1NCR template.
The layout is yours. Each field is tied to the rule it serves, for drugs (21 CFR 211, EU GMP) and devices (21 CFR 820, which incorporates ISO 13485). Part 211 never uses “nonconformance” or “nonconformity”: it speaks of rejection and of failures to meet specifications, and a drug site’s NCR is the record of those.1
1.1Classify it first.
Critical, major and minor are a site convention, not classes the rules define. EU GMP wants “an appropriate level of root cause analysis”, which “can be determined using Quality Risk Management principles”; FDA wants device nonconformities investigated “to the degree commensurate with the significance and risk”.2,
| Class | Test | Default action | Rule |
|---|---|---|---|
| Critical | Could harm a patient, or affects released product | QA head told that day; released batches scoped; recall and reports assessed; CAPA | 211.192;4 EU GMP 8.155 |
| Major | Fails a specification or validated requirement, contained before release | Hold; investigate to root cause; quality unit disposition; CAPA decision recorded | 211.84(e);6 211.165(f)7 |
| Minor | No plausible effect on quality, such as a crushed outer shipper with intact inner packs | Correct, record and trend | Drugs: EU GMP 1.4(xiv), depth by risk.2 Devices: “a simple investigation, followed by trend analysis”3 |
1.2The record.
Fill it in from the top: the rows follow the order of the work, from the finder’s entries and containment to the quality unit’s signature.
| Field | Who | What to enter | Requirement it serves |
|---|---|---|---|
| Number and source | Finder | Unique number, date and stage: receipt, in process, release or after distribution | 211.192: a written record4 |
| Item | Finder | Material or part code, lot or serial number, quantity, location, supplier | 211.80(d): the lot code “shall be used in recording the disposition of each lot”8 |
| Containment | Finder, at once | Hold, label and segregate; status quarantined | FDA: “identify and/or segregate the product”;9 EU GMP 5.4 and 5.510 |
| Finding | QC | The specification or drawing failed, with its version; the result and its evidence | 211.84(e) and 211.165(f)6, |
| Class and depth | QA | Critical, major or minor, and how deep the investigation goes | EU GMP 1.4(xiv);2 QMSR final rule3 |
| Scope | QA with QC | Other lots, batches and products that share the material or process, released or not | 211.192: “whether or not the batch has already been distributed”4 |
| Investigation and cause | QA with production or QC | Method and depth used; the cause or most likely cause, with its evidence, or why it lies with a supplier | 211.192: “thoroughly investigated”;4 EU GMP 1.4(xiv);2 devices: depth by risk3 |
| Who is told | QA, supplier quality | Supplier; the client or owner, as the quality agreement says; any regulator | FDA quality agreements guidance;11 EU GMP 7.14;12 reports below |
| Disposition | Quality unit | The decision, its justification and who authorised it | 211.22(a);13 ISO 13485 8.3.2 for concessions3 |
| Execution | Warehouse, production | Quantities returned or destroyed, rework record, re-examination result | FDA: “re-examined for conformance”;9 211.11514 |
| CAPA decision | QA | The CAPA or supplier request number, or why none is needed | ICH Q10 3.2.2;15 FDA, on rejects: “CAPAs are implemented where appropriate”16 |
| Approval | Quality unit | Conclusions, follow-up, signature and date | 211.192: “the conclusions and followup”4 |
At a contract manufacturer, two quality units sign: the contract facility for its own results, the owner for the drug “including for final release”. The quality agreement “should explain how the contractor will report manufacturing deviations to the owner”,11 so put the notice time in the quality agreement.
2Example: a completed NCR.
This record is invented: the site, supplier, material, product and numbers are illustrative. It is a drug site, so the Part 211 component rules apply.
