Skip to main content

What goes in a validation summary report?

A validation summary report states each result against its acceptance criterion, every deviation with its root cause and impact, any open items with an owner and due date, and a conclusion: release, release with conditions, or do not release. No US rule names release with conditions; where a site allows it, the report explains why each open item cannot affect quality, patients or data. It cites the plan or protocol it closes, and QA approves it before routine use.Checked against its sources on 26 November 2026. How these answers are made

1Validation summary report template, item by item.

The summary report closes a validation: it says what was done, what was found and whether the system, process or method can be used. No US regulation uses the term. FDA’s process validation guidance, written for drugs, says of qualifying utilities and equipment that “The quality control unit must review and approve the qualification plan and report (§ 211.22)”, and wants a process qualification report to “State a clear conclusion as to whether the data indicates the process met the conditions established in the protocol”.1 For cleaning, “FDA expects a final validation report which is approved by management and which states whether or not the cleaning process is valid.”2 For computer systems, the duty to validate is in 21 CFR 211.68(b) and 11.10(a).3,4 In the EU, Annex 15, guidance under Article 47 of Directive 2001/83/EC, wants the results “summarised against the acceptance criteria” and “a final recommendation made as to the outcome of the validation.”5 ICH Q7, for active ingredients, asks for a report “that cross-references the validation protocol”.6

Table 1. What a validation summary report states, in order, with the basis of each. WHO section numbers are from TRS 1019 Annex 3; App. 5 is its computerized systems appendix.7,5,8,1,6
ItemWhat it statesBasis
Title and referenceThe plan or protocol it closes, by numberGuidance: ICH Q7 12.22; WHO App. 5, 3.6
What was doneActivities performed, and any not doneGuidance: WHO App. 5, 3.5, 3.6
Results against criteriaEach criterion, and whether it was metGuidance: Annex 15, 2.9; WHO App. 5, 3.7
DeviationsEach one, its root cause and its impactGuidance: Annex 15, 2.8; WHO App. 5, 3.6
Changes during executionWhat changed, and the justificationGuidance: Annex 15, 2.7, 2.9
Open itemsImpact, owner, due date, interim controlDraft guidance: Annex 11 (2025), 9.8
Procedures and trainingThe procedures in force; who was trainedGuidance: WHO App. 5, 3.6
Conclusion and releaseSuccessful or not; the release decisionGuidance: WHO App. 5, 3.8; FDA PV IV.C.4
Monitoring after releaseWhat to watch, and when it is reviewedGuidance: WHO 9.6; WHO App. 5, 3.8
ApprovalThe departments that did the work, and QAGuidance: FDA PV IV.C.1; WHO 9.7, 9.8

Annex 15 lets the release sit in the report or in “a separate summary document”, so a site can write one report for each stage and a summary that closes the plan.5 PIC/S, in a table it takes from GAMP 4, describes that summary: “The Validation Report should summarize all deliverables and activities and provides evidence that the system is validated.”9 The stage reports themselves are covered in IQ, OQ and PQ.

Three habits make a report hold up:

  • Numbers, not adjectives. A reader can check 59 of 59 test cases passed, 57 at the first run. Nobody can check the word successful.
  • A failed test is not a failed validation. Annex 15 says “Results which fail to meet the pre-defined acceptance criteria should be recorded as a deviation and be fully investigated according to local procedures.” The report then discusses what each one means for the validation.5
  • Keep the criteria fixed. “Any subsequent changes to acceptance criteria should be scientifically justified”, in the report, not quietly.5

2Release, release with conditions, or do not release?

The three questions a summary report answers to reach release, release with conditions, or do not release
Figure 1. The three questions a summary report answers to reach release, release with conditions, or do not release

Do not release while work is missing. WHO says a computerized system “needs to be validated according to an approved protocol and a final report including results and conclusions, prior to routine use.”7 When a process has not been shown to be in control, FDA wants the report to “state what should be accomplished before such a conclusion can be reached.”1

Do not release while a risk is unexplained. WHO asks for each deviation to be investigated to a root cause, and for critical and major test discrepancies to be investigated and resolved: “If critical and major test discrepancies are accepted after investigation, they should be appropriately justified.”7

