Skip to main content

What is quality risk management (ICH Q9(R1)), and what changed in the revision?

Quality risk management is a systematic process for assessing, controlling, communicating and reviewing risks to a medicine’s quality across its lifecycle, set out in ICH Q9. Risk is judged on science and patient protection, with effort matched to the risk. The January 2023 revision, Q9(R1), explains formality and risk-based decisions, removes passive risk acceptance, asks companies to manage subjectivity and treats availability risks from quality problems as risks to quality. FDA and the European Commission implemented it in 2023.Checked against its sources on 26 November 2026. Latest change: The WHO entry no longer says draft QAS/26.994 is open for comment: its comment period closed on 15 November 2026, and TRS 981 Annex 2 (2013) remains WHO’s current guideline. How these answers are made

1The quality risk management process, step by step.

StepWhat you doWho, typicallyWhat it leavesQ9(R1)
1. InitiateWrite the risk question and assumptions; gather data; set a timelineLeaderA scoped risk question4.2
2. Hazard identificationAsk “What might go wrong?” from history, theory, informed opinion and stakeholders’ concernsTeamHazards and possible harms4.3
3. Risk analysisEstimate likelihood and severity, and detectability if the tool uses it, as FMEA doesTeamScores, with the evidence4.3
4. Risk evaluationCompare against defined criteria, weighing the strength of evidenceTeamRisks ranked against the acceptance line4.3
5. Risk reductionReduce what exceeds the acceptable level; ask whether controls add new risksControl ownersControls with owners4.4
6. Risk acceptanceDecide case by case whether the residual risk is acceptableDecision makerThe decision and who made it4.4
7. CommunicationShare the outcome with those who act on itDecision makerThe documented output4.5
8. ReviewRevisit when planned or unplanned events could change the resultDecision makerReview triggers and frequency4.6

Q9(R1) sets no durations, only “Specify a timeline” when initiating (4.2).1 The invented example below takes 65 days, 52 of them on the controls.

A hazard is “The potential source of harm”; harm includes “the damage that can occur from loss of product quality or availability”; risk is “The combination of the probability of occurrence of harm and the severity of that harm”.1

2What changed in Q9(R1).

Table 2. Q9 and Q9(R1) side by side.2,1
AreaQ9 (2005)Q9(R1) (2023)
Step name“Risk identification” (4.3, Figure 1)“Hazard identification”, with the same definition: rename it in procedures and forms
Formality“informal” processes can be acceptable5.1: formality “is not a binary concept” but a continuum set by uncertainty, importance and complexity; 5.2: highly structured, less structured and rule-based decisions
Risk acceptance“The decision to accept risk”; could be “a passive decision in which residual risks are not specified”“An informed decision to take a particular risk”; the passive option is deleted, so record who accepted each residual risk
SubjectivityNot named5.3: bias, poorly defined questions and poorly designed scoring scales; 4.1: decision makers make sure it is “managed and minimized”
AvailabilityHarm already included loss of availability6.1: quality and manufacturing issues “are a significant cause of product availability issues”; new Annex II.9 on supply chains
DetectabilityA factor in some toolsDetection controls “can reduce the probability of occurrence of harm”

3Risk assessment template.

Each line traces to Q9(R1) or the PIC/S inspectors’ aide-memoire, PI 038-⁠2 (PI).1,3 The third column is a reading of 5.1, not its words.

FieldWhat to recordAt lower formalityQ9(R1) or PI
Risk questionQuestion, scope and assumptions; why now; the data usedOne line4.2
FormalityLevel chosen and why: uncertainty, importance, complexityOne line5.1
TeamLeader, members by function, any facilitatorNamed owner4.1; PI 2.10
Outsourced partsWho performs and approves each part, client or contractor, under which agreementIf outsourced6.1(c); PI 2.10
ScalesEach severity, probability and detectability level defined; the acceptance lineNot without a tool4.3
Hazards and scoresEach hazard, its harm, its scores and the evidence for eachConclusion in words5.1
Discounted hazardsHazards set aside, with the evidenceOne linePI 2.3
UncertaintyAssumptions and known gapsOne line4.3
ControlsEach measure, owner, due date, any new riskParent record4.4
Residual riskScore after controls; who accepted itAlways4.4
CommunicationWho was told, and howParent record4.5
ReviewReopening events; review frequencyParent record4.6; PI 4.2
VerificationProof each control was implemented as writtenParent recordPI 4.1

4Example: a risk assessment for a second stopper supplier.

