What GMP requirements apply to cell and gene therapy manufacturing, from Phase 1 to commercial?

In the US, cell and gene therapies need CGMP at every phase. Phase 1 material is exempt from 21 CFR 211, not the statute; FDA’s 2008 Phase 1 guidance sets expectations. From the first Phase 2 or 3 study, Part 211 applies. Part 1271 tissue-practice rules cover cell products throughout; donor-eligibility rules cover allogeneic ones. The EU and UK apply ATMP GMP guidelines from the first trial batch. Aseptic processing is validated first, the whole process usually before licensure.Checked against its sources on 25 November 2026. Latest change: The new EU pharmaceutical directive is now shown as adopted: Parliament approved the Council’s position at second reading on 25 November 2026, and the act awaits publication in the Official Journal. The timeline and an FAQ had said the vote was still to come. How these answers are made

Illustration of a seal beside a microscope, screening plate and cryovials.

1Which GMP rules apply to your product.

ProductUnited StatesEuropean UnionUnited Kingdom
Modified cells (CAR T)Statutory CGMP at every phase; Part 211 from a Phase 2 or 3 study; Parts 600 to 680; Part 1271 subparts C and D1,2Part IV of EudraLex Volume 4, the 2017 GMP guidelines for advanced therapy medicinal products (ATMPs), trial and authorized alike3,4Part IV, with relevant Part I paragraphs;5 for trials, “across all manufacturing steps as applicable, including from cell banks and vectors onwards”6
In vivo vector (AAV)The same, without Part 1271, which covers products made of human cells or tissues2Part IV for the vector itself; GMP principles for its plasmids, from their bank system (7.36)3,7As for modified cells5,6
Minimally processed cellsPart 1271 alone if every section 361 criterion is met; see 361 vs 3512Part IV if it is an ATMP; transplant premises validated to comparable standards need not be revalidated (2.45)3Part IV if it is an ATMP;5 cell donation, procurement and testing under the Human Tissue (Quality and Safety for Human Application) Regulations 20078
Decentralized sitesThe IND sponsor confirms each site follows CGMP and shows comparability against a reference site9An EU central site oversees batch certification at each decentralized site, Part IV 11.44 to 11.513A point-of-care or modular license naming a control site, and a master file for each product10

1.1When the US Phase 1 exemption ends.

21 CFR 210.2(c) exempts a Phase 1 drug from Part 211, not from CGMP: it “is subject to the statutory requirements set forth in 21 U.S.C. 351(a)(2)(B)”. The exemption follows the drug, not the batch: once it “has been made available for use by or for the sponsor in a phase 2 or phase 3 study”, material for a continuing Phase 1 study must comply with Part 211 too.1 FDA’s May 2026 guidance says the exemption “generally applies to studies that are designed to establish basic safety, rather than the efficacy of the drug product”.11 A seamless Phase 1/2 study must make its Phase 2 lots under Part 211, and should not assume the exemption for a cohort designed to show efficacy.

2Phase-by-phase GMP checklist.

