Skip to main content

What is computer software assurance (CSA), and how does it differ from CSV?

CSV and CSA both show software is fit for its intended use. CSV has typically tested every life-cycle stage; computer software assurance (CSA), in FDA’s device guidance of 3 February 2026, asks whether each function’s failure could foreseeably compromise safety and scales testing and records to match, counting unscripted tests, supplier evidence and logs. Drug makers can scale validation to risk under 21 CFR 211.68 and Annex 11, but the EU’s 2025 draft Annex 11 still expects executed test scripts.Checked against its sources on 26 November 2026. How these answers are made

Illustration of a seal resting on four bound volumes, Requirements, Configuration, Verification and Change control, with a red ribbon running through them all.

1What changes from CSV to CSA, and what does not.

Computer system validation (CSV) and computer software assurance (CSA) both show that software is fit for its intended use. CSA is FDA’s risk-based way of doing it for device production and quality system software, where “the burden of validation is no more than necessary to address the risk”.1 Its 3 February 2026 text supersedes Section 6 of FDA’s 2002 General Principles of Software Validation, the CSV approach compared below.1,2

Table 1. CSV, CSA and Annex 11 compared, with section numbers. Draft means the 2025 EU and PIC/S consultation text; the 2011 Annex 11 is still in force.5,6
TopicCSV (FDA, 2002)CSA (FDA, 2026)EU Annex 11
Starting pointA user requirements specification: intended use, and how far device quality depends on the software (6.2)2The intended use of each feature, function or operation (V.A.1)1Draft: a risk assessment of “individual requirements” (9.2)3
RiskEffort “commensurate with the risk posed by the automated operation” (6.1)2Two classes: “high process risk”, where failure may foreseeably compromise safety, and not high (V.A.2)1Extent set by “a justified and documented risk assessment” (2011, 1)4
TestingTest cases for errors and alarms, start-up, shutdown, user functions, operator errors, limits and stress (6.2)2Scenario, error-guessing and exploratory testing named; scripted or hybrid may suit high risk (V.A.4)1“test methods and test scenarios” (2011, 4.7). Draft: scripts “described in sufficient detail to ensure a correct and repeatable conduct of test steps” (9.7)4,3
Supplier workVendor records a “beginning point”; consider a vendor audit, depending on device risk (6.3)2Vendor work is the starting point, and may be enough for some lower-risk functions (V.A.5)1Supplier assessed (2011, 4.5). Draft: the user is “fully accountable” for vendor documents (9.9)4,3
EvidenceRequirements, protocol, acceptance criteria, test cases and results, validation summary (6.2)2System logs and audit trails preferred to paper and screenshots (V.A.6)1Draft: “executed test scripts, and where relevant, screen dumps” (9.4), each test traced to a requirement (9.5)3
Part 11Validation “should demonstrate that all Part 11 requirements have been met” (6)2Still applies; assurance may be risk-based, but FDA’s Part 11 validation discretion “expressly does not apply” to ISO 13485 validation (V.B)1Its own e-signature rules (2011, 14)4

The draft Annex 11 does not mention unscripted testing, so a system also inspected by EU or PIC/S authorities should keep executed, traceable scripts at least for what draft 9.6 singles out, such as access privileges, release, calculations, audit trails and restore from backup.3 The Annex 11 revision covers the conflict, and computer system validation lists the full CSV deliverables.

2How CSA is done, in four steps.

