1What changed in the Second Edition.
ISPE published the Second Edition in July 2022, at 404 pages.1 Its own summary says “The overall approach, framework, and key concepts remain unchanged from the first edition.”2 The technical content did change: ISPE adds new guidance on process risk assessment and says concepts of computer software assurance from FDA’s device center are “explored and applied”.2 The rest of its summary goes appendix group by appendix group; the table sets each change against the appendix whose title it matches, with every title changed since ISPE’s 2008 list.2,
| Appendix | Second Edition title | What it now expects |
|---|---|---|
| M1, M7 | Validation Planning; Validation Reporting | Planning and reporting for SaaS and for agile, iterative delivery |
| M2 | Supplier Assessment | Assessment of cloud service providers and of cloud platforms and applications |
| M4 | Categories of Software and Hardware | Categories applied to the components of a system; categories 3 to 5 “viewed as a continuum”; the category “just one factor in a risk-based approach”2 |
| M5 | Design Review and Traceability | Automated, tool-based reviews and verification; automated rather than manual traceability |
| M6 | Supplier Quality Planning, was Supplier Quality and Project Planning | Title change |
| M8 | Project Change and Configuration Management | Agile toolsets for requirement changes, deliverables, DevOps and continuous deployment |
| M9 | Documentation and Information Management, was Document Management | Tool-based, searchable records, kept as the company’s “source of truth”2 |
| M11 | IT Infrastructure, new | Risk-based good practice for infrastructure on site and at IaaS, PaaS and SaaS suppliers |
| M12 | Critical Thinking, new | Experts choose how to specify, test, operate and maintain a system for the business process it supports |
| D1 | Specifying Requirements, was User Requirements Specifications | Requirements written for agile methods and captured with tools |
| D2 | Retired, was Functional Specifications | None |
| D5 | Testing of Computerized Systems | Assurance set by the company’s own risk; testing in any environment counts; exploratory and automated testing encouraged |
| D8 | Agile Software Development, new | Standard agile processes, without duplicate linear V-model activities on top |
| D9 | Software Tools, new | Risk-based use of tools for life cycle, IT and infrastructure processes that do not directly hold GxP records |
| D10, D11 | Distributed Ledger Systems (Blockchain); Artificial Intelligence and Machine Learning (AI/ML), both new | Fitness for use of systems built on these technologies |
| O | Introduction to Operation Appendices, now lettered O | None |
| O1 | Handover | Hypercare, business readiness and support tools in handover |
| O2 | Establishing and Managing Support Services | Service agreements aligned with quality agreements, including contract exit |
| O3 | System Monitoring, was Performance Monitoring | Modern monitoring technologies |
| O4 | Incident Management and Problem Management, was Incident Management | Incident, problem and deviation management related, using IT service management tools |
| O6 | Operational Change and Configuration Management | How the company’s, IT’s and external providers’ change processes relate |
| O7 | Retired, was Repair Activity | None |
| O8 | Periodic Review | Metrics and trends used to judge fitness for intended use |
| O10 | Business Continuity Management | Continuity and disaster recovery linked to incident and problem management; anything as a service |
| O11 | Security Management | IT security practice aligned with standards such as ISO 27001 and NIST |
| S2 | Electronic Production Records | Cloud and blockchain; real-time reports for review by exception; audit trail review for manufacturing systems |
| S3 | End User Applications Including Spreadsheets | More data integrity considerations and risk-based decision recommendations |
| S4 | Patch and Update Management, was Patch Management | Title change |
| S5 | Retired, was Managing Quality within an Outsourced IS/IT Environment | M11 now covers infrastructure at external suppliers |
| G1, G2 | References and Glossary; the 2008 summary of good practice guides is gone | None |
M4 keeps its title but renames the categories. GAMP 4’s “operating systems, firmware, standard software packages, configurable software packages and custom (bespoke) software” became “infrastructure software, tools and IT services, standard system components, configured components and custom applications and components”.5 Category 2, firmware, had already gone in 2008.3 What are the GAMP 5 software categories? explains each and sorts the arguable ones.
2What to update in your procedures.
