the-shelf software, IT infrastructure, life cycle, process owner, system owner, third party |
2Annex 11 checklist: the records to produce.
After the principle, the rows run roughly in the order the work happens, from the inventory to archiving.
| Clause | Record, and what it must hold | Suggested owner | What an inspector asks |
|---|---|---|---|
| Principle | IT infrastructure qualified: the hardware, network software and operating systems the application runs on. Where the system replaces a manual operation, evidence of no drop in product quality, process control or quality assurance, and no rise in overall risk | System owner, IT | Was the system verified against the manual system it replaced? |
| 4.3 Inventory | An entry for each system: GMP use, criticality and validation status. For critical systems, a description of data flows, interfaces, hardware and software prerequisites, and security | System owner | May I see the inventory, with each system’s criticality and validation status? |
| 1 Risk | System risk assessment: GMP criticality, critical functions, the extent of validation and controls. Before validation, then through the lifecycle | Process owner, QA | What does the system do, and which functions are GxP-critical? |
| 2 Personnel | Roles of process owner, system owner, Qualified Person (QP) and IT; training and access level for each | QA | Who are the key people, and is anyone a single point of failure? |
| 3 Suppliers | A formal agreement stating the third party’s responsibilities, internal IT included; a supplier assessment, with an audit where risk calls for one, and audit information available to inspectors. At selection | QA, system owner | How do you assess suppliers, and what agreements cover outside services? |
| 4.4 Requirements | A user requirements specification (URS) of required functions, based on risk and GMP impact, traceable through the lifecycle | Process owner | Is each test traced to a requirement? |
| 4.1 to 4.8 Validation | Plan; tests covering parameter limits, data limits and error handling; deviations; migration checks; report | System owner, QA approves | Have all errors and failures been followed up? |
| 5, 6 Data checks | Tested interface checks; a second or validated check of critical data entered by hand | Process owner | Are critical data verified by a second person or a validated method? |
| 7 Storage, backup | Checks that stored data stay accessible, readable and accurate; backup schedule; the ability to restore checked in validation and monitored periodically | System owner, IT | What are the backup and disaster recovery arrangements? |
| 8 Printouts | A release printout that shows changes since entry; where the system cannot produce one, a procedure linking the audit trail printout to the record | Process owner | May I have printed copies of these data? |
| 9 Audit trails | Risk-based configuration; reasons for changes; review records | Process owner, QA | Show me the audit trail for data entry and processing |
| 10 Changes | A change record for every change, configuration included: impact, tests, approval | System owner, QA approves | Are configuration management and change control in place? |
| 12 Security | Access list; records of each grant, change and removal; personal identity on every entry | System owner | How is access controlled? |
| 13 Incidents | Incident log; root cause of each critical incident, feeding corrective and preventive action (CAPA) | System owner | Do records show the analysis of errors and the corrective action? |
| 14, 15 Signatures | Signatures linked to the record, with time and date; only QPs can certify release | QP | How is the chain of batch release linked to the QP? |
| 16 Continuity | A fallback for critical processes, with the time to bring it in set by risk, and a test record | Process owner | What is the alternative if the system fails, and was it tested? |
| 11 Evaluation | Periodic report on functionality, deviations, incidents, problems, upgrades, performance, reliability, security and validation status | System owner, QA | What has changed since the last inspection? |
| 17 Archiving | Archive checks for accessibility, readability and integrity; retrieval tested before relevant system changes | System owner | May I see data from the archive? |
PIC/S tells inspectors to start from the inventory, pick the GxP-critical systems, review their validation evidence, then study each system in use, calling for printouts and archives.4 Audit trails have their own checklist in audit trail requirements.
3How it runs in Seal.
Inspectors start from the inventory. In Seal’s computer system assurance blueprint, the system record is that entry: SampleTrack LIMS, a fictional supplier system, states its intended use, GxP impact and supplier, and the version currently validated, taken from the last released change control. Each requirement shows its risk, the test cases that cover it and each test’s latest released result. Supplier evidence is recorded against the claim it supports, with who evaluated it, the gaps found and the compensating work.