| Field | Entry |
|---|---|
| Number and source | NCR-26-0219, Quillmere site, opened 12 October 2026 by QC incoming inspection |
| Item | 20 mm bromobutyl stoppers, part STP-20B, lot CC-5512 from Corvane Closures: 60,000 in 6 cartons, received 9 October, for Veltrazine 10 mg/mL injection, an NDA product |
| Containment | Never released: kept in quarantine, labelled “NCR-26-0219, do not use” and moved to the hold cage on 12 October |
| Finding | Specification SPC-0412 version 4 allows no critical defect. Plan SP-07 draws 500 stoppers from a lot of 35,001 to 150,000 and accepts on zero: 2 had embedded fibres (0.4%), photographed and kept. |
| Class and depth | Major. SPC-0412 grades the fibre a critical defect; the NCR grades the event, and this lot never reached production. It becomes Critical if released vials hold fibres. |
| Scope: CC-5460 | 40,000 in stock: held, 500 resampled under SP-07, no critical defect, hold lifted 15 October |
| Scope: CC-5398 | Used in Batch 26-104, 52,000 vials, released in August. None of the 41 vials rejected at 100% inspection held a fibre when re-examined on 14 October. |
| Scope: Batch 26-104 | Its release sample of 500 vials, taken after 100% inspection, had no particle. 40 reserve vials, examined on 14 October, showed none. |
| Investigation and cause | Fibres embedded in the rubber, so introduced in manufacture, not in handling. Quillmere’s receipt, storage and sampling records checked: cartons sealed on arrival. Cause attributed to Corvane’s process; root cause requested by supplier corrective action request SCAR-26-031 |
| Who is told | Corvane, by SCAR-26-031 on 13 October, with photographs. No field alert: no distributed batch shows a mix-up, contamination, change or a specification failure. |
| Disposition | QA rejected the lot on 13 October under 211.84(e) and approved return to the supplier. Status set to rejected; cartons moved to the rejected cage. |
| Execution | 59,500 stoppers returned on 16 October under RA-7781. Of the 500 sampled, 498 destroyed with a witness and 2 kept as evidence: 59,500 + 498 + 2 = 60,000. |
| CAPA decision | CAPA-26-0093 opened: the third fibre NCR on Corvane stoppers in 12 months, after NCR-25-0588 (November 2025) and NCR-26-0107 (May 2026). Tightened sampling for the next three lots. |
| Approval | Closed by QA on 21 October 2026, nine days after opening. The CAPA and SCAR stay open on their own. |
Two calls to learn from:
- The scope check looked for the defect itself: the rejects, the release sample and the reserves.17 FDA faulted one firm that “inappropriately concluded there was no product impact based on overreliance on passing finished drug product test results”.18
- The CAPA trigger fired late. The site’s threshold, two NCRs for one failure mode from one supplier in 12 months, should have opened a CAPA at the second, so CAPA-26-0093 covers that miss too.
3Which dispositions are allowed.
| Disposition | US drugs | EU drugs | Devices |
|---|---|---|---|
| Reject or return | Required when a component or product fails its specification6, | Return, reprocess or destroy, “approved and recorded by authorised personnel”10 | FDA counts scrap as a correction: it eliminates the nonconformity3 |
| Reprocess or rework | Written procedure, quality unit approval, and the result meets specifications14, | Reprocessing “should be exceptional”10 | Must meet the medical device file before release;19 procedures weigh adverse effects (8.3.4)20 |
| Use as is | Not for a failed specification. Otherwise “with proper authorization” and a justified conclusion9 | Not for a failed registered specification. Annex 16 section 3 is the QP’s route for an unexpected deviation with negligible impact21 | By concession only if “justification is provided, approval is obtained and applicable regulatory requirements are met”3 |
| Regrade | FDA lists use “for another application where the deficiency does not affect the products’ quality”. A failed component is still rejected for the drug9, | Not among Chapter 5’s routes: return, reprocess or destroy10 | A correction under ISO 9000: the item is made to conform to requirements that differ from the original ones22 |
| After distribution | Recall under 21 CFR Part 7, and the reports below9 | Returns destroyed “unless without doubt their quality is satisfactory”; the reports below10 | Not rework: a correction or removal (Part 806), or EU MDR corrective action3, |
When nonconforming product has been distributed, the report depends on the product:
- NDA or ANDA: a field alert “within 3 working days of receipt” of information on a mix-up of the product or its labelling with another article, bacteriological contamination, significant change or deterioration, or a distributed batch failing its application specification.25,
26 - Licensed biologic: a biological product deviation report (Form FDA 3486) within 45 calendar days, for a deviation in distributed product that “may affect the safety, purity, or potency” of it.27
- EU medicine: the manufacturer reports the quality defect to the marketing authorisation holder and “all concerned Competent Authorities” where it may lead to a recall or “an abnormal restriction in the supply”.5
- US device: a correction or removal made to reduce a risk to health, or to remedy a violation that may present one, is reported “within 10-working days of initiating such correction or removal”. One not reported is recorded, with the justification.23 If information reasonably suggests the device may have caused or contributed to a death or serious injury, or has malfunctioned in a way that would be likely to if it recurred, a medical device report is also due within 30 calendar days, or within 5 work days if the event needs remedial action to prevent an unreasonable risk of substantial harm to the public health.28,
29 See corrections and removals. - EU device: the manufacturer must “immediately take the necessary corrective action to bring that device into conformity, to withdraw it or to recall it, as appropriate”, and report a field safety corrective action to the competent authorities “in advance of the field safety corrective action being undertaken”, except in urgency. A serious incident is reported no later than 15 days after the manufacturer becomes aware of it, 10 days for a death or an unanticipated serious deterioration in health and 2 days for a serious public health threat.24
4When an NCR becomes a CAPA.
