South-site receipt qualification assessment
The receipt matches the approved manufacturer, material and specification but changes North site to South site. Qualification therefore cannot be inferred from the company name alone. Preserve the North-site approval and link the receipt to the unresolved South-site assessment. The review needs evidence covering the actual supply scope, not an overwrite of the existing approval record.
Source evidence and search scope
QUAL-302 (Approved scope); RCV-302 (Receipt); CHG-302 (Supplier change)
QUAL-302 / Approved scope
- Recorded evidence
- Aster Materials; North site; Resin R-01; SP-201 v03
RCV-302 / Receipt
- Recorded evidence
- Aster Materials; South site; Resin R-01; SP-201 v03
CHG-302 / Supplier change
- Recorded evidence
- South-site qualification not yet recorded
Inputs needed for your own records
- Approved qualification and its scope conditions
- Receipt, manufacturer/site identity and supplied specification
- Supplier changes, audit records and unresolved restrictions
Supplier quality determines qualification and material disposition. Approval of one site does not automatically cover another site owned by the same company.
Fictional source snapshots. No live query, assignment or approval.