A supplier release is a change control whose Check passes only when every approved test case has a finished, passing run on the version being released, and it cannot publish until the Check passes and every sign-off is given. Periodic review weighs releases, configuration, access, incidents, backup and restore, supplier performance and open risks. Records carry version history, audit trails and role-based access, and electronic signatures keep the signer, time and meaning of the approval, as the technical guide sets out.
4Which rules apply where.
| Jurisdiction | What applies | Source |
|---|---|---|
| EU | Annex 11 is guidance under Article 47 of Directive 2001/83/EC. The binding text is Directive (EU) 2017/1572, Article 9(2): systems validated first, data protected “against unlawful access, loss or damage of data, and audit trails shall be maintained” | Annex 11;2 Directive 2017/15725 |
| PIC/S | The PIC/S GMP Guide carries the same Annex 11 text, with Authorised Person in place of Qualified Person | PE 009-18, 24 September 20266 |
| UK | EU guidelines as they applied before the end of the transition period continue to apply unless MHRA replaces them; MHRA’s 2018 data integrity guidance points to Annexes 11 and 15 for validation | Human Medicines Regulations 2012, C17(3);7 MHRA 6.198 |
| EU clinical trials | Annex 11 covers making investigational medicinal products, and Regulation 2017/1569 sets the same validation, data protection and audit trail duties for them. Systems used to run a trial, such as eCRFs, eCOA, IRT and eTMFs, fall under EMA’s guideline on computerised systems and electronic data in clinical trials, under good clinical practice | Regulation 2017/1569, Article 8;9 EMA/ |
| US | No equivalent annex. Part 11, 211.68(b) and FDA’s 2018 data integrity answers cover much of the same ground: authorized changes, checked input and output, backups, restricted access and validated workflows | 21 CFR 211.68;11 FDA Q3, Q412 |
The point-by-point comparison with FDA is in Part 11 and Annex 11 compared.
5Judgment calls: scope and depth.
| Situation | What is expected | Source |
|---|---|---|
| SaaS or cloud | Agreements cover anyone who provides, maintains or retains the system or processes its data. The draft adds that relying on a provider leaves the regulated user “fully responsible” | 3.1;2 draft 7.113 |
| Audit or questionnaire | Audit need is set by risk, and the draft asks for “an audit or a thorough assessment” by risk and criticality; the risk assessment records why a questionnaire is enough | Annex 11 1, 3.2;2 draft 7.213 |
| Critical data (6) | Risk management covers how critical the data are and the consequences of a wrong entry; data that decide batch release outrank warehouse cleaning records | Annex 11 6;2 PIC/S PI 041-1 5.414 |
| Bespoke or off-the-shelf | Bespoke or customized systems need quality and performance measures at every lifecycle stage; for off-the-shelf products, supplier documents are checked against the URS | 4.6, 3.32 |
| Spreadsheet | Templates checked and version-controlled; formulas verified for correctness; validation “at least for spreadsheets that contain custom code” | EMA Q1, Q33 |
| Embedded software | Small devices: vendor assessment and verification that “may be equivalent to a PQ-phase”, with no audit trail where data are transient. Equipment is also qualified under Annex 15, which sends its software to Annex 11 | EMA Q9;3 Annex 1515 |
| Legacy system | Define user requirements, run a gap analysis, verify the requirements | EMA Q63 |
| ERP or warehouse | In scope when used in GMP activities, so listed and validated | Principle, 4.32 |
| Hybrid system | Each paper and electronic element controlled, with procedures and checks where data are transcribed between them; PIC/S discourages hybrids | PIC/S PI 041-1 9.1014 |
The categories that decide how much to test a configured product are in GAMP 5 software categories, and the provider’s share of SaaS validation in validating SaaS for GxP.
6Example: a periodic evaluation record.