GAMP 5 is guidance, so adopting the Second Edition is a choice your procedures make.6 If your computer system validation procedure cites GAMP 5, check these points.
| Check | What the procedure should say | Basis |
|---|---|---|
| Categories | Second Edition names; categories applied per component, never used to pick a fixed deliverable list | M4; Section 12.2, quoted by ISPE5 |
| Life cycle | Iterative and incremental delivery allowed, without a duplicate set of V-model documents | D8;2 draft Annex 11, 6.17 |
| Requirements | Kept current through changes, traceable to tests, held in tools where that works | Annex 11, 4.4;8 draft Annex 11, 6.4 and 6.57 |
| Testing | Unscripted and automated testing for lower-risk functions, with what was tested and found recorded; executed scripts for high-risk functions | D5;2 21 CFR 211.68(b);9 draft Annex 11, 9.47 |
| Supplier evidence | Supplier documentation assessed and reused, never in isolation from your configuration and use; audits set by risk | Annex 11, 3.2;8 MHRA, 6.1910 |
| Service providers | Agreements state the provider’s responsibilities, including contract exit | Annex 11, 3.1;8 O22 |
| Infrastructure | Infrastructure and cloud platforms qualified under good IT practice; provider updates assessed for their effect on GxP applications | Annex 11, principle;8 M11 and D911 |
| IT changes | Patches, upgrades and vendor changes made only through change control | Annex 11, 10;8 S44 |
| Incidents | IT incidents and problems linked to deviation management | O42 |
| Periodic review | Draws on incidents, problems, upgrade history, metrics and trends | Annex 11, 11;8 O82 |
The Testing row needs care in the US and the EU. FDA’s computer software assurance guidance, which accepts unscripted testing for functions that are not high process risk, covers “production or the quality management system for medical devices”.12 A drug or biologic maker rests on 21 CFR 211.68(b): “The degree and frequency of input/output verification shall be based on the complexity and reliability of the computer or related system.”9 FDA’s data integrity guidance adds: “Yes, a CGMP workflow, such as creation of an electronic master production and control record (MPCR), is an intended use of a computer system to be checked through validation”.13 Neither rules out unscripted testing. Our judgment: for high-risk functions, such as release calculations and batch record logic, keep executed scripts. They meet draft Annex 11 clause 9.4 (“executed test scripts, and where relevant, screen dumps”),7 and the CSA guidance itself names scripted or hybrid testing as options for more rigor where process risk is high.12 In the EU, the 2011 Annex 11 asks for evidence of “appropriate test methods and test scenarios” (4.7) and never mentions scripts.8 The 2025 draft never mentions unscripted or exploratory testing and asks that qualification and validation follow “approved plans, protocols and test scripts” (9.7), so check the final text before an EU procedure relies on unscripted evidence.7
3Example: gap check of SOP-CSV-001.
This example is invented: Fernmoor Biologics and its procedure SOP-CSV-001, written to the 2008 edition, are illustrative.
| Clause | Says now | Gap | Action | When |
|---|---|---|---|---|
| 4.2 Categories | One category per system sets the deliverables | Categorization “is not intended to provide a checklist approach”5 | Categorize components with current names; scale work by risk | SOP revision; each system at its next review |
| 6.1 Testing | Every test pre-scripted, with screenshots | D5 encourages exploratory and automated testing2 | Unscripted testing for lower-risk functions, recorded; scripts kept for release calculations | Next change to each system |
| 7.3 Cloud suppliers | Questionnaire only | No contract exit; platform updates not assessed2, | Exit terms in agreements; provider updates screened through change control | Contract renewal |
| 9.1 Periodic review | Every three years, checks the validation file | Annex 11 also lists incidents, problems, upgrade history and performance8 | Add incident, problem and change trends to the review template | Next periodic review |
4Do we need to revalidate?
Not because the guide changed: a new edition of an industry guide does not undo validation done under the first. Annex 11 keeps a system validated through controlled change and periodic evaluation “to confirm that they remain in a valid state and are compliant with GMP”.8 The draft Annex 11 gives periodic review the decision on whether “re-validation (complete or in parts) is required”.7 So apply the Second Edition to new systems now, and to existing ones at their next significant change or periodic review, recording the decision there. What does trigger work is change: a supplier release, a platform update or a reconfiguration goes through change control whichever edition your procedure cites.8
5How inspectors approach it.
PIC/S guidance written for inspectors says what they look for: “Inspectors will be interested in the company’s approach to identifying GxP risks and the criteria for assessing the fitness for purpose of the system application.”14 The 2025 draft Annex 11 does not mention GAMP, and FDA’s CSA guidance names the Second Edition only as one industry resource.7,
FDA drug letters cite the regulation instead. In April 2026 FDA wrote to Ava Inc. under 21 CFR 211.68(b):
You also state a software update allowed users to bypass “User-Security Access Restrictions” and that you have disabled the automatic software update function.
