1Two paragraphs: control, then review and disposition.
Section 820.90, “Nonconforming product”, had two paragraphs. Paragraph (a) read in full:1
“(a) Control of nonconforming product. Each manufacturer shall establish and maintain procedures to control product that does not conform to specified requirements. The procedures shall address the identification, documentation, evaluation, segregation, and disposition of nonconforming product. The evaluation of nonconformance shall include a determination of the need for an investigation and notification of the persons or organizations responsible for the nonconformance. The evaluation and any investigation shall be documented.” 21 CFR 820.90(a), eCFR as of 1 February 20261
Paragraph (b)(1) required procedures “that define the responsibility for review and the authority for the disposition of nonconforming product”, and documented dispositions that “include the justification for use of nonconforming product and the signature of the individual(s) authorizing the use.” Paragraph (b)(2) required rework procedures “to include retesting and reevaluation of the nonconforming product after rework”, with rework and reevaluation, “including a determination of any adverse effect from the rework upon the product”, documented in the device history record (DHR).1
2Steady in paragraph (a), halving in rework.
| Cited as | FDA’s standard citation | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
| 820.90, all paragraphs | All six standard citations | 144 | 145 | 132 |
| Cite 3282 | “Procedures have not been [adequately] established to control product that does not conform to specified requirements.” | 94 | 92 | 95 |
| Cite 3128 | “Products that do not conform to specifications are not adequately controlled.” | 16 | 16 | 18 |
| 820.90(b)(2) | Rework procedures and their records | 26 | 25 | 13 |
| 820.90(b)(1) | Review and disposition procedures | 8 | 12 | 6 |
| Device 483s | The denominator for the rates below | 720 | 672 | 791 |
Section 820.90 was FDA’s fifth most cited device section in FY2023 and FY2024 and its seventh in FY2025, and 820.90(a) was the sixth most cited device reference in FY2025.2 Per 100 device 483s it fell from 20.0 to 16.7 citations: 820.90(a) held at 108 to 113 a year while device 483s rose, and rework citations halved, from 26 to 13.2
3Mostly cited as a procedure.
Almost everything is cited under paragraph (a), and mostly as a procedure. Of FDA’s Data Dashboard’s 103 FY2025 citations of 820.90(a), 71 keep “adequately” in the procedure citation, 17 drop it, and 15 that nonconforming products “are not adequately controlled”.3 Those 103 are fewer than the yearly file’s 113 because the dashboard waits for each inspection’s final classification.3
A citation that keeps “adequately” may be FDA’s text left unedited, so the 71 don’t show that a procedure existed; the 17 that drop it are the ones that say none was established. Paragraph (a) asked the procedure to address identification, documentation, evaluation, segregation and disposition, and the evaluation to decide whether to investigate and whom to notify.1 FDA’s clause 8.3.1 citations, below, name which of those parts failed.
4Clause 8.3 and its four subclauses.
The Quality Management System Regulation (QMSR), which replaced the old Part 820 on 2 February 2026, takes nonconforming product from clause 8.3 of ISO 13485:2016, which it incorporates.4 FDA’s compliance program lists the control of nonconforming product element against 820.10(b)(4) and clauses 8.3.1 to 8.3.4: general controls, product found before delivery, product found after delivery, and rework.5 820.10(b)(4) adds that, for clause 8.3.3 among others, “advisory notices shall be handled in accordance with the requirements of part 806”.4
| Cited as | Subject | FY2025 | FY2026 |
|---|---|---|---|
| 820.90(a) | Nonconforming product, the old paragraph (a) | 103 | 22 |
| ISO 13485 clause 8.3.1 | Nonconforming product, general | 0 | 51 |
| ISO 13485 clause 8.3.4 | Rework | 0 | 7 |
| ISO 13485 clause 8.3.2 | Nonconforming product detected before delivery | 0 | 4 |
| ISO 13485 clause 8.3.3 | Nonconforming product detected after delivery | 0 | 2 |
Only five single ISO 13485 clauses drew more FY2026 citations than clause 8.3.1.3 Each of its 51 citations uses one of four standard texts, with or without “adequately”, and together they split the old general finding into its parts:3
| What the standard citation finds | FY2026 |
|---|---|
| The procedure for controlling nonconforming product, with who is responsible and who decides, not documented or not adequately documented | 24 |
| Records of the nonconformity and what was done about it, with the evaluation, any investigation and the reasons for each decision, not maintained or not adequately maintained | 13 |
| Nonconforming product not evaluated, or not adequately, for whether to investigate and whether to notify an outside party responsible | 7 |
| Nonconforming product not identified and controlled, or not adequately, so it could be used or shipped by mistake | 7 |
The record citation asks more than 820.90’s wording did: the record must give the reason for each decision, not only the evaluation, any investigation and the disposition.3,
5Moving a nonconformance procedure to clause 8.3.