Invented for illustration. Quillby Pharma evaluates its laboratory information management system, LIMS-01, for 1 October 2025 to 30 September 2026, against the areas Annex 11 section 11 and EMA’s answer on revalidation list, and the audit trail, backup and continuity sections.2,
| Area | Finding | Outcome |
|---|---|---|
| Functionality | One new report, released under CC-26-014 on 3 June 2026 | Within validated scope |
| Changes | 14 change records, all closed; releases 9.2 and 9.3 each regression-tested | Accepted |
| Deviations | Three, all closed, no common cause | No trend |
| Incidents | Five; the critical one a 17-hour outage on 12 March 2026, storage full. CAPA-26-022 added a storage alarm and closed on 30 June 2026 | Closed |
| Performance | 18.5 hours down in 8,760: 99.79% available, against at least 99.5% in the service agreement | Met |
| Reliability | No repeat of the outage since the alarm was added | Accepted |
| Security | 146 accounts checked against approved roles; of 12 leavers, 2 removed 9 and 16 days after leaving, against 1 working day in SOP IT-07 | Gap: CC-26-031 |
| Leaver logins | Access log and audit trail show no login by either leaver after their leaving date | No data affected |
| Audit trail review | Review records present for all 30 sampled release results | Meets |
| Backup (7.2) | Restore test passed on 14 May 2026 | Accepted |
| Continuity (16) | Paper fallback used in the outage; 11 results entered afterwards and second-checked | Worked as planned |
| Validation status | Remains validated; CC-26-031 open, due 31 January 2027 | One action open |
The late removals are the finding: section 12 restricts access to authorized persons and expects each removal to be recorded.2 Checking for logins after each leaving date is what supports the finding of no data impact. CC-26-031 ties account removal to the HR leaver process.
The 12-month interval follows criticality. EMA says the interval for revaluation “should be based on the criticality of the system”, and LIMS-01 holds the results QA uses to release batches, the kind of data PIC/S treats as more critical.3,
7How inspectors cite Annex 11.
In February 2026 Hungary’s National Centre for Public Health and Pharmacy withdrew all certificates for Panacea Biotec Pharma’s Baddi site in India, after an inspection dated 31 January 2026. Among the critical observations:
“the ERP system was not indicated on the lists of computerized systems, and it was not validated, the validation had not yet started at the time of the inspection. The system was commissioned on 05.04.2025.” Panacea Biotec Pharma Limited, EudraGMDP statement of non-compliance NNGYK/11120-1/2026, 3 February 202616
The same observation found that a “backup restoration check was not performed in 2025, although it was SOP requirement”.16 Those map to the inventory and backup rows above. Hungary withdrew the statement of non-compliance on 25 November 2026 after a re-inspection; a new GMP certificate is pending.16
In October 2025 the Italian Medicines Agency suspended Valpharma International’s manufacturing authorization at Pennabilli and withdrew its GMP certificate, after 11 deviations, 3 of them critical. The findings included “User logins within the scales are not properly tracked” and equipment qualification “not carried out in accordance with Annex 11”:
“The ERP (SAP) information system does not track all the metadata necessary to ensure complete reconciliation and traceability of materials, raw materials, and excipients.” Valpharma International S.p.A., EudraGMDP statement of non-compliance IT/NRC/01/H/2025, 23 October 202517
8Where the revision stands.
On 25 November 2026 EudraLex Volume 4 still lists Annex 11 as “Computerised Systems (revision January 2011)”, so the 2011 text is in force until the Commission publishes a final revision there.1
| Step | Date or status |
|---|---|
| Concept paper consultation | 16 November 2022 to 16 January 202318 |
| Draft published with Chapter 4 and new Annex 22, drafted by EMA’s GMDP Inspectors Working Group with PIC/S | 7 July 202519 |
| Consultation closed | 7 October 202519 |
| Final text to the Commission | Target Q4 2026, alongside Chapter 4 and Annex 2220 |
| Adoption and date of application | Not announced on 25 November 2026; PIC/S still lists the July 2025 text among its drafts1, |
The Commission says the revision applies quality risk management at every step of a system’s lifecycle, reinforces the definition and upkeep of system requirements and the oversight of suppliers and service providers, and strengthens controls on data integrity, audit trails, electronic signatures and security.19 What the draft changes, clause by clause, is in the draft Annex 11 revision.
