1How to decide how much testing a system needs.
Risk-based validation scales testing to what a failure could harm. EU GMP Annex 11 says “decisions on the extent of validation and data integrity controls should be based on a justified and documented risk assessment of the computerised system”, taking into account patient safety, data integrity and product quality.1 FDA’s guidance on the scope of Part 11 recommends basing the decision to validate, and its extent, on “a justified and documented risk assessment and a determination of the potential of the system to affect product quality and safety, and record integrity”,2 and its data integrity guidance says the extent of validation studies “should be commensurate with the risk posed by the automated system”.3
For processes and equipment, Annex 15 sets the same rule:4 see process validation and cleaning validation.
For drugs, the rules include 211.68(b), which scales input and output checks to “the complexity and reliability of the computer or related system”,5 and, for systems holding electronic records, 11.10(a), which requires validation to ensure accuracy, reliability, consistent intended performance and the ability to discern invalid or altered records.6 FDA intends to exercise enforcement discretion over 11.10(a), but predicate rule requirements for validation still apply.2 FDA wrote its Computer Software Assurance (CSA) guidance for medical device production and quality management system software;7 its step-by-step method is still a useful model, and the steps below cite the EU or drug-side rule where one exists:
- Decide what is in scope. Keep an inventory of systems and their GMP functionality,1 rating each system’s criticality, for example “direct GMP/GDP impact, indirect impact, none”.8 Software used directly in production or the quality system, or to support it, is in scope; email and accounting generally are not. Record the decision either way.7
- Split the system into functions. Features, functions and operations can carry different risks, so assess each one the site relies on. A system with a single intended use can be assessed as a whole.7 For complex systems, EMA expects “further more detailed risk assessments to determine critical functions”.9
- Name the foreseeable failure. Consider failures that are “reasonably foreseeable (as opposed to likely)”, such as a power outage, and what each would do to product, records or decisions.7
- Count what would catch it. Downstream testing, review, process monitoring, assessed vendor work and the software’s own monitoring can reduce the assurance needed.7
- Rate it and choose the assurance, using the rules and tables below.
- Record it in the template below. The record “need not include more evidence than necessary”.7
- Reopen it on change. Changes, configuration included, follow a defined procedure, and periodic evaluation confirms the system remains in a valid state.1 WHO adds that “automatic or live updates should be subject to review prior to becoming effective”.10
Annex 11 asks for close cooperation between the process owner, system owner, Qualified Persons and IT.1 Have the process owner state what each function is relied on for, the system owner and IT say how it can fail, and QA approve the ratings.
2Functional risk assessment template.
One row per function. The right-hand column is the requirement each field answers.
| Field | What to enter | Requirement it meets |
|---|---|---|
| Function | The feature, function or operation, its ID and the user requirements it serves | CSA V.A(1);7 Annex 11 4.4: requirements “traceable throughout the life-cycle”1 |
| Intended use | The GMP record, calculation or decision it supports | Annex 11 4.3;1 FDA: each CGMP workflow is an intended use3 |
| GMP impact | Patient safety, product quality or data integrity, and how | Annex 11 section 11 |
| Failure | Wrong value, missing record, wrong user, lost data | CSA V.A(2): reasonably foreseeable failures7 |
| Effect | What happens to the product, record or decision | ICH Q9(R1): link to protecting the patient11 |
| Caught by | The downstream check, review or monitoring that would reveal it | CSA V.A(5)7 |
| Risk | High, medium or low, by the site’s written rule | CSA V.A(2);7 ICH Q9(R1) section 5.111 |
| Assurance | Supplier evidence, unscripted, limited scripted or robust scripted | CSA V.A(4), V.A(5) and Table 17 |
| Test focus | Parameter limits, data limits, error handling, interfaces | Annex 11 4.7 and 51 |
| Evidence | Test script and case IDs, version tested, results, issues, conclusion, who and when | CSA V.A(6);7 draft Annex 11 9.5: each case traced to a requirement12 |
| Rationale | Why this depth is enough, and who approved it | Annex 11 4.11 |
| Reopen when | Change, incident or periodic review that reopens the row | Annex 11 sections 10 and 111 |
2.1How to rate a function.
- High. A failure could let a wrong result, record or decision reach a batch decision or a patient with little or no human check. FDA’s examples include functions that maintain process parameters essential to safety, or that “determine acceptability of product or process with limited or no additional human awareness or review”.7
- Medium. The failure would cause a GMP problem that another control would catch first. In FDA’s example, an ERP feature delivers the wrong materials, but staff check them before use.7
- Low. The function supports GMP work without directly affecting product or records. FDA lists CAPA routing, complaint logging and change control workflow automation as generally not high process risk.7
- Out of scope. No GMP use, or none whose failure could affect product quality, safety or record integrity: FDA’s example is that validation “would not be important for a word processor used only to generate SOPs”.2 Write down why.7
FDA sorts functions into “high process risk” and “not high process risk”, and accepts finer grades such as moderate or low.7
3Example: a functional risk assessment for a LIMS.