FDA called the response inadequate and asked for an independent assessment of each laboratory system’s “qualification/
UK law keeps EU GMP guidelines as they applied at the end of 2020 unless MHRA publishes replacements, so a final revised Annex 11 would not apply there by itself.16 MHRA adds that “the acceptance of vendor-supplied validation data in isolation of system configuration and users intended use is not acceptable”.10
6What has happened since 2022.
| Date | What happened | Status |
|---|---|---|
| 7 Jul to 7 Oct 2025 | The European Commission consulted on a revised Annex 11, a revised Chapter 4 and a new Annex 22 on AI17 | Draft |
| July 2025 | ISPE published its GAMP Guide: Artificial Intelligence, 290 pages, for use alongside the Second Edition18 | Industry guide |
| 2 Feb 2026 | FDA’s Quality Management System Regulation took effect, removing 21 CFR 820.70 and incorporating ISO 13485 by reference12 | Regulation |
| 3 Feb 2026 | FDA reissued its CSA guidance for device production and quality system software under the new regulation12 | Final guidance |
| Q4 2026 | Target of EMA’s GMP/GDP Inspectors Working Group for final Annex 11 and Annex 22 texts19 | Planned |
Until a final text is published and comes into operation, the 2011 Annex 11 applies, and EudraLex still lists that revision.20 CSA compared with CSV and the Annex 11 revision go further.
7What GAMP 5 is.
GAMP stands for Good Automated Manufacturing Practice.6 It began as a supplier guide from the UK’s Pharmaceutical Industry Systems Validation Forum, and the GAMP Forum is now sponsored by ISPE.14 GAMP 4 dates from 2001,14 the first edition of GAMP 5 from 20083 and the Second Edition from 2022.1 ISPE says GAMP “does not define a prescriptive method or a standard”.6 Computer system validation and Part 11 compared with Annex 11 cover the regulations themselves.
8How it runs in Seal.
Seal’s validation and AI assurance guide sets out how it applies GAMP 5, Second Edition. Requirements and specifications, the URS, FS, DS and configuration specification, can be kept as controlled records linked to the configured process and its tests, and assurance is assessed at three boundaries: the managed platform, your configured process, and custom logic and connected systems. Your team owns the intended use, risk acceptance and production approval. For the managed platform, request Seal’s development, verification and release evidence.
The computer system assurance blueprint follows one configured system from intended use and function-level risk through supplier evidence, scripted and exploratory testing, release against a configuration baseline and later change.
AQuestions and answers
Is there a free PDF of GAMP 5 Second Edition?
Not from ISPE, which sells it as a digital edition: on 26 November 2026 its page listed US$540 for members and US$1,125 for non-members, with half off the member price for members in emerging economies. The table of contents is free on ISPE’s site and lists every chapter and appendix.
Is GAMP 5 mandatory?
No. ISPE says GAMP does not define a prescriptive method or a standard. The obligations come from regulations and GMP guidelines such as the US CGMP rules, 21 CFR Part 11 and EU GMP Annex 11, which require systems validated for their intended use; Annex 11 also bases the extent of validation on a documented risk assessment. Following GAMP 5 is one way to meet them, not a requirement in itself.
What does GAMP stand for?
Good Automated Manufacturing Practice. It began as the GAMP Supplier Guide, written by a UK industry forum of pharmaceutical validation specialists; the GAMP Forum is now sponsored by ISPE. The current guide’s full title is GAMP 5: A Risk-Based Approach to Compliant GxP Computerized Systems.
Does GAMP 5 Second Edition still use the V-model?
Its specification and verification approach remains, but ISPE says it is not inherently linear and fully supports iterative and incremental methods. The new agile appendix shows how to use standard agile processes for GxP software and does not advocate adding duplicate V-model activities on top.
What is the difference between GAMP 4 and GAMP 5?
GAMP 4 was published in 2001 and GAMP 5 in 2008. ISPE’s 2008 summary says GAMP 5 widened the life cycle to every phase from concept to retirement, scaled work by risk, complexity and novelty, introduced the process owner, system owner and subject matter expert roles, and leaned on supplier documentation to avoid duplicated work, while staying compatible with GAMP 4’s principles.