AQuestions and answers
Is Annex 11 legally binding?
Annex 11 is a guideline in the EU GMP guide, not legislation. The Commission publishes it to interpret the GMP principles EU law requires, which for human medicines are in Directive (EU) 2017/1572 and for investigational ones in Delegated Regulation (EU) 2017/1569. Both require electronic systems to be validated and audit trails maintained, so the core of Annex 11 rests on law, and inspectors cite it directly. For veterinary medicines, aligned computerized system rules have been law since 16 July 2026, in Annex IV of Implementing Regulation (EU) 2025/2091.
Where is the official text of the current Annex 11?
On the European Commission’s EudraLex Volume 4 page, listed as Annex 11 Computerised Systems, revision January 2011. The 2025 consultation draft is published separately on the Commission’s consultation page and is not the text in force.
Does Annex 11 apply to clinical trials?
To making investigational medicinal products, yes: Delegated Regulation (EU) 2017/1569 sets the same validation, data protection and audit trail duties for them. The systems used to run a trial, such as electronic case report forms, patient diaries, randomization systems and electronic trial master files, fall under EMA’s 2023 guideline on computerised systems and electronic data in clinical trials, written for good clinical practice.
How does Annex 11 relate to Annex 15?
Annex 15 covers qualification and validation of facilities, equipment, utilities and processes, and says computerized systems should also be validated according to Annex 11. For equipment with software, that means qualifying the equipment under Annex 15 and validating the software, its data and its controls under Annex 11.
What is the difference between a process owner and a system owner?
In the Annex 11 glossary the process owner is responsible for the business process. The system owner is responsible for the availability and maintenance of the computerized system and for the security of the data on it. Annex 11 expects both to work closely with Qualified Persons and IT.
Does Annex 11 require IQ, OQ and PQ for software?
Annex 11 does not use those terms. It asks for validation documentation covering the relevant lifecycle steps, user requirements, test methods and scenarios, and qualification of the IT infrastructure. Annex 15 names the URS, DQ, IQ, OQ and PQ stages and allows documents such as IQ and OQ to be combined, and EMA says verification of a small device may be equivalent to a PQ.
References21 sources
References
- 1EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 25 November 2026) - 2EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, cover page, principle, sections 1 to 17 and glossary, European Commission, in operation from 30 June 2011. https:/
/ health. ec. europa. eu/ document/ download/ 8d305550- dd22- 4dad- 8463- 2ddb4a1345f1_ en?filename=annex11_ 01- 2011_ en. pdf (read 25 November 2026) - 3Guidance on good manufacturing practice and good distribution practice: Questions and answers, Annex 11 questions 1 to 10, February 2011, European Medicines Agency. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers (read 25 November 2026) - 4PI 011-3, Good Practices for Computerised Systems in Regulated “GxP” Environments, PIC/S, 25 September 2007, sections 23 and 24 and Table 4. https:/
/ picscheme. org/ docview/ 3444 (read 25 November 2026) - 5Commission Directive (EU) 2017/1572 of 15 September 2017, principles and guidelines of good manufacturing practice for medicinal products for human use, Article 9(2), EUR-Lex. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ ?uri=CELEX:32017L1572 (read 25 November 2026) - 6PE 009-18 (Annexes), Guide to Good Manufacturing Practice for Medicinal Products, Annexes, PIC/S, 24 September 2026, Annex 11. https:/