This example is invented: the laboratory, system version, records and people are illustrative. It covers eight functions of the LIMS in the Quillmere QC laboratory, assessed in August 2026 before go-live.
| ID | Function | If it fails | Caught by | Risk | Assurance |
|---|---|---|---|---|---|
| F-01 | Calculates assay from peak areas, weights and dilutions | Wrong reportable result | Reviewer checks inputs, not the formula | High | Robust scripted |
| F-02 | Compares result with specification, sets pass or fail | Failing batch shown as passing | Nothing downstream repeats it | High | Robust scripted, with boundary and negative cases |
| F-03 | Records changes to results in the audit trail | Change with no record | Audit trail review, only if the entry exists | High | Robust scripted |
| F-04 | Imports results from the chromatography data system | Value altered in transfer | Reviewer compares a sample of values | High | Robust scripted |
| F-05 | Stops analysts approving their own results | Self-approval | QA checks approver names on release results only, not stability or in-process | High | Robust scripted, rerun after every update |
| F-06 | Schedules stability pulls | Missed pull | Monthly review against the protocol | Medium | Limited scripted, plus exploratory |
| F-07 | Prints sample labels at login | Wrong label | Barcode check at receipt | Medium | Limited scripted, plus scenario testing |
| F-08 | Dashboard for management review | Wrong count on a chart | Not used for batch decisions | Low | Supplier evidence and configuration records, as supporting software |
3.1Example: the record for F-02.
- Intended use. Compares each reportable result with the product specification and sets pass or fail before QA review.
- Risk. High. A wrong pass could put a failing batch forward for release, and no later step repeats the comparison.
- Tested. LIMS version 7.2, configuration baseline CB-14, in the test environment.
- Test type. Robust scripted, script TS-F02, approved 1 September 2026, each case traced to requirement URS-041.
- Cases. 18 cases: a value just inside, at and just outside the limit for six specifications. 4 negative cases: text, a blank, too many decimals and a result for the wrong test. 22 in all.
- Issue. Case 11 failed. For an upper-limit specification, a result equal to the limit was set to fail: the comparison was configured as “less than” instead of “not more than”. Corrected under change control CC-26-088, and all 22 cases rerun and passed. The other 46 upper-limit specifications were checked for the same setting, and 3 were corrected.
- Conclusion. Acceptable for its intended use after the correction.
- Who and when. Executed by a QC analyst on 15 September 2026 and rerun after the correction on 17 September; reviewed and approved by QA on 18 September 2026.
Every field is one FDA lists for the record,7 and the boundary and negative cases are what the draft Annex 11 asks testing to focus on.12
4Matching the testing to the risk.
FDA suggests scripted testing, or a hybrid, for high process risk functions and unscripted testing for the rest, but says these examples “are not exclusive to those categories”.7 Mapping three grades onto FDA’s activities, as below, is a site choice. For test methods, CSA also points to ISPE’s GAMP 5 Second Edition (July 2022):7,
| Risk | FDA CSA activity | Record FDA describes | EU GMP adds |
|---|---|---|---|
| High | Robust scripted, or scripted plus unscripted | Test objectives, step-by-step cases, expected and actual results, issues, conclusion, who and when, approval | Draft Annex 11: approved scripts detailed enough to repeat12 |
| Medium | Limited scripted cases plus unscripted testing | Limited cases and results, a summary of the unscripted testing | Annex 11: scenarios covering limits and error handling1 |
| Low | Scenario testing, error guessing or exploratory testing | Summary of what was tested, issues, conclusion, who and when | Annex 11: evidence of appropriate test methods1 |
| Supporting software | Vendor assessment, installation and configuration | Intended use, risk result, vendor assessment and configuration records | Annex 11: supplier assessed; COTS documentation reviewed against user requirements1 |
5Judgement calls that trip teams up.
- The platform is not the workflow. FDA: “If you validate the computer system but you do not validate it for its intended use, you cannot know if your workflow runs correctly.” Qualifying an MES does not show that a master record built in it calculates correctly.3
- Unlikely is not out of scope. Step 3 asks what is foreseeable, not what is likely, so a rare failure still gets its row.7 If your rule also scores probability, as an FMEA does, be ready to justify that score: ICH Q9(R1) warns that subjectivity especially affects hazard identification and “the estimation of probability of occurrence and severity of harm”, wanting scores based on “evidence, science and knowledge”.11
- Calculations. FDA lists automating an existing calculation among functions that are generally not high process risk, but a calculation whose output decides acceptability with no further human review fits its high-risk list.7 Rate by who checks the output: F-01 is high because reviewers check its inputs, not its arithmetic.