Release with conditions. No US regulation names it. FDA’s Computer Software Assurance guidance, written for devices and final in its 3 February 2026 version, comes closest.10 Its conclusion statement includes how issues were resolved, and “The manufacturer may consider including process controls implemented to address any impact from the issues to the intended use or appropriate risk justification addressing why the issues found will not impact the intended use.”11 The draft revision of Annex 11 says “Conditional approval to proceed to taking a system into use may be granted where certain acceptance criteria have not been met, or deviations have not been fully addressed.” It needs a documented assessment that the deficiencies will not affect product quality, patient safety or data integrity, and then “it should be explicitly stated in the validation report and there should be close follow-up on approval of outstanding actions according to plan.”8 That text was still a draft on 26 November 2026, and the 2011 Annex 11 in force says nothing on conditional release.12,13,14 Annex 15 allows conditional approval only to move to the next qualification stage, with “a documented assessment that there is no significant impact on the next activity.”5

Release. WHO: “The report should be approved after appropriately addressing any issue identified during validation, and the system should then be released for routine GMP use.”7

3How it runs in Seal.

In Seal’s computer system validation blueprint, the release brings together intended use, current risk, supplier assessment, requirements, configuration, testing, open anomalies, procedures, training and operational readiness. When you approve it, approval fixes the accepted versions and rationale, and deployment confirmation checks that production matches the released baseline before regulated use begins. A known limitation can be accepted with a compensating control, but only when its operational owner and monitoring are explicit.

In Seal’s validation blueprint, release is a decision on a defined baseline: the selected requirements, the executed results, the deviations and the remaining limitations. Authorized reviewers decide what the evidence supports, separately from saving or completing a record.

4How process, cleaning, method and system reports differ.

The items in the template are the same for every kind of validation. What the conclusion has to say differs:

Table 2. The conclusion each kind of validation report reaches.1,2,7,11
KindThe conclusion saysBasis
Process (PPQ)Protocol met; process in a state of controlGuidance: FDA PV IV.C.4
CleaningWhether the cleaning process is validGuidance: FDA cleaning guide; WHO App. 3, 4.9
Analytical methodEach characteristic against its criterionGuidance: WHO App. 4, 5.1
Computer systemAcceptable for its intended use; issues resolvedGuidance (devices): FDA CSA V.A(6); Guidance: WHO App. 5, 3.8

For a process or a cleaning study, WHO also wants recommendations for future monitoring and for alert and action limits, where applicable.7 The PPQ report’s own checklist is on process validation stages, the cleaning study’s on cleaning validation, and the method’s characteristics on ICH Q2(R2). For a computer system, CSA asks the record to show who tested and when, and an approval “when appropriate (e.g., when necessary, a signature and date of an individual with signatory authority).”11

5Example: ExamMES 2’s validation summary report.

Invented for illustration. Report QA-⁠VSR-⁠001 closes version 2 of Exampla’s validation plan for ExamMES 2, QA-⁠VP-⁠001, for the SaaS batch record system for vial filling at Exampla Pharma Services LLC in Durham, North Carolina. Testing ran as the plan scheduled: the installation check on 7 April 2025, the 56 scripted OQ cases and 7 unscripted sessions from 9 to 25 April, and the 3 simulated batches, scripted as PQ cases, from 12 to 16 May. The last retest passed on 20 May. QA’s computer systems lead approved the report on 29 May 2025, 4 days before the 2 June 2025 go-live.

Table 3. Example. QA-⁠VSR-⁠001: results against the acceptance criteria in QA-⁠VP-⁠001. The firm and records are invented.
CriterionResultMet?
Scripted cases passing: 56 OQ, 3 PQ batches59 of 59; 57 at first runYes, after 2 deviations
High-risk requirements verified26 of 26Yes
Medium-risk requirements verified34 of 35URS-⁠052 partly met: OI-⁠1
Low-risk requirements explored23 of 23, in 2 sessionsYes
Batch calculations matching hand calculations3 of 3 batchesYes
Users trained before go-live44 of 44Yes

The 2 cases that failed at the first run are the 2 deviations below: OQ-⁠MES-⁠031, and PQ-⁠03, the simulated batch through master batch record MBR-⁠03. Every calculation in the 3 batches matched; PQ-⁠03 failed on a role, not a number.