AreaPhase 1Phase 2 and 3License application
Materials, USWritten controls and acceptance criteria; certificates checked12Each lot tested or examined, then released, 211.8413As for Phase 2 and 3
Materials, EUResearch grade only if no pharmaceutical grade exists, with its risks understood; critical specifications agreed with suppliers where possible (7.13, 7.14)3As for Phase 1Critical specifications agreed with suppliers (7.14)3
Aseptic, USISO 5 workstation, media simulation, monitoring during processing12Three initial media fills per line, then one every six months; everyone authorized to enter takes part yearly14As for Phase 2 and 3
Aseptic, EUThree simulations, then at least one every six months, or one just before the next batch if batches are further apart (9.61 to 9.63)3As for Phase 1As for Phase 1
Equipment, USSetting assessed for hazards; equipment maintained and calibrated by written procedure12Design, construction, cleaning and calibration, 211.63 to 211.6813As for Phase 2 and 3
Equipment, EUAir quality verified to ISO 14644; critical equipment qualified3As for Phase 1Qualification scoped by documented risk assessment3
Cleaning, USWritten procedures12Validated, room and equipment, 211.42(c)(10)(v)13,15As for Phase 2 and 3
Cleaning, EUVerification acceptable (10.35)3As for Phase 1Validated, usually three batches; reduced or none if only disposables (10.33)3
Process, USCharacterized, not validated11Characterized, not validated11Process performance qualification (PPQ), with the number of batches justified11
Process, EUMonitored, not validated3Data showing consistent production3Generally three consecutive batches3
Changes, USEach change recorded with its rationale and risk assessed12,11Risk assessment for every change; limited comparability data for minor ones11As for Phase 2 and 3
Changes, EUPlanned changes assessed and approved first; substantial modifications authorized (1.24, 6.19)3As for Phase 1Variations after approval (6.19)3
Methods, USSafety tests suitable; gene therapy dose assay qualified16Release tests qualified before a pivotal study16Release tests validated16
Methods, EUSterility and other safety assays validated3Suitability shown; potency, release and stability methods validated for pivotal trials3All validated3
Specifications, USPermissive if safety is not compromised11Predefined criteria; interim ones acceptable11,16Proposed commercial criteria16
Specifications, EUDetail suited to the stage, enough to identify each batch’s characteristics (6.21)3Re-assessed as data accumulate (6.18)3As in the marketing authorization (6.16)3
Stability, USCovers the planned use; engineering or similar lots stored the same way, if justified16Written program, 211.16613Three commercial-facility lots, six months real time, or justified11
Release, USReleased by someone independent of manufacturing where possible; periodic reviews where each patient has a batch12Quality control unit approves or rejects every batch, 211.2213As for Phase 2 and 3
Release, EUA qualified person (QP) certifies every batch (11.11)3As for Phase 1As for Phase 1
Documents, USRecords enough to replicate the process, with changes and deviations12Master and batch production records, 211.186, 211.18813As for Phase 2 and 3
Documents, EUFormality to suit the stage; full traceability3More comprehensive as development advances3A site master file for each site3
Samples, USOne per batch, or a recorded justification12Part 211 reserve samples136 months past expiry; exceptions for patient-specific lots17,11
Samples, EURetention unit one year past expiry, none for autologous; reference sample for two full tests where feasible (12.18, 12.27)3As for Phase 1As for Phase 1

3Example: a Phase 1 to Phase 2 gap assessment.

This example is invented. Site M2 makes an autologous CAR T for US and EU trials. Its last Phase 1 lot, Batch 26-⁠014, was made on 2 March 2026. The next lot, planned for 8 September 2026, will supply a new Phase 2 study, and Phase 1 cohort 3 is still dosing.

AreaAt Batch 26-⁠014Needed from the next lotActionRule
ScopeExempt from Part 211Part 211 for every lot, cohort 3 includedQA review against Part 211210.2(c)1
Air monitoringParticles and settle plates in each open stepActive air sampling too, in every open stepAdd it to the batch record211.42(c)(10)(iv), 211.113(b);13,15 FDA 2004 X.A.414
CleaningWritten procedure; each batch verifiedUS: validated cleaning and disinfection; EU: verification still enoughValidation study, with disinfectant efficacy results211.42(c)(10)(v);13,15 Part IV 10.353
Media fillThree initial runs, January 2026The six-monthly run, due in JulyRun it in JulyFDA 2004 IX.A.2;14 Part IV 9.62, 9.633
Visual inspectionDone, not written downWritten procedure for 100% inspectionWrite it and train211.100(a)13,15
Potency assayQualifiedValidated before a pivotal trialApprove a validation protocolPart IV 10.503
ProcessNot validatedStill not validated; consistency dataTrend parameters by lotPart IV 10.46, 10.473
  • The July media fill. 2 March to 8 September is six months and six days, so an EU-only site could run the simulation just before the next batch, with results in before production starts (Part IV 9.63).3 FDA’s guidance expects “routine semi-annual qualification conducted for each processing line”,14 so for a US Phase 2 lot M2 runs in July or records why not.