- Backup and restore. CSA treats infrastructure software not specific to production or the quality system, such as backup and restore, as generally outside the validation requirement.7 Annex 11 asks for the ability to restore data to be checked during validation and monitored periodically,1 and for drugs 211.68(b) requires backup data to be “exact and complete”,5 so drug manufacturers still test it.
- Data integrity on its own. CSA’s high process risk turns on safety; Annex 11 adds data integrity, so a function that could corrupt a GMP record unnoticed can rate high even if product is unaffected.1,
7 - Lower risk is not no evidence. ICH Q9(R1) says resource constraints “should not be used to justify the use of lower levels of formality”, and that risk management should not justify a practice that would otherwise be unacceptable.11
6What inspectors cite.
Two 2026 FDA warning letters to drug manufacturers show what inspectors find when high-risk functions go untested or uncontrolled.
Your GC laboratory instrument was not adequately qualified because you failed to validate the control software or enable audit trails, and the GC data file creation and modification dates were not accurate.
Laboratorios Jaloma S.A. de C.V., warning letter 320-26-78 of 22 May 2026, under 21 CFR 211.68(b).15
In April 2026, FDA asked Ava Inc. for an independent assessment of every laboratory computer system, after the firm said a software update had let users bypass its access restrictions and that it had disabled automatic updates:
Identify and evaluate vulnerabilities in performance and security of all of these computer systems including, but not limited to, their configurations, administrative rights, password controls, audit trail capabilities and state of implementation for each system, qualification/validation status, deviation history, backup capabilities, network requirements, completeness of data records, suitability of current hardware/software for its intended use(s), change management, and management oversight.
Ava Inc., warning letter 320-26-64 of 14 April 2026.13
6.1What an inspector asks to see.
- The inventory, with each system’s GMP function, criticality and validation status: Annex 11 4.3;1 PI 041-1 9.3.8
- The risk assessment that justified each reduced test set, and its approval: Annex 11 sections 1 and 4.1.1
- Traceability from each user requirement to its risk rating and the test cases that cover it: Annex 11 4.4;1 see traceability matrix in validation.
- Supplier evidence: the assessment, any audit, and your review of the supplier’s documentation; audit information “should be made available to inspectors on request”: Annex 11 3.2 to 3.4.1
- Test evidence for every high-risk function, with deviations found: Annex 11 4.2 and 4.7.1
- Change records, supplier updates included, with what was retested: Annex 11 section 10; Ava’s “change management”.1,
13 - Live access and audit trail settings, against the validated configuration: Annex 11 sections 9 and 12; Ava’s “configurations, administrative rights, password controls”.1,
13 - Periodic review reports: Annex 11 section 11.1
7What changed from 2023 to 2026.
- ICH Q9(R1), adopted on 18 January 2023, added the sections on formality and subjectivity quoted above, and lists “the extent of testing and test methods” among its uses for computer systems.11 See ICH Q9(R1) quality risk management.
- FDA’s CSA guidance, final on 24 September 2025, was replaced on 3 February 2026 by a version for “quality management system” software, aligned with the QMSR in effect from 2 February 2026.7,
16 See CSA vs CSV. - Annex 11 is still the January 2011 text.17 The July 2025 draft would base the scope of validation on “a justified and documented risk assessment of individual requirements”, set a testing focus running from access privileges to restore from backup, and expect scripts detailed enough to repeat. Section 9.5 says test cases not traceable to requirements or specifications “do not meet the requirements to qualification and validation”.12 See the Annex 11 revision.
8How it runs in Seal.
In Seal, assurance starts from intended use and function-level risk. The computer system assurance blueprint connects each function’s intended behaviour, failure modes, detectability, patient or product impact, data integrity impact and existing safeguards, and the classification sets the depth and independence of the assurance work rather than a fixed document set.
Each supplier release is a change control. Its automated test cases run against the test environment, and a tester records a run of each manual test case. A required Check passes only when every approved test case has a finished, passing run on the version being released, and the change cannot publish until it passes and every sign-off is given. In quality risk management, each scenario and control links to its verification, so a failed verification reopens the risk review.
AQuestions and answers
Can we use an FMEA to rate computer system functions?