The 7 unscripted sessions recorded 6 observations: 5 on usability with no GxP impact, sent to the vendor, and 1 vendor defect, VD-⁠118. URS-⁠052, a medium-risk requirement, asks that a printed batch record show every entry and correction with its reason. It had no scripted case; a session tested it and found that printouts omit the reasons for corrections. So all 59 scripted cases passed, yet URS-⁠052 is met only in the electronic record, and VD-⁠118 became OI-⁠1.

Table 4. Example. QA-⁠VSR-⁠001: the 2 failures at the first run, each with its root cause. All 7 reruns of related cases passed.
DeviationRoot cause and fixRetest
DEV-⁠25-⁠044, OQ-⁠MES-⁠031, yield calculationSet to round to one decimal; correctedPassed; 4 related cases rerun
DEV-⁠25-⁠051, PQ-⁠03, the MBR-⁠03 batchOne user could do and check a step; role fixedPassed 20 May; 3 role cases rerun
Table 5. Example. QA-⁠VSR-⁠001: the open items behind the conditional release.
Open itemInterim controlOwner, due
OI-⁠1: printouts omit correction reasonsCopies made from the system, with audit trailSystem owner, 30 September 2025
OI-⁠2: vendor CAPA on emergency change noticesWeekly check of the vendor’s release logQA, 15 September 2025

The report assesses each open item. OI-⁠1 leaves the electronic record and its audit trail complete, and copies for review and inspection are made from the system, which is what 21 CFR 11.10(b) asks of a copy: “accurate and complete copies of records in both human readable and electronic form”.4 OI-⁠2 is a supplier audit finding; until the vendor closes it, a weekly check catches any unannounced change. Neither can affect product quality, patient safety or data integrity while its control runs.

Conclusion, as written: ExamMES 2 release 2.3 is acceptable for its intended use and is released for GMP use with conditions OI-⁠1 and OI-⁠2. The report states the conditional release in so many words, because the EU client’s Qualified Person audits Exampla against EU GMP. It recommends that the first periodic review, covering 2 June 2025 to 1 June 2026, confirm both items closed. In the diagram, the report takes the red path.

A comment from this page, not the report: the draft Annex 11, published for consultation on 7 July 2025,15 about six weeks after the report, would ask for that statement: a conditional approval “should be explicitly stated in the validation report”.8

6Who approves the report, and when.

In the US, QA approves as the quality control unit: FDA’s process validation guidance cites 21 CFR 211.22 for the qualification plan and report,1 and that rule gives the quality control unit “the responsibility for approving or rejecting all procedures or specifications impacting on the identity, strength, quality, and purity of the drug product.”16 WHO asks the departments that did the work to approve the completed report, and QA when appropriate.7 Annex 15 wants the release “authorised by the relevant responsible personnel”.5

Table 6. Who signs a summary report. The split is practice; the basis column gives the source of each duty.1,7
RoleSigns forBasis
System or process ownerThe results and the open itemsGuidance: WHO 9.7
IT, engineering or the vendor’s contactThe installation and interface resultsGuidance: WHO 9.7
QAThe report and the release decisionGuidance: FDA PV IV.C.1; WHO 9.8

The timing follows from the purpose: approve before routine use, and release after approval or in the same signature. A report written months after go-live documents a decision nobody made at the time.

7After release: closing the open items.

A conditional release is a promise with dates. The draft Annex 11 wants “close follow-up on approval of outstanding actions according to plan”.8 As practice, run each open item through the site’s CAPA or change control, close it with its evidence and a short QA-approved addendum to the report, and treat a missed due date as a deviation that reassesses the interim control. WHO also asks the report to recommend future monitoring where applicable.7 The first periodic review is where an inspector expects to see every open item closed, or explained.

AQuestions and answers

Can a system be used before its validation report is approved?

Not for routine GMP use. WHO wants a computerized system validated under an approved protocol and a final report before routine use, and FDA wants QA, as the quality control unit, to approve the report. Annex 15 lets the release sit in the report or in a separate summary document, but either way it follows review of the evidence.

Is a validation summary report the same as a validation report?

Often, but not always. Some sites write one report per protocol, such as IQ, OQ and PQ, and a summary report that pulls them together, closes the plan and records the release. Others write a single report. Either works if the conclusion covers every deliverable the plan committed to.

Does one failed test case mean the validation failed?