Section V.A of the guidance comes down to four steps:1

  1. Identify the intended use (V.A.1). Software used directly automates production, inspection, testing or quality processes, or keeps a quality record; supporting software tests or monitors that software, or keeps general records outside the quality record. Both must be validated. Email, accounting, networking, user authentication, and backup and restore generally fall outside production and the quality system, so the ISO 13485 validation requirements “would not apply”; at a drug site, access control and backup stay in scope (below). Document each decision.
  2. Determine the risk-based approach (V.A.2). List reasonably foreseeable failures and rate each function high process risk or not, using FDA’s examples below.
  3. Determine the assurance activities (V.A.4). Rigor follows the device risk where process risk is high, and the process risk where it is not.
  4. Establish the record (V.A.6), as in the examples below. Appendix A works through four more, including a SaaS system.
Table 2. FDA’s examples of generally high and not high process risk (V.A.2).1
What it doesProcess riskCondition FDA gives
Maintains parametersHighSuch as temperature, pressure or humidity, where essential to device safety
Judges acceptabilityHighOf product or process, “with limited or no additional human awareness or review”
Adjusts the processHighFrom monitoring or automated feedback, without human awareness or review
Produces labelingHighInstructions for use or labeling needed for safe operation
Trends safety dataHighData the manufacturer identifies as essential to device safety and quality
Records process dataNot highFor monitoring and review, with no direct impact on production
Runs QMS workflowsNot highCAPA routing, complaint logging, change control, procedure management
Manages dataNot highIncludes automating an existing calculation and exception alerts
Supporting softwareNot highTest tools and general record-keeping (V.A.1)

The human check must be real: in FDA’s ERP example, automated restocking is not high process risk because a qualified person checks materials before use, and the same feature without that check is high. A function a site grades moderate or low gets the not-high recommendations.1

To apply them to your own software, the free CSA plan gives each function its call, the assurance it needs and a record to fill in.

3Example: four functions, assurance scaled to risk.

Example, all invented: a device manufacturer validates the software around Product A in October 2026.

Table 3. Example: one site’s assurance plan, each call tied to the guidance.
FunctionRisk callWhyAssurance
Leak-test accept or rejectHighIt decides product acceptability with no human review of passing units1Scripted boundary tests, plan approved first: record below
eQMS CAPA routingNot highOn FDA’s not-high list1Vendor assessment, installation, exploratory testing: record below
Complaint trend sheetNot highSafety signals and reportability are decided per complaint in the eQMS, not from the trendsExploratory testing of its custom formulas, which FDA says may need “additional validation”1
Test automation toolNot highSupporting software1Vendor evaluation and installation only

The trend sheet is the close call. FDA’s own example record, a spreadsheet graphing nonconformance data, is not high because other controls stop nonconforming product being released. A sheet relied on to catch safety signals would be trending data essential to device safety: high.1

The scripted record for the leak-test station, in the structure FDA recommends:1

  • Intended use. Station software 3.4.0 rejects any Product A unit that loses more than 0.50 kPa in 30 seconds. Passing units go to packing without further inspection.
  • Risk. A false accept ships a leaking unit, which foreseeably compromises safety: high process risk.
  • Test type. Scripted, plan approved by QA first: five decay values at and around the limit from a calibrated signal simulator, and one sensor fault. The station reads to 0.01 kPa.
  • Results and issue. 0.49 and 0.50 kPa were accepted, 0.56 was rejected and an unplugged sensor halted the station, as expected, but 0.51 and 0.54 were also accepted: four of six passed. The software rounded each reading to one decimal place before comparing it with the limit, so both became 0.5.
  • Resolution and conclusion. Version 3.4.1 compares the unrounded reading and displays two decimals; all six cases passed on rerun. No units had been released. Acceptable for its intended use.
  • Who and when. Validation engineer, 14 and 20 October 2026; QA approval, 21 October 2026.

3.1Example: an unscripted test record.

For exploratory testing, FDA’s test plan needs only “high level test plan objectives with pass/fail criteria for each objective (no step-by-step procedure is necessary)”.1

Table 4. Example: an exploratory test record, in the fields of FDA’s record table for unscripted testing.1
Record fieldEntry
Intended useeQMS release 26.2, CAPA module: routes each CAPA to its owner and approvers by CAPA type, and sends overdue reminders
Risk-based analysisNot high process risk: on FDA’s list, and the CAPA coordinator reviews the overdue list weekly
Test type and planExploratory, timeboxed to 90 minutes. Objectives, each pass or fail: all four CAPA types route correctly; reassignment keeps history; owners cannot approve their own CAPA
Testing performed12 test CAPAs across the four types; 3 reassigned; self-approval tried twice. History kept and self-approval blocked: pass. Routing: fail, below
Issue foundAfter reassignment, supplier CAPAs still sent approval to the previous owner’s manager. Fixed by configuration change CC-⁠26-⁠114, then routing retested: pass
ConclusionAcceptable for its intended use with the change in place
Who and whenQA specialist, 15 October 2026; reviewed by the validation lead, 16 October 2026. Evidence: the eQMS audit trail of the 12 CAPAs

4Who the CSA guidance covers.