| 820.90 | Clause or section now | Change |
|---|---|---|
| (a) Identify, document, evaluate, segregate, dispose | Clause 8.3.1 | Little; add the rationale for each decision to the record |
| (a) Need for an investigation | Clause 8.3; FDA expects investigation “to the degree commensurate with the significance and risk of the nonconformity”, from a simple one with trend analysis to an in-depth one | Write down what sets the depth, and the trends that require one. FDA’s example, given under process monitoring (clauses 8.2.5 and 8.2.6), is a molding process whose “normal 5 percent rejection rate” rises to 10 percent, which must be investigated |
| (a) Notify those responsible | Clause 8.3.1; FDA describes it as determining “any need to notify an external party responsible for a nonconformity” | Route supplier-caused nonconformities to the supplier, with a record |
| (b)(1) Authority and signed justification for use | Clause 8.3.2, concessions; FDA: allowed only if “justification is provided, approval is obtained and applicable regulatory requirements are met” | Keep the signature: where ISO 13485 says “approved”, FDA reads it as a signature and date. Base the justification on “scientific evidence”, and trend concessions, which FDA says “should be closely monitored and not become accepted practice” |
| (b)(2) Rework, retest, adverse effect, in the DHR | Clause 8.3.4; 820.3 defines rework as action so the product “will fulfill the specified requirements in the medical device file (MDF) before it is released for distribution” | Keep the retest and the adverse-effect determination; record them in the device or batch record (clause 7.5.1), which FDA says largely holds what the DHR did |
| Not in 820.90 | Clause 8.3.3, product found after delivery; 820.10(b)(4) and Part 806 | Add it: an action on distributed product is not rework under FDA’s definition, and goes through corrections and removals |
6One nonconforming lot, from hold to disposition.
Invented for illustration. Receiving inspection of lot L2611, 5,000 polycarbonate luer connectors from a contract molder for an intravenous extension set, finds flash on the thread of 23 of 125 sampled parts, measuring 0.12 to 0.18 mm against a maximum of 0.10 mm.
| Step | Record entry | Clause |
|---|---|---|
| Identify, segregate | Lot L2611 tagged and moved to the hold cage; the molder’s next two lots held at receiving | 8.3.1 |
| Evaluate | Flash on the thread can stop a leak-tight connection; severity serious. Investigation needed: yes. External party responsible: the molder, notified the same day | 8.3.1 |
| Investigate | The molder finds cavity 4’s vent worn; its records show flash rejects climbing from 0.8% to 2.4% of output over the six weeks before this lot, with no limit set to act on them | 8.3.1, 8.4 |
| Disposition | Rework by hand trimming rejected, as it could shed particles into the fluid path. 100% gauge sort: 4,312 pass and are released after a leak test on 125; 688 scrapped | 8.3.2 |
| Rationale | Recorded for each decision, with the gauge study showing the sort finds 0.11 mm flash | 8.3.1 |
| Action | Corrective action requested from the molder: vent repaired, and a 1.5% flash reject limit added to its process monitoring; its evaluation as a supplier updated | 7.4.1, 8.5.2 |
The numbers: 23 ÷ 125 = 18.4% of the sample; 4,312 + 688 = 5,000, so 688 ÷ 5,000 = 13.8% of the lot was scrapped. The molder’s reject rate tripled before this lot, from 0.8% to 2.4%, a larger rise than the doubling FDA’s molding example says must be investigated; a 1.5% limit would have started an investigation more than three weeks earlier, if the rate climbed evenly.6 No concession was made: using a part that fails a requirement for leak-tightness would need a justification on scientific evidence, and there was none.