An NCR deals with the item; a CAPA deals with the cause. FDA’s 2018 CDRH Learn course on CAPA, which predates the QMSR, says “not every nonconformity” goes into CAPA, and asks manufacturers to define “what the threshold is for entering into corrective and preventive actions”.30
| Signal | Open a CAPA when | Source |
|---|---|---|
| Significance | The consequences for quality, safety, efficacy or supply make recurrence matter | FDA 2006, IV.C.49 |
| Trend | A rate rises against its baseline, as in FDA’s example of a 5 percent rejection rate rising to 10 percent, which it says must be investigated | QMSR final rule3 |
| Repeat | One failure mode returns on a material, supplier or process | ICH Q10 3.2.2: trends;15 your threshold30 |
| Concessions | Concessions gather against one requirement | “should be closely monitored and not become accepted practice”3 |
| Supplier cause | A significant or repeat failure is caused by a supplier’s process: the SCAR goes to them, the CAPA stays yours | FDA: “final responsibility”;30 ICH Q10 2.7(c)15 |
Record the decision on the NCR either way. FDA’s 2026 device inspection programme lists, among findings that should lead to an initial Official Action Indicated classification, a failure to analyse data or use current risk information “that results in a decision not to proceed with formal investigations and/or corrective actions”, leading to unmitigated adverse health consequences or nonconformities.31 See what a CAPA is and deviation vs nonconformance.
5What inspectors check, and what they cite.
FDA’s compliance programmes set what investigators cover. The drug programme, 7356.002 (October 2022), lists:16
- Rejects: “Investigation is expanded where warranted; CAPAs are implemented where appropriate”.
- Discrepancy and failure investigations, “investigated in a timely manner using scientific evidence to identify the root cause”, with CAPA effectiveness evaluated.
- Reprocessing and rework: “Evaluation is conducted and approval is documented; impact on validation and stability is assessed”.
- “Quarantine of rejected materials”, and rejection of components “not meeting acceptance requirements”.
The device programme, 7382.850, has applied since 2 February 2026. In a baseline inspection, investigators evaluate Control of Nonconforming Product (820.10(b)(4) and ISO 13485 clauses 8.3.1 to 8.3.4) at minimum, and choose records by product risk: “In most cases, multiple records should be reviewed”.31 Have ready the NCR log with open items and their ages, each reject’s investigation and CAPA decision, rework approvals with their validation and stability assessment, and the status of everything on hold.
Device letters now cite ISO 13485 clauses, here Clause 8.3.4 after an inspection ending 6 March 2026:
“Rework was not documented when nonconforming units were identified.” Linemaster Switch Corporation, warning letter, 27 May 202620
Drug letters cite the same failures under 211.192. One sterile injectables maker had recorded extrinsic contamination, such as hair, at visual inspection at least nine times since May 2022:
“You did not address why your quality unit (QU), your Corporate Expert Circle, and your Corporate Emergency Committee did not reject commercial batches associated with the extrinsic biological contamination and instead released them for distribution to your customers.” Fresenius Kabi USA LLC, warning letter 320-26-129, 22 September 202618
Another cites answering an out-
“Moreover, as a corrective action and preventive action (CAPA), your firm expanded the pH specification range without scientific justification.” Bentley Laboratories LLC, warning letter, 17 September 202632
A widened specification is a change needing quality control unit approval, not a disposition.33
Where teams go wrong:
- Defects classed too low. FDA notes that Fresenius Kabi’s response recognised “a procedural gap in how you classified critical defects such as extrinsic biological contamination”.18
- Procedures that still cite 21 CFR 820.90 or 820.100. Since 2 February 2026, apart from reserved numbers, Part 820 holds only 820.1, 820.3, 820.7, 820.10, 820.35 and 820.45. It incorporates clause 3 of ISO 9000:2015 by name, though ISO has withdrawn that edition and published ISO 9000:2026 in May 2026.19,
34, 35
6How it runs in Seal.
In Seal’s nonconformance blueprint, the NCMR shares records with inventory, batches, laboratory results and supplier history. An inventory hold flags an issue of the material until disposition, and reviewers see earlier NCMRs for the same supplier, material and specification, with the concession rate over the period, before they decide. Each disposition is a plan with instructions, quantities, owners and completion evidence, and the quantities are reconciled before closure.