Invented throughout, with every name, record, date and value: Tarrowmere, a contract manufacturer (CDMO), fills Pellivane injection for its marketing authorization holder, “the client”.

Table 4. Example. The assessment record.
FieldEntry
Risk questionCan Supplier B’s ready-to-use stoppers be used on Pellivane 10 mg/mL vials without raising the risk to sterility, quality or supply? Assumes Supplier A’s specification.
TriggerSupplier A is the only approved source, and a nine-week delay in 2026 left three weeks of stock.
DataSupplier B’s specification and extractables report.
FormalityHigh: little data (uncertainty), a sterile product’s closure (importance), six functions and a filing (complexity).
TeamQA (leader), manufacturing, microbiology, engineering, regulatory affairs, supply chain. Each scored alone before the team reconciled.
Outsourced partsTarrowmere performed the assessment and owns it. The client’s QA approved the outcome under quality agreement QAG-⁠07. Supplier B gave data only.
Discounted hazardStopper particulates: Supplier B’s washing and limits match Supplier A’s (comparison SC-⁠114).
UncertaintyAt the start, no integrity or leachables data with this vial; where evidence is missing, P takes the higher level.
Not scoredWhether the change needs a variation or supplement: a filing rule, not a risk score.
AcceptanceTarrowmere head of quality, 2 November 2026: two medium residual risks, accepted once every control is verified. The client’s QA countersigned.
CommunicationResidual risks to the client’s QA and qualified person; outcome to the site quality council. The client files the change.
ReviewAfter a year’s leak data and the stability data; on an integrity failure, supplier change notice or stopper complaint; otherwise at annual product review.
Verification5 November: QA confirmed each control in place as written (VAL-⁠118, CCI-⁠31, EXT-⁠22, the stability protocol, the run report, the revised batch record, Supplier B’s approval).
TimelineOpened 1 September 2026; team session 8 September; controls closed 30 October; accepted 2 November; verified 5 November.
Table 5. Example. Risk is S × P: 15 or more is high, 8 to 14 medium, below 8 low. Medium and high need reduction or a justified acceptance.
LevelSeverity (S)Probability (P)
5Possible loss of sterility reaching a patientMore than once a year
4Patient harm from a chemical or physical defectOnce in 1 to 3 years
3Batch rejection or a break in supplyOnce in 3 to 10 years
2A defect caught in-house, no patient or supply effectPossible, not expected in 10 years
1No effect on quality or supplyNot expected in the product’s life, shown by data
Table 6. Example. Scores before and after controls.
HazardBeforeControl, owner, dueEvidence for P afterAfter
Closure integrity loss5 × 3 = 15, highIntegrity validated with Supplier B stoppers, after simulated shipping too; integrity added to stability; leak test of every unit for a year; validation and QC, 30 OctoberCCI-⁠31 passed, shipping included; leak method validated, VAL-⁠118; no shelf-life or commercial data yet5 × 2 = 10, medium, accepted
Different leachables4 × 3 = 12, mediumExtractables comparison; leachables added to stability; QC, 2 OctoberEXT-⁠22: no new compound above threshold; stability data later, as a review trigger4 × 2 = 8, medium, accepted
Poor machinability3 × 3 = 9, mediumTwo engineering runs on the filling line; engineering, 20 OctoberRejects 0.02%, against 0.03% with Supplier A3 × 2 = 6, low
Stopper stock-out3 × 4 = 12, medium, with Supplier A aloneApprove Supplier B and order from both; supply chain, 30 OctoberTwo approved sources at separate plants; both must fail at once3 × 2 = 6, low

P moves only when evidence moves it: scores “should be based on an appropriate use of evidence, science and knowledge”, so on this example’s scale validation or trial data support P = 2 and only commercial data can support P = 1. Risk reduction can also “mitigate the severity”, but S stays fixed here because no control changes the harm itself.1 Leak testing at release would not support P = 2 on its own: Annex 1 wants final containers closed “by appropriately validated methods”, with integrity validation that takes shipping into account (8.21, 8.25).4

Where any part of the work is outsourced, PIC/S wants “adequate involvement and ownership of risk assessments” by the accountable staff (section 2) and “agreements in place” (2.10). In any case, “the residual risk should be communicated to the regulators and customers”;3 Q9(R1) adds that communication “need not be carried out for each and every risk acceptance” and can go “through existing channels”: here, the client’s filing.1

5How formal does a risk assessment need to be?