4Where GMP starts for plasmid, vector and cells.

MaterialEU and PIC/SUnited States
PlasmidGMP principles mandatory, but no GMP certificate: the ATMP manufacturer verifies them (EMA/246400/2021);7 PIC/S lets requirements vary by step (Annex 2A Figure 3)18A vector itself when modified to transfer genetic material (CAR T III.B);9 a plasmid used to make a vector is a qualified intermediate with a certificate of analysis in the IND, usually from a bacterial master cell bank, which early ex vivo use may not need (GT CMC V.A.2)19
Vector and its banksAs a CAR T starting material, GMP principles from its bank system (Part IV 7.36); as an in vivo product’s active substance, Part IV in full, with banks established under GMP (8.11)3,7For CAR T, characterized before clinical studies, under CGMP for later phases and licensure, sites inspected in BLA review (IV.A);9 for an in vivo product the vector is the drug, so statutory CGMP applies from Phase 1 (210.2(c))1
Patient cellsDonation, procurement and testing follow tissues and cells law, not GMP (Part IV 7.22)3,7Handling and shipping procedures at every collection site; allogeneic donor eligibility under Part 1271; shipping validated by licensure (IV.B)9

5Preparing for the pre-license inspection.

A US license is issued “only after inspection of the establishment(s) listed in the biologics license application”.20 CBER’s compliance program says Form 483 findings “should be resolved prior to the approval”.21

Table 5. CP 7345.848 Attachment 6 objectives, with FDA’s PPQ expectations.21,16,11
Inspectors willHave ready
Check data and historyThe lot-by-lot manufacturing history and source data behind the submission
Watch the processExecuted batch records matching the CMC description, and a run to observe
Review validationPPQ at commercial scale, not a scaled-down model, number set by risk assessment; method validation
Look for unfiled changesEvery facility and process change since filing, with its assessment
Review lots, stabilityLots that met and failed specification, OOS investigations closed; stability data against specifications
Check areas, materialsQualification of new areas, equipment and utilities; raw material and component test records
Check the quality systemThe new product inside change control, deviations, CAPA and training
Review shippingShipping validation for drug substance and drug product
Check reportingProcedures for deviation reports (600.14) and adverse experience reports (600.80)

At Juno Therapeutics’ October 2020 pre-license inspection for Breyanzi in Bothell, Washington, FDA cited deviations classed “NOE only” (notice of event), which under Juno’s procedure meant no further investigation:22,23,24

“This Event was classified NOE only since there was no impact to product quality. However, the Description section of this deviation stated the potential impact from out of tolerance pipettes would result in invalid test results and failure to meet assay and sample acceptance criteria.”

In July 2025, investigators recorded that Celgene’s Summit, New Jersey, site, which also makes Breyanzi, had “canceled 458 deviations” since June 2023.25 Both are events closed without the thorough investigation 211.192 requires, so check that every event closed as no impact, canceled or downgraded has a recorded rationale.13

6What inspectors cited at clinical-stage sites.

FDA inspected CARsgen Therapeutics’ Durham, North Carolina, facility from 28 November to 6 December 2023. Its two autologous CAR T products had been made available for a Phase 2 study, so Part 211 applied. The warning letter of 26 July 2024 cites:15

“Non-viable particulate monitoring is not being conducted during open manufacturing manipulations within the Grade (b)(4) utilized as the aseptic processing area for production of Humanized Anti-claudin 18.2 Autologous CAR T Cells (CT041).”

The letter also cites no active air sampling during open manipulations, no 100% visual inspection procedure, no cleaning validation (the firm promised a disinfectant efficacy study but “failed to provide any results”), and CAPAs for personnel monitoring excursions that “were proposed but never implemented”.15

In the EU, the Dutch inspectorate’s non-compliance statement of 7 October 2026 for the Antoni van Leeuwenhoek hospital pharmacy in Amsterdam, which makes investigational ATMPs, records one critical deficiency:26

“An Advanced Therapy Medicinal Product (ATMP) was released despite a failed sterility test which was performed as an in-process control.”