It is written for device makers, by CDRH and CBER; CDER was only consulted.1

Table 5. Which rule applies, and where CSA fits.
Your caseThe binding ruleWhere CSA fits
Devices (US)Part 820, which since 2 February 2026 incorporates ISO 13485:2016; subclauses 4.1.6, 7.5.6 and 7.6 require software validation1Written for you
Combination products21 CFR 4.4: one CGMP system plus named provisions of the other7Part 820 base: written for you. Drug CGMP base: 4.4(b)(1) adds ISO 13485 clause 4.1, which holds 4.1.6, but not 7.5.6 or 7.67,1
Drugs, biologics, CGT21 CFR 211.68 and Part 11; for CGT see CGT GMP8Not written for you; see below
AI or ML toolsSee validating AIDevices: in scope (V.A).1 Drugs: a CSA supplement for AI is on CDER’s July 2026 agenda, which does not bind CDER9
Device software itselfDesign controls1Out of scope; FDA’s 2002 guidance applies1

4.1Using CSA methods at a drug site or CDMO.

A drug site or CDMO can use CSA’s methods by resting its plan on the drug rules, which already scale validation to risk:

  1. Cite the drug rules. Under 21 CFR 211.68(b), “the degree and frequency of input/output verification shall be based on the complexity and reliability of the computer or related system”, and FDA’s Q&A says “The extent of validation studies should be commensurate with the risk posed by the automated system” (Q3). Part 11 enforcement discretion does not lift these: “persons must still comply with all applicable predicate rule requirements for validation”.8,10,11
  2. Validate each workflow. Q3 treats each CGMP workflow as an intended use: qualifying an MES platform “does not demonstrate that a given MPCR generated by the MES contains the correct calculations”.10
  3. Keep access and backup in scope. Section 211.68(b) requires controls so that only authorized personnel change records, and backup systems “designed to assure that backup data are exact and complete”; Annex 11 has restore checked during validation (7.2).8,4
  4. Name the method. GAMP 5 Second Edition (ISPE, July 2022) added discussion of FDA’s CSA approaches, so a drug plan can cite it.12 GAMP 5 software categories shows the two used together.

For a drug example, see the LIMS functional risk assessment in risk-based validation.

5What inspectors have cited.

Linemaster Switch Corporation’s warning letter of 27 May 2026 cites ISO 13485 clause 7.6: the 2013 validation of its calibration and test software lacked raw data, pass/fail criteria and verification that the software “accurately measures output values and reliably detects nonconforming devices”. It adds:

“He observed there were multiple software COM port errors in both in-process assembly and final product testing areas. Firm personnel described these as routine and these errors were not investigated.”13

Laboratorios Jaloma’s warning letter of 22 May 2026 asks the same of laboratory software under 21 CFR 211.68(b):

“Your GC laboratory instrument was not adequately qualified because you failed to validate the control software or enable audit trails, and the GC data file creation and modification dates were not accurate.”14

In both, the software measured something that decides product quality, which is where CSA asks for more rigor, not less.

6How it runs in Seal.

Seal’s computer system assurance workflow assesses risk at the level of functions and failure modes, and records which claim each piece of supplier evidence supports, with the gaps found. A test case can be automated where the system has an API, or run by hand with each step recorded; an exploratory charter records its mission, scope, risks and timebox, and its execution records observations, anomalies and the tester’s conclusion. A Check on each change control passes only when every approved test case has a finished, passing run on the version being released, and the change cannot publish until it does.

The validation and AI assurance guide sets out how GAMP 5 and CSA shape assurance of Seal itself; your quality team still approves the intended use, assurance scope and release decision. To assess Seal as a supplier, request its security and validation evidence. Validation in Seal keeps executed results with the configuration they were run on.

AQuestions and answers

Is the CSA guidance still a draft?

No. The September 2022 draft was finalized on 24 September 2025, and that final guidance was superseded on 3 February 2026 by a version titled for production and quality management system software, aligned with the amended Part 820.