No. A result that misses its criterion is recorded as a deviation, investigated to a root cause, corrected and retested, and the report says what it meant for the validation. The validation fails only if the system, process or method cannot meet its intended use, or a risk to quality, patients or data remains.

What happens if an open item misses its due date?

Treat it as a deviation. Reassess whether the interim control still holds, and let QA decide whether to extend the date, restrict use or stop. The draft Annex 11 expects close follow-up of outstanding actions against plan, and an inspector will read the dates.

References16 sources

References

  1. 1Process Validation: General Principles and Practices, Guidance for Industry, sections IV.C.1 and IV.C.4, FDA, January 2011. https://www.fda.gov/media/71021/download (read 26 November 2026)
  2. 2Guide to Inspections: Validation of Cleaning Processes (7/93), section III, General Requirements, FDA, July 1993. https://www.fda.gov/validation-cleaning-processes-793 (read 26 November 2026)
  3. 321 CFR 211.68, Automatic, mechanical, and electronic equipment, paragraph (b), eCFR. https://www.ecfr.gov/current/title-21/section-211.68 (read 26 November 2026)
  4. 421 CFR 11.10, Controls for closed systems, paragraphs (a) and (b), eCFR. https://www.ecfr.gov/current/title-21/section-11.10 (read 26 November 2026)
  5. 5EudraLex Volume 4, Annex 15: Qualification and Validation, sections 2.7 to 2.10, European Commission, in operation from 1 October 2015. https://health.ec.europa.eu/system/files/2016-11/2015-10_annex15_0.pdf (read 26 November 2026)
  6. 6ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, section 12.22, ICH, 10 November 2000. https://database.ich.org/sites/default/files/Q7%20Guideline.pdf (read 26 November 2026)
  7. 7Good manufacturing practices: guidelines on validation, WHO Technical Report Series No. 1019, Annex 3, sections 9.6 to 9.8, Appendix 3 section 4.9, Appendix 4 section 5.1 and Appendix 5 sections 3.1 and 3.5 to 3.8, World Health Organization, 2019. https://www.who.int/docs/default-source/medicines/norms-and-standards/guidelines/production/trs1019-annex3-gmp-validation.pdf (read 26 November 2026)
  8. 8EudraLex Volume 4, Annex 11: Computerised Systems, draft for consultation, section 9.8, European Commission and PIC/S, July 2025. https://health.ec.europa.eu/document/download/40231f18-e564-4043-94de-c031f813d38b_en?filename=mp_vol4_chap4_annex11_consultation_guideline_en.pdf (read 26 November 2026)
  9. 9PI 011-⁠3, Good Practices for Computerised Systems in Regulated GxP Environments, table 6, PIC/S, 25 September 2007. https://picscheme.org/docview/3444 (read 26 November 2026)
  10. 10Computer Software Assurance for Production and Quality Management System Software, guidance document page, status final, FDA. https://www.fda.gov/regulatory-information/search-fda-guidance-documents/computer-software-assurance-production-and-quality-management-system-software (read 26 November 2026)
  11. 11Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, section V.A(6), FDA, 3 February 2026. https://www.fda.gov/media/188844/download (read 26 November 2026)
  12. 12EudraLex Volume 4, Good Manufacturing Practice guidelines, listing Annex 11 “Computerised Systems (revision January 2011)”, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 26 November 2026)
  13. 13Publications: Drafts, listing “Draft guidelines: Revised Annex 11 - Computerised systems”, PIC/S. https://picscheme.org/en/publications?tri=draft (read 26 November 2026)
  14. 14EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, sections 4 and 10, European Commission, in operation from 30 June 2011. https://health.ec.europa.eu/document/download/8d305550-dd22-4dad-8463-2ddb4a1345f1_en?filename=annex11_01-2011_en.pdf (read 26 November 2026)
  15. 15Stakeholders’ Consultation on EudraLex Volume 4, Chapter 4, Annex 11 and New Annex 22, European Commission, open 7 July to 7 October 2025. https://health.ec.europa.eu/consultations/stakeholders-consultation-eudralex-volume-4-good-manufacturing-practice-guidelines-chapter-4-annex_en (read 25 November 2026)
  16. 1621 CFR 211.22, Responsibilities of quality control unit, paragraph (c), eCFR. https://www.ecfr.gov/current/title-21/section-211.22 (read 26 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.