Major deficiencies included an incomplete contamination control strategy, inadequate aseptic process simulation and “multiple microbial exceedances on the hands of the operators in class A handling the ATMP product”; the site’s GMP certificates were withdrawn.26

7Judgment calls and common gaps.

  • Contract manufacturing. For cell products, Part 1271 requires a compliance check before contracting, and ending the contract if the contractor falls out of compliance (1271.150(c)).2 What FDA and Part IV expect of the contract giver is in quality agreements.
  • Release before sterility results. FDA’s Phase 1 guidance accepts release of a short-lived cellular product on rapid tests, such as a negative Gram stain and endotoxin test, while sterility is pending; a positive result means an investigation and notice to the trial’s responsible person.12 The EU allows initial and final QP certification, with a written procedure for results out of specification after release.3
  • Closed systems. Part IV accepts a grade D background for a closed system, which “can no longer be considered closed” if material is added or withdrawn without an aseptic connection.3 PIC/S Annex 2A ties grade D to showing the system can “remain integral throughout the entire usage” (3.13),18 so for PIC/S markets keep integrity evidence for each use.

8What changed in 2024 to 2026, and what is still draft.

DateChangeStatus
July 2023FDA draft on manufacturing changes and comparability for CGT productsStill draft27
January 2024FDA guidance on developing CAR T cell productsFinal9,27
8 May to 8 July 2025EMA consults on revising Part IV to align it with Annex 1Draft planned for September 2026; none published by 25 November 202628,29,30
1 July 2025EMA guideline on investigational ATMPs, with Part IV GMP “a prerequisite” for trialsIn effect4
23 July 2025UK point-of-care and modular manufacture licenses, SI 2025 No. 87In force10
May 2026FDA CMC flexibilities for CGT products heading for a BLAFinal, for immediate implementation11
August 2026FDA FAQs on developing CGT products, drafted November 2024Final16
28 September 2026Council position on the new EU pharmaceutical directive, adding yearly reporting for hospital-exemption ATMPsAdopted: Parliament approved the Council position at second reading on 25 November 2026; awaiting publication in the Official Journal31,32,33
November 2026FDA potency assurance guidance, replacing the 2011 potency test guidanceFinal34
7 August 2027Regulation (EU) 2024/1938 on substances of human origin replaces the blood and the tissues and cells directives for donation, procurement and testingAdopted, applies from that date35

9How it runs in Seal.

Seal’s cell and gene therapy blueprint keeps patient or donor identity, material genealogy, process versions and release evidence in one record. A mismatched scan is flagged on the record, the batch record branches on what the cells do, and QA reviews while the batch runs. As the process moves from early studies to routine production, each change becomes the next version of the workflow, assessed for its intended use and released under change control, while lots already made keep the basis they were made on. Neil, Seal’s AI agent, drafts receipt and handoff checks, exception paths and process revisions, and your team verifies and releases each change.

For autologous therapies, a treatment order creates one governed case that carries chain of identity and custody, the batch record, testing, quality events and release. For allogeneic therapies, donor-to-dose genealogy lets a source concern trace forward to every dose and recipient. For viral vectors, plasmids and cells converge at production, and each result attaches to the pool or filled lot it describes.

AQuestions and answers

Can an out-of-specification CAR T product still be given to the patient?

Sometimes, under strict conditions. In the EU, Part IV lets the manufacturer supply an out-of-specification cell-based ATMP when the treating physician asks for it to avoid an immediate significant hazard to the patient. The manufacturer gives the physician its risk evaluation, records the physician’s acceptance and notifies the sponsor or, for a marketed product, the marketing authorization holder and the supervisory authority. In the US, Part 211 requires a lot that fails its specifications to be rejected, so it cannot go out as the licensed product; Kite’s expanded access protocol for axicabtagene ciloleucel, for example, takes such a lot when it meets Kite’s clinical trial release criteria, repeat leukapheresis is not feasible and there is no satisfactory alternative. Either way, the failure is investigated.

Does EU GMP Annex 1 apply to ATMPs?