References20 sources
References
- 1ISPE GAMP 5 Guide: A Risk-Based Approach to Compliant GxP Computerized Systems, Second Edition, ISPE, July 2022. https:/
/ ispe. org/ publications/ guidance- documents/ gamp- 5- guide- 2nd- edition (read 26 November 2026) - 2What You Need to Know About GAMP 5 Guide, 2nd Edition, Pharmaceutical Engineering, ISPE, January/February 2023, sections on management, development, operation and special interest appendices. https:/
/ ispe. org/ pharmaceutical- engineering/ january- february- 2023/ what- you- need- know- about- gampr- 5- guide- 2nd- edition (read 26 November 2026) - 3GAMP 4 to GAMP 5 Summary, ISPE, 2008, published through Accuris (formerly Techstreet), sections 4 and 5. https:/
/ images. techstreet. com/ direct/ tocs/ ISPE/ ISPE_ GAMP_ 4- 5_ sum. pdf (read 26 November 2026) - 4ISPE GAMP 5 Guide, Second Edition, table of contents, ISPE, 2022. https:/
/ ispe. org/ sites/ default/ files/ publications/ guidance- documents/ 2022- TOC/ ISPE- GAMP5- Ed2_ TOC. pdf (read 26 November 2026) - 5When Is a Category Not a Category?, Pharmaceutical Engineering, ISPE, January/February 2026. https:/
/ ispe. org/ pharmaceutical- engineering/ january- february- 2026/ when- category- not- category (read 26 November 2026) - 6What is GAMP?, ISPE. https:/
/ ispe. org/ initiatives/ regulatory/ what- gamp (read 26 November 2026) - 7Annex 11: Computerised Systems, draft for consultation, European Commission and PIC/S, July 2025, clauses 6.1, 6.4, 6.5, 9.4, 9.7 and 14.1. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 26 November 2026) - 8EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, European Commission, in operation from 30 June 2011, principle and sections 3, 4.4, 4.7, 10 and 11. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 26 November 2026) - 921 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- D/ section- 211. 68 (read 26 November 2026) - 10‘GXP’ Data Integrity Guidance and Definitions, Revision 1, MHRA, March 2018, section 6.19. https:/
/ assets. publishing. service. gov. uk/ media/ 5aa2b9ede5274a3e391e37f3/ MHRA_ GxP_ data_ integrity_ guide_ March_ edited_ Final. pdf (read 26 November 2026) - 11Continuous Operational Control of PaaS in GxP Environments, Pharmaceutical Engineering, ISPE, July/August 2026. https:/
/ ispe. org/ index. php/ pharmaceutical- engineering/ july- august- 2026/ continuous- operational- control- paas- gxp- environments (read 26 November 2026) - 12Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026, sections I, III and V, footnotes 3 and 25, and guidance history. https:/
/ www. fda. gov/ media/ 188844/ download (read 26 November 2026) - 13Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, question 3. https:/
/ www. fda. gov/ media/ 119267/ download (read 26 November 2026) - 14PI 011-3, Good Practices for Computerised Systems in Regulated “GXP” Environments, PIC/S, 25 September 2007, sections 4.7 and 15.2 and references. https:/
/ picscheme. org/ docview/ 3444 (read 26 November 2026) - 15Warning letter 320-26-64 to Ava Inc., MARCS-CMS 721180, FDA, 14 April 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ ava- inc- 721180- 04142026 (read 26 November 2026) - 16The Human Medicines Regulations 2012, regulation C17, legislation.gov.uk. https:/
/ www. legislation. gov. uk/ uksi/ 2012/ 1916/ regulation/ C17 (read 26 November 2026) - 17Stakeholders’ Consultation on EudraLex Volume 4, Good Manufacturing Practice Guidelines: Chapter 4, Annex 11 and New Annex 22, European Commission, July 2025. https:/
/ health. ec. europa. eu/ consultations/ stakeholders- consultation- eudralex- volume- 4- good- manufacturing- practice- guidelines- chapter- 4- annex_ en (read 26 November 2026) - 18ISPE GAMP Guide: Artificial Intelligence, ISPE, July 2025. https:/
/ ispe. org/ publications/ guidance- documents/ gamp- guide- artificial- intelligence (read 26 November 2026) - 19The 3-year work plan for the Inspectors Working Group, January 2026 to December 2028, European Medicines Agency, 2026. https:/
/ www. ema. europa. eu/ en/ documents/ other/ 3- year- work- plan- inspectors- working- group_ en. pdf (read 26 November 2026) - 20EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 26 November 2026)