Q9(R1) 5.1 says the approach to formality “should be described within the quality system”, so a rule like this belongs in your SOP.1

SituationApproachQ9(R1)
Rule already decides itRule-based: apply the SOP or limit, no new assessment5.2
Routine, low importanceLower formality: inside the change, deviation or CAPA record5.1
Important, little doubtLess structured: a simpler approach drawing on existing knowledge5.2
New or complexHigher formality: cross-functional team, recognized tool, stand-alone report5.1, 5.2
Short of time or peopleNot a reason: “Resource constraints should not be used to justify the use of lower levels of formality”5.11
Would excuse a GMP gapStop: it should not justify a practice that would otherwise be unacceptableSection 1; PI 038-⁠2 3.173

6Quality risk management SOP: what it should cover.

Inspectors start by asking whether there is “a high level controlled document describing the company’s policies and approach to QRM” (PI 038-⁠2 1.1).3 Give it these sections:

  1. Purpose and scope: where QRM applies, and how work is scoped, scheduled, authorized and communicated (1.5, 1.7).
  2. Responsibilities: senior management’s commitment and each role (1.3, 1.4).
  3. Method: the tools, the formality rule above, and the scoring scales with their acceptance line (1.10; Q9(R1) 4.3, 5.1, 5.3).1
  4. Training: QRM in GMP training, and what risk assessors learn (1.8, 1.9).
  5. Records and review: how risks are assessed, controlled, communicated and reviewed in management review (1.12).
  6. Effectiveness and change: how QRM is checked, and how the procedure itself changes (1.6, 1.11).

7Where inspectors expect to find it, and what they ask.

PI 038-⁠2 dates from 1 January 2021 and cites Q9, so it asks nothing about subjectivity. It expects “evidence of the implementation of QRM principles” in areas including deviations, out-of-specification results, CAPA, complaints, change control, supplier qualification, validation, outsourcing, calibration, distribution and periodic review (3.4 to 3.16).3

It also checks that proactive assessments come “sufficiently early to allow appropriate risk mitigation” (2.11).3

FDA’s letters test an assessment’s reach, and whether it stands in for a fix:

“Your response is inadequate in that your risk assessment does not extend to all drug products where (b)(4) treatment was attempted …” Medical Products Laboratories, warning letter, 9 April 20265
“These risk assessments are outcome-based, focusing primarily on the absence of complaints or adverse events rather than evaluating the adequacy of your production and inspection controls. … risk assessment is being used as a substitute for corrective action rather than a complement to it.” Pine Pharmaceuticals, an outsourcing facility, warning letter, 7 August 20266

7.1What a pre-approval inspection checks.

CP 7346.832, FDA’s compliance program for pre-approval inspections (issued 29 June 2026), checks risk assessment under three of its objectives:7

  • Objectives 1 and 2, readiness and conformance. Investigators confirm “that quality risk management is used to evaluate proposed changes for potential risks (e.g., hazardous impurities) and their impact on product quality”, and where impurity risks are identified they “Verify that the establishment has conducted a risk assessment for hazardous impurities”.
  • Objective 4, development. They “Determine whether adequate risk assessment activities are included as part of the pharmaceutical development program”, and whether “Management is aware of residual risks”, on the initial inspection, then periodically on risk or after major changes to the quality system, management team or corporate structure.

See pre-approval inspections.

8Is ICH Q9(R1) mandatory, and where does it stand?

Q9(R1) is “not intended to create any new expectations beyond the current regulatory requirements”.1 What binds is the rule around it.