Threshold rules you define, such as the third failure of one specification in six months, can escalate to supplier action, specification review or a CAPA. In supplier quality, each SCAR links the issue to the affected lots and products, the containment and the supplier’s response.
AQuestions and answers
How do you close a nonconformance report?
Close it when the disposition has been carried out and checked: the quantities returned, destroyed or reworked reconcile with the quantity found, any rework has been re-examined, the CAPA decision and its reason are recorded, and the quality unit has signed the conclusion. A linked CAPA or supplier request can stay open on its own clock.
How should a supplier respond to an NCR from a customer?
Contain your own stock of the same lot and any lots made the same way, investigate the cause, and answer with evidence: the root cause, the actions, their owners and dates, and how you will show they worked. An answer with a blank root cause and a corrective action marked not applicable is the kind FDA has cited in a warning letter.
Who can approve a use-as-is decision?
For devices, whoever your procedure authorises, and only with a justification, which FDA expects to rest on scientific evidence, recorded approval and any regulatory requirement met. For US drugs, the quality unit decides, but a component or product that fails its specification is rejected rather than used as is. In the EU, a Qualified Person may consider certifying a batch after an unexpected deviation of negligible impact, provided registered specifications are met.
Does every NCR need a root cause investigation?
No. Set the depth by the significance and risk of the nonconformity. Some need an in-depth investigation; for others a simple investigation followed by trend analysis is enough. In US drug manufacturing, any unexplained discrepancy or failure to meet a specification must be thoroughly investigated.
How long should an NCR stay open?
Part 211 and EU GMP set no deadline, and FDA’s device rule adds none of its own. FDA’s drug inspection programme does expect discrepancies to be investigated in a timely manner, so open records and their ages get looked at. Set targets by risk in your procedure, and close the NCR when the item is dealt with, not when the CAPA is.
Do pharmaceutical manufacturers use NCRs?
Yes, though the drug CGMP regulations speak of rejected materials and failed specifications rather than nonconformances. The record does the same work: identify and segregate the material, investigate the failure and let the quality unit approve or reject it. The name is the site’s choice; the decisions it records are not.
References35 sources
References
- 121 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, full text searched, eCFR, up to date as of 6 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 10 November 2026) - 2EudraLex Volume 4, Part I, Chapter 1: Pharmaceutical Quality System, European Commission, in operation since 31 January 2013, section 1.4(xiv). https:/
/ health. ec. europa. eu/ document/ download/ e458c423- f564- 4171- b344- 030a461c567f_ en?filename=vol4- chap1_ 2013- 01_ en. pdf (read 10 November 2026) - 3Medical Devices; Quality System Regulation Amendments, final rule, FDA, 89 FR 7496, 2 February 2024, responses to comments 12, 29 and 39. https:/
/ www. govinfo. gov/ content/ pkg/ FR- 2024- 02- 02/ html/ 2024- 01709. htm (read 10 November 2026) - 421 CFR 211.192, Production record review, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 192 (read 10 November 2026) - 5EudraLex Volume 4, Part I, Chapter 8: Complaints, Quality Defects and Product Recalls, European Commission, in operation since 1 March 2015, section 8.15. https:/
/ health. ec. europa. eu/ document/ download/ b1eb2292- cb0d- 4e3f- aea9- e3fe79faf6e3_ en?filename=2014- 08_ gmp_ chap8. pdf (read 10 November 2026) - 621 CFR 211.84, Testing and approval or rejection of components, drug product containers, and closures, paragraph (e), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 84 (read 10 November 2026) - 721 CFR 211.165, Testing and release for distribution, paragraph (f), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 165 (read 10 November 2026) - 821 CFR 211.80, General requirements, paragraph (d), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 80 (read 10 November 2026) - 9Guidance for Industry: Quality Systems Approach to Pharmaceutical CGMP Regulations, FDA, September 2006, section IV.C.4. https:/
/ www. fda. gov/ media/ 71023/ download (read 10 November 2026) - 10EudraLex Volume 4, Part I, Chapter 5: Production, European Commission, in operation since 1 March 2015, sections 5.4, 5.5 and 5.66 to 5.70. https:/
/ health. ec. europa. eu/ document/ download/ 4a1fdb4f- 6f6f- 49c4- b264- 8056e5bbe078_ en?filename=chapter_ 5. pdf (read 10 November 2026) - 11Contract Manufacturing Arrangements for Drugs: Quality Agreements, guidance for industry, FDA, November 2016, sections IV.B and IV.B.1. https:/