7What the nonconformance procedure must say.
The procedure needs: who may place and release a hold, the evaluation questions (risk, need to investigate, whom to notify), the dispositions allowed and who may authorize each, the concession rule, rework instructions with retest and adverse-effect check, the route for product found after delivery, and the trigger that turns a trend into a CAPA.1,
- The nonconformance report, with an NCR template in Word and the dispositions allowed.
- Correction vs corrective action, for what the disposition fixes and what it doesn’t.
- 21 CFR 820.100 and clause 8.5.2, when a nonconformity becomes a CAPA.
- Corrections and removals under Part 806, for product found after delivery.
- DHF vs DMR vs DHR under the QMSR, for the device or batch record that holds rework.
8How it runs in Seal.
In Seal’s nonconformance blueprint, the NCMR shares records with inventory, batches, laboratory results and supplier history. An inventory hold flags an issue of the material until disposition, and reviewers see earlier NCMRs for the same supplier, material and specification, with the concession rate over the period, before they decide. Each disposition is a plan with instructions, quantities, owners and completion evidence, and the quantities are reconciled before closure.
Threshold rules you define, such as the third failure of one specification in six months, can escalate to supplier action, specification review or a CAPA. In supplier quality, each SCAR links the issue to the affected lots and products, the containment and the supplier’s response.
AQuestions and answers
What replaced 21 CFR 820.90?
ISO 13485 clause 8.3 and its four subclauses, incorporated by the QMSR from 2 February 2026, with FDA’s own definition of rework in 21 CFR 820.3 and Part 806 for product found after delivery. 820.90 still appears in FY2026’s data because some of that year’s inspections ended before the change.
Is a concession the same as use as is?
A use-as-is disposition accepts nonconforming product by concession. FDA allows it only with a justification, an approval and the applicable regulatory requirements met, expects the justification to rest on scientific evidence, and says concessions should be closely monitored and not become accepted practice.
Is fixing a device after it has shipped rework?
No. FDA’s definition limits rework to action taken before the device is released for distribution. Action on distributed product is a correction or removal, assessed under Part 806 and ISO 13485 clause 8.3.3.
Does every nonconformance need an investigation?
No, but every one needs an evaluation of whether it does, and the decision with its rationale must be recorded. FDA expects the depth of investigation to follow the significance and risk of the nonconformity, from a simple investigation with trend analysis to an in-depth one.
Do disposition records still need a signature?
Yes, in effect. Where ISO 13485 requires a record to be approved, FDA reads approval as a signature and date, and electronic signatures that meet FDA’s requirements count. A concession must be approved.
References6 sources
References
- 121 CFR 820.90, Nonconforming product, eCFR, as in effect on 1 February 2026. https:/
/ www. ecfr. gov/ on/ 2026- 02- 01/ title- 21/ section- 820. 90 (read 26 November 2026) - 2Inspection Observations, FY2023, FY2024 and FY2025 Excel files, Summary and Devices sheets, inspections ending 1 October 2022 to 30 September 2025, FDA, page current as of 16 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- observations (read 26 November 2026) - 3FDA Data Dashboard, Inspections, Citations dataset (entire), downloaded 26 November 2026, inspections ending through 17 November 2026, final classifications only. https:/
/ datadashboard. fda. gov/ oii/ cd/ inspections. htm (read 26 November 2026) - 421 CFR 820.3, Definitions, and 820.10, Requirements for a quality management system, eCFR, current to 24 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820 (read 26 November 2026) - 5Compliance Program 7382.850, Inspection of Medical Device Manufacturers, FDA, implemented 2 February 2026, Attachment A. https:/
/ www. fda. gov/ media/ 80195/ download (read 26 November 2026) - 6Medical Devices; Quality System Regulation Amendments, final rule, 89 FR 7496, effective 2 February 2026, responses to comments 12, 31, 39 and 53, FDA, 2 February 2024. https:/
/ www. federalregister. gov/ documents/ 2024/ 02/ 02/ 2024- 01709/ medical- devices- quality- system- regulation- amendments (read 26 November 2026)