  • US: no, but the statute covers risk. FDA’s edition says it “is not binding on FDA or the public”.8 Since 2012, section 501 of the FD&C Act has said current good manufacturing practice for drugs “includes the implementation of oversight and controls over the manufacture of drugs to ensure quality, including managing the risk of” raw materials, manufacturing materials and finished products.9 21 CFR Part 211 contains neither “risk” nor “hazard”,10 so FDA cites the underlying CGMP failure. CP 7346.832 says a gap against Objective 4 “should not be cited on Form FDA 483 unless the discrepancy or the deficiency can be linked to a CGMP violation”.7
  • EU: the principles, yes. Directive (EU) 2017/1572 tells manufacturers and authorities to “take into account” the detailed guidelines.11 Chapter 1 says “there must be” a quality system “incorporating Good Manufacturing Practice and Quality Risk Management” and states both principles (1.13).12 Volume 4 lists no Annex 20: Part III carries Q9(R1), in effect from 26 July 2023.13,14 A draft Chapter 1, consulted on until 3 December 2025, adds formality, subjectivity and review, and has each site in the supply chain manage, “within its area of responsibility, any manufacturing / quality risks that could impact upon product availability”. The 2013 text stays in force.15,13
  • UK. Regulation 37(2) of the Human Medicines Regulations 2012 makes a manufacturer’s license holder comply with GMP principles and guidelines.16 MHRA lists Q9(R1) as implemented and states no UK difference.17,18
  • PIC/S. PI 038-⁠2 calls Annex 20 “a voluntary standard” and relies mainly on “mandatory articles of Chapter 1 and Annex 15” (4.3).3 PE 009-⁠18, dated 24 September 2026, still points to “Annex 20 or ICHQ9”.19
  • WHO. TRS 981 Annex 2 (2013) is in force;20 draft QAS/26.994 was open for comment until 15 November 2026.21
  • ICH. It records FDA implementing Q9(R1) on 4 May 2023; its Briefing Pack was fully revised in March and April 2026.22,23

9How it runs in Seal.

Seal’s quality risk management blueprint links each scenario and control to its verification and to the complaints and deviations that test it. A failed verification challenges the assessment it concerns while the original observation stays intact, estimates keep their population, observation period and uncertainty, and the residual-risk decision is recorded separately. Distinct templates cover an ICH Q9 risk assessment, a process FMEA, an ISO 14971 risk file and rule-based decisions set as limits in a workflow, with the configured categories and criteria versioned so reviewers can see what an assigned value means. Neil prepares impact assessments and verification cases; your team makes the risk decision.

When you validate Seal itself, the validation and AI assurance guide sets the depth of specification and testing by the risk and complexity of the intended use, and your team owns the intended use, risk acceptance and production approval. Risk sits in Seal’s QMS alongside deviations, CAPA, change control, documents, training, audits, suppliers and complaints.

AQuestions and answers

What risk assessment tools are used in pharma?

ICH Q9(R1) lists basic methods such as flowcharts, check sheets, process maps and fishbone diagrams, then FMEA, FMECA, fault tree analysis, HACCP, HAZOP, preliminary hazard analysis, risk ranking and filtering, and statistical tools such as control charts and Pareto charts. It says no one tool fits every situation and that less formal methods can be acceptable. Choose by the risk question: FMEA for a process you understand step by step, fault tree analysis for the causes of a failure, risk ranking for comparing many different risks.

Is there an ICH Q9(R2)?

No. As of November 2026, ICH lists Q9(R1), adopted in January 2023, as the current version. ICH’s later work has been training material and questions and answers, not a new guideline.

Does ICH Q9 apply to medical devices?

Not directly. Its scope is drug substances, drug products and biological and biotechnological products. For medical devices, the standard is ISO 14971, Application of risk management to medical devices, which Q9(R1) lists among its references.

How often should a quality risk assessment be reviewed?

ICH Q9(R1) ties the frequency to the level of risk rather than setting a period. Write two kinds of review into each assessment: triggers, such as a change, a deviation, a complaint trend, an audit finding or a recall, and a periodic check, for example at the annual product review. PIC/S inspectors look for both routine and triggered review, and a risk register makes them easier to show.