/ www. fda. gov/ media/ 86193/ download (read 10 November 2026) - 12EudraLex Volume 4, Part I, Chapter 7: Outsourced Activities, European Commission, in operation since 31 January 2013, section 7.14. https:/
/ health. ec. europa. eu/ document/ download/ 58b5106a- cf6f- 4352- 9dca- 1caf5d27d97e_ en?filename=vol4- chap7_ 2012- 06_ en. pdf (read 10 November 2026) - 1321 CFR 211.22, Responsibilities of quality control unit, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 22 (read 10 November 2026) - 1421 CFR 211.115, Reprocessing, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 115 (read 10 November 2026) - 15ICH Q10, Pharmaceutical Quality System, ICH, 4 June 2008, sections 2.7 and 3.2.2. https:/
/ database. ich. org/ sites/ default/ files/ Q10%20Guideline. pdf (read 10 November 2026) - 16Compliance Program 7356.002, Drug Manufacturing Inspections, FDA, implemented 17 October 2022, quality system and materials system coverage. https:/
/ www. fda. gov/ media/ 75167/ download (read 10 November 2026) - 1721 CFR 211.170, Reserve samples, paragraph (b), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 170 (read 10 November 2026) - 18Fresenius Kabi USA LLC, warning letter 320-26-129, MARCS-CMS 733107, FDA, 22 September 2026, item 1. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ fresenius- kabi- usa- llc- 733107- 09222026 (read 10 November 2026) - 1921 CFR Part 820, Quality Management System Regulation, sections 820.3, 820.7 and 820.10(b)(4), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820 (read 10 November 2026) - 20Linemaster Switch Corporation, warning letter, MARCS-CMS 730215, FDA, 27 May 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ linemaster- switch- corporation- 730215- 05272026 (read 10 November 2026) - 21EudraLex Volume 4, Annex 16: Certification by a Qualified Person and Batch Release, European Commission, in operation since 15 April 2016, section 3. https:/
/ health. ec. europa. eu/ document/ download/ 20c41532- 33d5- 4635- ae80- 8735d3d09fe0_ en?filename=v4_ an16_ 201510_ en. pdf (read 10 November 2026) - 22ISO 9000:2015, Quality management systems: Fundamentals and vocabulary, clauses 3.12.3 (correction) and 3.12.4 (regrade), ISO Online Browsing Platform. https:/
/ www. iso. org/ obp/ ui/ #iso:std:iso:9000:ed- 4:v1:en (read 10 November 2026) - 2321 CFR Part 806, Medical Devices; Reports of Corrections and Removals, sections 806.10(a) and (b) and 806.20, eCFR, up to date as of 6 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 806 (read 10 November 2026) - 24Regulation (EU) 2017/745 on medical devices, Articles 2(68), 10(12), 87(1), 87(3) to (5) and 87(8), EUR-Lex. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ HTML/ ?uri=CELEX:32017R0745 (read 10 November 2026) - 2521 CFR 314.81, Other postmarketing reports, paragraph (b)(1), NDA field alert report, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 314. 81 (read 10 November 2026) - 2621 CFR 314.98, Postmarketing reports, paragraph (b), ANDA reports under 314.81, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 314. 98 (read 10 November 2026) - 2721 CFR 600.14, Reporting of biological product deviations by licensed manufacturers, paragraphs (b) to (d), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 600. 14 (read 10 November 2026) - 2821 CFR 803.50, If I am a manufacturer, what reporting requirements apply to me?, paragraph (a), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 803. 50 (read 10 November 2026) - 2921 CFR 803.53, If I am a manufacturer, in which circumstances must I submit a 5-day report?, paragraph (a), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 803. 53 (read 10 November 2026) - 30Corrective and Preventive Actions, transcript, CDRH Learn, FDA, content current as of 4 January 2018. https:/
/ www. fda. gov/ training- and- continuing- education/ cdrh- learn/ corrective- and- preventive- actions- transcript (read 10 November 2026) - 31Compliance Program 7382.850, Inspection of Medical Device Manufacturers, FDA, implemented 2 February 2026, inspection models, record review, Part V and Attachment A. https:/
/ www. fda. gov/ media/ 80195/ download (read 10 November 2026) - 32Bentley Laboratories LLC, warning letter 320-26-126, MARCS-CMS 732028, FDA, 17 September 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ bentley- laboratories- llc- 732028- 09172026 (read 10 November 2026) - 3321 CFR 211.160, General requirements, paragraph (a), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 160 (read 10 November 2026) - 34ISO 9000:2015, Quality management systems: Fundamentals and vocabulary, ISO, status page marked withdrawn. https:/
/ www. iso. org/ standard/ 45481. html (read 10 November 2026) - 35ISO 9000:2026, Quality management: Fundamentals and vocabulary, edition 5, ISO, published May 2026. https:/