Is CSA mandatory?

Validation is mandatory; CSA is not. The guidance is non-binding and says a manufacturer can use an alternative approach that satisfies the regulations. Fully scripted testing remains an acceptable way to produce the evidence; CSA allows lighter methods where the risk is lower.

Do systems already validated under CSV have to be revalidated under CSA?

No. The guidance sets no transition and does not ask for existing validation to be redone. It asks for the framework to be used throughout the software’s life cycle, so the natural point to adopt it is the next change, upgrade or new function: rate the affected functions against FDA’s high and not-high examples, keep scripted tests where the risk is high, and record lower-risk testing from system logs rather than screenshots.

Does CSA mean less validation documentation?

For functions that are not high process risk, usually yes: the intended use, the risk result, a summary of what was tested, the issues, a conclusion and who tested when, often taken from system logs rather than screenshots. High process risk functions usually still get detailed test cases and a result for each, with review and approval where appropriate.

Does the CSA guidance apply to cloud and SaaS software?

Yes, where the cloud service is used in production or the quality management system. FDA asks manufacturers to look at intended use: cloud storage that holds quality records is used directly, while storage of other production data may fall outside the validation requirement.

Does CSA change what 21 CFR Part 11 requires?

No. The guidance sends manufacturers to FDA’s Part 11 scope and application guidance to decide whether Part 11 applies, and says Part 11 generally applies to electronic documents that Part 820 requires, including validation evidence.

References14 sources

References

  1. 1Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026. https://www.fda.gov/media/188844/download (read 26 November 2026)
  2. 2General Principles of Software Validation; Final Guidance for Industry and FDA Staff, FDA, 11 January 2002, with its notice on the superseded Section 6. https://www.fda.gov/media/73141/download (read 26 November 2026)
  3. 3Annex 11: Computerised Systems, draft for consultation, European Commission and PIC/S, July 2025. https://health.ec.europa.eu/document/download/40231f18-e564-4043-94de-c031f813d38b_en?filename=mp_vol4_chap4_annex11_consultation_guideline_en.pdf (read 26 November 2026)
  4. 4EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, revision 1, in operation from 30 June 2011. https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf (read 26 November 2026)
  5. 5EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 26 November 2026)
  6. 6Stakeholders’ Consultation on EudraLex Volume 4, Chapter 4, Annex 11 and New Annex 22, European Commission, consultation 7 July to 7 October 2025. https://health.ec.europa.eu/consultations/stakeholders-consultation-eudralex-volume-4-good-manufacturing-practice-guidelines-chapter-4-annex_en (read 26 November 2026)
  7. 721 CFR 4.4, How can I comply with these current good manufacturing practice requirements for a co-packaged or single-entity combination product?, as amended at 89 FR 7522 and 89 FR 51766, eCFR. https://www.ecfr.gov/current/title-21/section-4.4 (read 26 November 2026)
  8. 821 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https://www.ecfr.gov/current/title-21/section-211.68 (read 26 November 2026)
  9. 9CDER Guidance Agenda: New and Revised Draft Guidances Planned for Publication in Calendar Year 2026, FDA, July 2026. https://www.fda.gov/media/185228/download (read 26 November 2026)
  10. 10Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018. https://www.fda.gov/media/119267/download (read 26 November 2026)
  11. 11Part 11, Electronic Records; Electronic Signatures: Scope and Application, Guidance for Industry, FDA, August 2003. https://www.fda.gov/media/75414/download (read 26 November 2026)
  12. 12GAMP 5 Guide, 2nd Edition, ISPE, July 2022. https://ispe.org/publications/guidance-documents/gamp-5-guide-2nd-edition (read 26 November 2026)
  13. 13Warning Letter to Linemaster Switch Corporation, MARCS-⁠CMS 730215, FDA, 27 May 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/linemaster-switch-corporation-730215-05272026 (read 26 November 2026)
  14. 14Warning Letter to Laboratorios Jaloma S.A. de C.V., MARCS-⁠CMS 725939, FDA, 22 May 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/laboratorios-jaloma-sa-de-cv-725939-05222026 (read 26 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.