1Purchasing controls in the old Part 820.
Section 820.50, “Purchasing controls”, opened with one sentence that FDA cited more than any of its paragraphs:1
“Each manufacturer shall establish and maintain procedures to ensure that all purchased or otherwise received product and services conform to specified requirements.” 21 CFR 820.50, eCFR as of 1 February 20261
| Paragraph | The regulation’s words |
|---|---|
| (a) | “the requirements, including quality requirements, that must be met by suppliers, contractors, and consultants” |
| (a)(1) | “Evaluate and select potential suppliers, contractors, and consultants on the basis of their ability to meet specified requirements, including quality requirements. The evaluation shall be documented.” |
| (a)(2) | “Define the type and extent of control to be exercised over the product, services, suppliers, contractors, and consultants, based on the evaluation results.” |
| (a)(3) | “Establish and maintain records of acceptable suppliers, contractors, and consultants.” |
| (b) | Purchasing data that “clearly describe or reference the specified requirements”, including, “where possible, an agreement that the suppliers, contractors, and consultants agree to notify the manufacturer of changes in the product or service”, and the data “approved in accordance with § 820.40” |
2Fourth every year, with supplier evaluation fading from the counts.
Purchasing controls were FDA’s fourth most cited device section in each of the last three full fiscal years:2
| Cited as | FDA’s standard citation | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
| 820.50, all paragraphs | All eight standard citations | 196 | 160 | 190 |
| Cite 479 | “Procedures to ensure that all purchased or otherwise received product and services conform to specified requirements have not been [adequately] established.” | 84 | 82 | 115 |
| Cite 486 | “Requirements that must be met by [suppliers] [contractors] [consultants] have not been [adequately] established.” | 31 | 23 | 27 |
| Cite 14720 | “Records of acceptable [suppliers] [contractors] [consultants] have not been [adequately] established.” | 22 | 17 | 23 |
| 820.50(a)(1) | Evaluation and selection of suppliers | 34 | 18 | 6 |
| Cite 3427 | “The type and extent of control to be exercised over [the product] [services] [suppliers] [contractors] [consultants] was not clearly defined.” | 12 | 11 | 10 |
| 820.50(b) | Purchasing data, and agreement to notify of changes | 13 | 9 | 9 |
| Device 483s | All device 483s, the base for each rate | 720 | 672 | 791 |
Per 100 device 483s the section moved from 27.2 to 24.0, but its shape changed. Citations of the opening sentence rose from 84 to 115, from 43% to 61% of the section’s citations, while citations for not evaluating suppliers, paragraph (a)(1), fell from 34 to 6.2
3The opening sentence, contractors and change notices.
More purchasing findings are now filed under the opening sentence and fewer under (a)(1). That says which reference investigators chose, not what they found: the citation ends “Specifically,” and the facts after it can describe a single missing step. Of FDA’s Data Dashboard’s 104 FY2025 citations of the opening sentence, 79 keep “adequately”, which may be the text left unedited, and 25 drop it. The dashboard waits for each inspection’s final classification, so it holds 104 against the yearly file’s 115.3
The standard citations name contractors and consultants as well as suppliers, and investigators tick whichever the facts cover, so a list of approved suppliers that leaves out the test lab or the design consultant is cited the same way. Paragraph (b)’s change-notification agreement is cited on its own: “There is no agreement with [suppliers] [contractors] [consultants] to notify you of changes in the product or service”, 22 times in three years.2
FDA’s compliance program explains why it reads purchasing together with incoming checks: “deficiencies in both purchasing and monitoring and measurement of product can indicate a major deficiency, because adequate control of components and suppliers depends on both activities.” It gives that among its examples of deficiencies that should lead to an initial classification of Official Action Indicated.4
4Clause 7.4, and outsourcing in clause 4.1.5.