/ picscheme. org/ docview/ 11333 (read 25 November 2026) - 7The Human Medicines Regulations 2012 (SI 2012/1916), regulation C17, Guidelines on good manufacturing practice and good distribution practice, legislation.gov.uk. https:/
/ www. legislation. gov. uk/ uksi/ 2012/ 1916/ regulation/ C17 (read 25 November 2026) - 8‘GXP’ Data Integrity Guidance and Definitions, revision 1, MHRA, March 2018, section 6.19. https:/
/ assets. publishing. service. gov. uk/ media/ 5aa2b9ede5274a3e391e37f3/ MHRA_ GxP_ data_ integrity_ guide_ March_ edited_ Final. pdf (read 25 November 2026) - 9Commission Delegated Regulation (EU) 2017/1569 of 23 May 2017, good manufacturing practice for investigational medicinal products for human use, Article 8, EUR-Lex. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ ?uri=CELEX:32017R1569 (read 25 November 2026) - 10Guideline on computerised systems and electronic data in clinical trials, EMA/
INS/ GCP/ 112288/ 2023, sections 2 and 3, European Medicines Agency, 9 March 2023. https:/ / www. ema. europa. eu/ en/ documents/ regulatory- procedural- guideline/ guideline- computerised- systems- and- electronic- data- clinical- trials_ en. pdf (read 25 November 2026) - 1121 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- D/ section- 211. 68 (read 25 November 2026) - 12Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, questions 3 and 4. https:/
/ www. fda. gov/ media/ 119267/ download (read 25 November 2026) - 13EudraLex Volume 4, Annex 11: Computerised Systems, draft for consultation, European Commission, July 2025, section 7. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 25 November 2026) - 14PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, sections 5.4 and 9.10. https:/
/ picscheme. org/ docview/ 4234 (read 25 November 2026) - 15EudraLex Volume 4, Annex 15: Qualification and Validation, European Commission, in operation from 1 October 2015, Principle. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2015- 10_ annex15_ 0. pdf (read 25 November 2026) - 16Statement of non-compliance with GMP, report NNGYK/11120-1/2026, Panacea Biotec Pharma Limited, Baddi, National Centre for Public Health and Pharmacy, Hungary, 3 February 2026, withdrawn 25 November 2026, EudraGMDP reference 182795. https:/
/ eudragmdp. ema. europa. eu/ inspections/ gmpc/ prepReviewSubmittedGMPC. do?key=182795 (read 25 November 2026) - 17Statement of non-compliance with GMP, report IT/NRC/01/H/2025, Valpharma International S.p.A., Pennabilli, Italian Medicines Agency, 23 October 2025, EudraGMDP reference 180435. https:/
/ eudragmdp. ema. europa. eu/ inspections/ gmpc/ prepReviewSubmittedGMPC. do?key=180435 (read 25 November 2026) - 18Good Manufacturing Practice (GMP) / Good Distribution Practice (GDP) Inspectors Working Group, concept papers, reflection papers and draft guidelines, Concept Paper on the revision of Annex 11, EMA/
INS/ GMP/ 778340/ 2022, European Medicines Agency. https:/ / www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ good- manufacturing- practice- gmp- good- distribution- practice- gdp- inspectors- working- group (read 25 November 2026) - 19Stakeholders’ Consultation on EudraLex Volume 4, Good Manufacturing Practice Guidelines: Chapter 4, Annex 11 and New Annex 22, European Commission, July 2025. https:/
/ health. ec. europa. eu/ consultations/ stakeholders- consultation- eudralex- volume- 4- good- manufacturing- practice- guidelines- chapter- 4- annex_ en (read 25 November 2026) - 203-year work plan for the GMDP Inspectors Working Group, January 2026 to December 2028, European Medicines Agency. https:/
/ www. ema. europa. eu/ en/ documents/ other/ 3- year- work- plan- inspectors- working- group_ en. pdf (read 25 November 2026) - 21Publications, draft documents, PIC/S. https:/
/ picscheme. org/ en/ publications?tri=draft (read 25 November 2026)