Yes. FMEA is one of the tools ICH Q9(R1) lists, and the template above already holds most of an FMEA row: the function, how it can fail, the effect and what would catch it. If you score severity, occurrence and detection, write down before scoring which scores make a function high, medium or low, and have QA approve that rule with the assessment.
Can we rely on the supplier’s own testing?
For part of the work, once you have assessed the supplier. FDA’s CSA guidance says assurance for lower-risk supporting software may come from vendor evaluation and validation records, installation or configuration, without further testing, and Annex 11 expects documentation for off-the-shelf products to be reviewed against your user requirements. The supplier tested its product, not your configuration or your intended use, so high-risk functions as you have set them up still need your own testing. The conclusion that the system is fit for use stays with you.
Should the risk assessment be repeated after a change?
Yes, for the functions the change touches. Assess which functions, data and controls the change affects, rerate them if their failure modes or safeguards have moved, and test what the new ratings call for. Evidence for unaffected functions can stand, with the reason recorded. A supplier update counts as a change even when it arrives automatically.
Can a risk-based approach justify not validating a system at all?
Only if its failure could not affect product quality, patient safety or the integrity of GMP records, and that conclusion should be written down. Once a system supports production, testing or quality records, a low rating reduces the evidence needed, sometimes to supplier evidence plus installation and configuration records, but it does not remove the need for a documented conclusion that the system is fit for its intended use.
References17 sources
References
- 1EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, revision 1, in operation from 30 June 2011, sections 1 to 5, 7.2 and 9 to 12. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 8 November 2026) - 2Guidance for Industry: Part 11, Electronic Records; Electronic Signatures, Scope and Application, FDA, August 2003, section III.C.1. https:/
/ www. fda. gov/ media/ 75414/ download (read 8 November 2026) - 3Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, question 3. https:/
/ www. fda. gov/ media/ 119267/ download (read 7 November 2026) - 4EudraLex Volume 4, Annex 15: Qualification and Validation, European Commission, 30 March 2015, General. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2015- 10_ annex15_ 0. pdf (read 7 November 2026) - 521 CFR 211.68(b), Automatic, mechanical, and electronic equipment, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 68 (read 7 November 2026) - 621 CFR 11.10(a), Controls for closed systems, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11/ subpart- B/ section- 11. 10 (read 8 November 2026) - 7Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026, sections III and V.A(1) to V.A(6), Table 1 and footnote 25. https:/
/ www. fda. gov/ media/ 188844/ download (read 8 November 2026) - 8PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, section 9.3, item 2. https:/
/ picscheme. org/ docview/ 4234 (read 7 November 2026) - 9Guidance on good manufacturing practice and good distribution practice: questions and answers, EU GMP guide annexes, Annex 11: Computerised systems, question 5, EMA, February 2011. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers (read 8 November 2026) - 10Good manufacturing practices: guidelines on validation, WHO Technical Report Series No. 1019, Annex 3, Appendix 5: Validation of computerized systems, World Health Organization, 2019, section 13.12. https:/
/ cdn. who. int/ media/ docs/ default- source/ medicines/ norms- and- standards/ guidelines/ production/ trs1019- annex3- gmp- validation. pdf (read 7 November 2026) - 11ICH Q9(R1), Quality Risk Management, ICH, adopted 18 January 2023, sections 1, 3, 5.1, 5.3 and Annex II.4. https:/
/ database. ich. org/ sites/ default/ files/ ICH_ Q9%28R1%29_ Guideline_ Step4_ 2023_ 0126_ 0. pdf (read 8 November 2026) - 12Annex 11: Computerised Systems, draft for consultation, European Commission and PIC/S, July 2025, section 9. https:/
/ picscheme. org/ docview/ 9714 (read 7 November 2026) - 13Warning Letter 320-26-64, Ava Inc., MARCS-CMS 721180, FDA, 14 April 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ ava- inc- 721180- 04142026 (read 7 November 2026) - 14ISPE GAMP 5 Guide: A Risk-Based Approach to Compliant GxP Computerized Systems, Second Edition, ISPE, July 2022. https:/
/ ispe. org/ publications/ guidance- documents/ gamp- 5- guide- 2nd- edition (read 8 November 2026) - 15Warning Letter 320-26-78, Laboratorios Jaloma S.A. de C.V., MARCS-CMS 725939, FDA, 22 May 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ laboratorios- jaloma- sa- de- cv- 725939- 05222026 (read 7 November 2026) - 16Computer Software Assurance for Production and Quality Management System Software, guidance document page, FDA, final, February 2026. https:/
/ www. fda. gov/ regulatory- information/ search- fda- guidance- documents/ computer- software- assurance- production- and- quality- management- system- software (read 7 November 2026) - 17EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 7 November 2026)