Purchasing moved into ISO 13485:2016 when the Quality Management System Regulation (QMSR) replaced the old Part 820 on 2 February 2026.5 FDA’s compliance program puts outsourcing (clause 4.1.5), the purchasing process (7.4.1), and purchasing information and purchased product (7.4.2 and 7.4.3) in one QMS area.4
| Cited as | Subject | FY2025 | FY2026 |
|---|---|---|---|
| 820.50 | The old opening sentence | 104 | 23 |
| ISO 13485 clause 7.4.1 | Purchasing process | 0 | 78 |
| ISO 13485 clause 4.1.5 | Control of outsourced processes | 0 | 38 |
| ISO 13485 clause 7.4.3 | Verification of purchased product | 0 | 28 |
| ISO 13485 clause 7.4.2 | Purchasing information | 0 | 6 |
Clause 7.4.1 is the fourth most cited single clause in FY2026’s classified inspections, and clause 4.1.5 the ninth.3 Their standard citations name what 820.50 left general. At least 17 citations of clause 7.4.1 find no adequate criteria for evaluating and selecting suppliers; 3 of them keep FDA’s full list of bases, from the supplier’s ability and performance to the product’s effect on the device and its risk, which may be the text left unedited. At least 8 find supplier performance not monitored, adequately or at all, and 3 that records of re-evaluation “were not maintained”. In clause 4.1.5, at least 14 find that controls over outsourced processes “do not include written quality agreements” or adequate ones, and 5 that the controls “are not proportionate to the risk involved.” And 4 citations of clause 7.4.3 find incoming verification not set by the supplier’s evaluation and the risk of what it supplies.3
5What a purchasing procedure gains under clause 7.4.
| 820.50 | Under the QMSR | Procedure change |
|---|---|---|
| Opening sentence | Clause 7.4.1 | Re-cite; FDA’s citation now reads “conforms to specified purchasing information” |
| (a)(1) Evaluate and select | Clause 7.4.1 | Write the criteria down: ability, performance, effect on device quality, and risk. FDA says certification “may not provide adequate assurances of supplier quality without further evaluation” |
| (a)(2) Type and extent of control | Clauses 7.4.1, 7.4.3, 4.1.5 | Tie each supplier’s controls and incoming checks to its evaluation and its risk, and record why |
| (a)(3) Acceptable suppliers | Clause 7.4.1 records | Keep the list; add the records of monitoring and re-evaluation |
| Not in 820.50 | Clause 7.4.1 monitoring and re-evaluation | Add performance monitoring and a re-evaluation interval; FDA calls it “a process of continuous evaluation to address products and suppliers” |
| Not in 820.50 | Clause 4.1.5 outsourced processes | Add written quality agreements for outsourced processes such as sterilization and contract assembly |
| Consultants | Clause 7.4.1 | Keep them in scope: FDA says a consultant supplies a service, and the manufacturer must “assess whether the consultant can adequately meet those needs” |
| (b) Purchasing data, change notice | Clause 7.4.2 | 820.50(b) asked for the agreement “where possible”. FDA’s clause 7.4.2 citation is for purchasing information that lacks “a written agreement that the supplier notify your firm of changes in purchased product prior to implementation”, so get it in writing, in the purchase order or the quality agreement, and before the change |
| Supplier audit reports | No longer shielded | 820.180(c)’s exception for supplier audit reports is gone, so FDA can read them; write them to be read |
FDA also answered the manufacturer that tests everything itself: it “must also assess the capability of suppliers to provide acceptable product. Where audits are not practical, this may be done through, among other means, reviewing historical data, monitoring and trending, and inspection and testing.”6 See what FDA can now see in audit reports.
6Three suppliers, three levels of control.
Invented for illustration. A maker of a sterile single-use surgical stapler re-evaluates three suppliers at the end of the year.
| Supplier | Risk | Controls | Year’s performance | Re-evaluation |
|---|---|---|---|---|
| Contract ethylene oxide sterilizer | High: an outsourced process that decides sterility | Written quality agreement; on-site audit every 2 years; each load’s records and biological indicators reviewed before release | 212 loads, no positive indicator, 1 record error caught at review, 0.47% | Approved; audit due in March |
| Molder of the handle housings | Medium: fit and function, checked in assembly | First article approved; dimensional check of 13 parts per lot; certificate of conformance | 48 lots, 2 rejected for short shots, 4.2% against a 2% limit | Approved with conditions: supplier corrective action and tightened inspection for 10 lots |
| Maker of shipping cartons | Low: protects the sealed pouch, no contact with the device | Certificate of conformance; visual check | 30 lots, none rejected | Approved |
The rates: 1 ÷ 212 = 0.47%; 2 ÷ 48 = 4.2%, over twice the molder’s 2% limit. That is what an investigator reading the clause 7.4.1 citations looks for in the file: written criteria, controls matched to risk, performance tracked over the year, and a re-evaluation with its outcome.3
7Writing the purchasing procedure.