References23 sources

References

  1. 1ICH Q9(R1), Quality Risk Management, ICH, adopted 18 January 2023, with corrections of 26 January 2023 and 15 January 2025. https://database.ich.org/sites/default/files/ICH_Q9%28R1%29_Guideline_Step4_2025_0115_0.pdf (read 26 November 2026)
  2. 2ICH Q9, Quality Risk Management, ICH, 9 November 2005. https://database.ich.org/sites/default/files/Q9%20Guideline.pdf (read 26 November 2026)
  3. 3PI 038-⁠2, Aide-⁠Memoire: Assessment of Quality Risk Management Implementation, PIC/S, 1 January 2021. https://picscheme.org/docview/3823 (read 26 November 2026)
  4. 4EudraLex Volume 4, Annex 1, Manufacture of Sterile Medicinal Products, C(2022) 5938 final, sections 8.21 and 8.25, European Commission, 22 August 2022, fully applicable since 25 August 2024. https://health.ec.europa.eu/document/download/e05af55b-38e9-42bf-8495-194bbf0b9262_en?filename=20220825_gmp-an1_en_0.pdf (read 26 November 2026)
  5. 5Medical Products Laboratories, Inc., warning letter 320-⁠26-⁠61, MARCS-⁠CMS 721916, FDA, 9 April 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/medical-products-laboratories-inc-721916-04092026 (read 26 November 2026)
  6. 6Pine Pharmaceuticals, LLC, warning letter, MARCS-⁠CMS 728537, FDA, 7 August 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/pine-pharmaceuticals-llc-728537-08072026 (read 26 November 2026)
  7. 7Compliance Program 7346.832, Preapproval Inspections, Parts II and III, FDA, issued 29 June 2026. https://www.fda.gov/media/193382/download (read 26 November 2026)
  8. 8Q9(R1) Quality Risk Management, guidance for industry, FDA, May 2023, page 1. https://www.fda.gov/media/167721/download (read 26 November 2026)
  9. 921 U.S.C. 351, Adulterated drugs and devices, concluding provisions inserted by Public Law 112-⁠144, section 711, 9 July 2012, United States Code, 2024 edition, govinfo. https://www.govinfo.gov/content/pkg/USCODE-2024-title21/html/USCODE-2024-title21-chap9-subchapV-partA-sec351.htm (read 26 November 2026)
  10. 1021 CFR Part 211, eCFR, text of 24 November 2026. https://www.ecfr.gov/current/title-21/part-211 (read 26 November 2026)
  11. 11Commission Directive (EU) 2017/1572, Article 3(2), 15 September 2017. https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32017L1572 (read 26 November 2026)
  12. 12EudraLex Volume 4, Part I, Chapter 1, European Commission, in operation from 31 January 2013. https://health.ec.europa.eu/system/files/2016-11/vol4-chap1_2013-01_en_0.pdf (read 26 November 2026)
  13. 13EudraLex Volume 4, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 26 November 2026)
  14. 14ICH guideline Q9 (R1), Step 5, EMA/CHMP/ICH/24235/2006, EMA, in effect from 26 July 2023. https://health.ec.europa.eu/document/download/d77ad692-97ae-4a5f-acfa-e853193ef6aa_en?filename=mp_ich_q9guideline-ra_en.pdf (read 26 November 2026)
  15. 15Stakeholders’ Consultation on EudraLex Volume 4, Chapter 1, with the draft chapter, European Commission, 2025. https://health.ec.europa.eu/consultations/stakeholders-consultation-eudralex-volume-4-good-manufacturing-practice-guidelines-chapter-1_en (read 26 November 2026)
  16. 16The Human Medicines Regulations 2012, regulation 37. https://www.legislation.gov.uk/uksi/2012/1916/regulation/37 (read 26 November 2026)
  17. 17International Council for Harmonisation of Technical Requirements for Pharmaceuticals for Human Use Guidelines, MHRA, updated 5 November 2026. https://www.gov.uk/guidance/international-council-for-harmonisation-of-technical-requirements-for-pharmaceuticals-for-human-use-guidelines (read 26 November 2026)
  18. 18Medicines: good manufacturing practice and good distribution practice, MHRA. https://www.gov.uk/guidance/good-manufacturing-practice-and-good-distribution-practice (read 26 November 2026)
  19. 19PE 009-⁠18, Guide to Good Manufacturing Practice, Part I, Chapter 1, PIC/S, 24 September 2026. https://picscheme.org/docview/11332 (read 26 November 2026)
  20. 20WHO guidelines on quality risk management, TRS 981, Annex 2, WHO, 25 January 2013. https://www.who.int/publications/m/item/trs981-annex2 (read 26 November 2026)
  21. 21WHO guidelines on quality risk management, draft QAS/26.994, WHO, September 2026. https://cdn.who.int/media/docs/default-source/mhp-hps/2026-09-18_qas26_994_qrm_mna.pdf?sfvrsn=be1fb7b9_4 (read 26 November 2026)
  22. 22Quality Guidelines, Q9 implementation status, ICH. https://www.ich.org/page/quality-guidelines (read 26 November 2026)
  23. 23Q9(R1) Briefing Pack, ICH, fully revised March/April 2026. https://ich.org/page/q9r1-briefing-pack (read 26 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.