The purchasing procedure needs: the evaluation and selection criteria, how risk sets the controls and incoming verification for each supplier, the approved list, how performance is monitored and how often suppliers are re-evaluated, written quality agreements for outsourced processes, purchasing documents with requirements and the change-notification agreement, and when a supplier problem becomes a supplier corrective action. These answers, written for medicines, carry over:
- Supplier qualification, for risk ranking, questionnaires, audits and requalification.
- The quality agreement, with a template in Word.
- Relying on a supplier’s certificate, with a validation record template for reduced incoming testing.
- The nonconformance report, for rejected lots.
8How it runs in Seal.
In Seal’s supplier quality management, each receipt is compared with the recorded qualification scope: the manufacturer, site, material and specification the approval covers. A new site or revised specification becomes linked qualification work, and approvals can carry conditions and expiry. Each supplier corrective action links the issue to the affected lots and products, the containment and the supplier’s response.
Neil, Seal’s AI agent, can check a receipt against the approved supplier scope and prepare an exception-review package; supplier quality decides.
AQuestions and answers
Is 21 CFR 820.50 still applicable?
No. Since 2 February 2026 purchasing has been ISO 13485 clause 7.4 and its subclauses under the QMSR, with control of outsourced processes in clause 4.1.5. FY2026’s data still hold 820.50, mostly from inspections that ended before the change.
Is an ISO 13485 certificate enough to approve a supplier?
Not on its own. FDA said in the QMSR final rule that certification may not provide adequate assurances of supplier quality without further evaluation. Use it as one input with the supplier’s history, its product’s effect on your device and the risk.
Do I need to audit every supplier?
No. The extent of control should follow the supplier’s evaluation and the risk of what it supplies. Where audits are not practical, FDA accepts other means, such as reviewing historical data, monitoring and trending, and inspection and testing.
Does the QMSR define a critical supplier?
No. FDA declined to add the term, saying ISO 13485 already requires quality- and risk-focused continuous evaluation of all purchased products and suppliers. Rank suppliers by risk in your own procedure instead.
Can FDA read our supplier audit reports now?
Yes. The old exception in 21 CFR 820.180(c) that kept supplier audit reports, internal audit reports and management reviews from FDA inspection did not carry into the QMSR.
References6 sources
References
- 121 CFR 820.50, Purchasing controls, eCFR, as in effect on 1 February 2026. https:/
/ www. ecfr. gov/ on/ 2026- 02- 01/ title- 21/ section- 820. 50 (read 26 November 2026) - 2Inspection Observations, FY2023, FY2024 and FY2025 Excel files, Summary and Devices sheets, inspections ending 1 October 2022 to 30 September 2025, FDA, page current as of 16 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- observations (read 26 November 2026) - 3FDA Data Dashboard, Inspections, Citations dataset (entire), downloaded 26 November 2026, inspections ending through 17 November 2026, final classifications only. https:/
/ datadashboard. fda. gov/ oii/ cd/ inspections. htm (read 26 November 2026) - 4Compliance Program 7382.850, Inspection of Medical Device Manufacturers, FDA, implemented 2 February 2026, Part V and Attachment A. https:/
/ www. fda. gov/ media/ 80195/ download (read 26 November 2026) - 521 CFR 820.10, Requirements for a quality management system, eCFR, current to 24 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820/ subpart- A/ section- 820. 10 (read 26 November 2026) - 6Medical Devices; Quality System Regulation Amendments, final rule, 89 FR 7496, effective 2 February 2026, responses to comments 33, 40 and 55, FDA, 2 February 2024. https:/
/ www. federalregister. gov/ documents/ 2024/ 02/ 02/ 2024- 01709/ medical- devices- quality- system- regulation- amendments (read 26 November 2026)