Not directly. Part IV, the EU GMP guidelines for ATMPs, says the other Volume 4 documents apply only where it refers to them, and it refers to Annex 1 for sterilization methods. The revision of Part IV that EMA started in 2025 is meant to align it with Annex 1, so plan for a contamination control strategy and Annex 1 thinking on barriers and closed systems now.

Do products regulated under section 361 have to follow Part 211?

No. A human cell or tissue product that meets all the section 361 criteria, such as minimal manipulation and homologous use, is regulated under Part 1271: registration and listing, donor eligibility and current good tissue practice. Part 211 applies when the product does not meet those criteria and is regulated as a drug or biologic.

How long must ATMP batch and traceability records be kept?

Under the EU ATMP guidelines, batch documentation is kept for one year after the batch expires or five years after Qualified Person certification, whichever is longer. For trial products, it is five years after the last clinical trial that used the batch ends. Traceability data, including the donation and internal codes, are kept for at least 30 years after expiry.

Does every manufacturing change need a comparability study?

No, but in the US every change should have a risk assessment. FDA’s May 2026 guidance, which is final, recommends one for each manufacturing change and may accept limited comparability data for a minor, low-risk change to an investigational product. FDA’s 2023 draft on comparability recommends a comparability study when the assessment shows the change could harm quality. The evaluation expected grows as the product moves toward licensure, so plan major changes before pivotal batches.

Does the hospital exemption mean an ATMP can be made without GMP?

No. In the EU, an ATMP prepared on a non-routine basis and used in a hospital in the same Member State, to meet one patient’s individual prescription, falls outside the medicines directive, but its manufacture must be authorized by the national authority. The EU GMP guidelines for ATMPs say these products must be made to quality standards equivalent to those for authorized ATMPs, and national traceability and pharmacovigilance rules must be equivalent too. The new EU pharmaceutical directive, adopted on 25 November 2026 and awaiting publication, keeps the exemption and adds yearly reporting of use, safety and efficacy data.

References35 sources

References

  1. 121 CFR 210.1 and 210.2, Status and applicability of current good manufacturing practice regulations, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-210 (read 25 November 2026)
  2. 221 CFR Part 1271, sections 1271.1, 1271.3(d), 1271.10(a) and 1271.150(c), eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-L/part-1271 (read 25 November 2026)
  3. 3EudraLex Volume 4, Part IV, Guidelines on Good Manufacturing Practice specific to Advanced Therapy Medicinal Products, sections 1, 2.3, 4.3, 6, 7.13, 7.14, 7.22, 7.36, 8.11 to 8.17, 9.5, 9.41 to 9.44, 9.61 to 9.63, 10, 11.11, 11.3, 12.18, 12.27 and 16, European Commission, 22 November 2017. https://health.ec.europa.eu/document/download/ad33d9dd-03f0-4bef-af53-21308ce2187d_en?filename=2017_11_22_guidelines_gmp_for_atmps.pdf (read 25 November 2026)
  4. 4Guideline on quality, non-clinical and clinical requirements for investigational advanced therapy medicinal products in clinical trials, EMA/CAT/22473/2025, cover page and section 3, EMA, adopted by CHMP 20 January 2025, in effect from 1 July 2025. https://www.ema.europa.eu/en/documents/scientific-guideline/guideline-quality-non-clinical-clinical-requirements-investigational-advanced-therapy-medicinal-products-clinical-trials_en.pdf (read 25 November 2026)
  5. 5Freedom of Information request FOI 22/1125, on Part IV GMP guidelines for ATMPs, MHRA, response of 4 December 2022, published 17 January 2024. https://www.gov.uk/government/publications/freedom-of-information-responses-from-the-mhra-week-commencing-28-november-2022/freedom-of-information-request-foi-221125 (read 25 November 2026)
  6. 6Manufacture of Investigational Medicinal Products: Frequently Asked Questions, MHRA Inspectorate, 3 February 2023. https://mhrainspectorate.blog.gov.uk/2023/02/03/manufacture-of-investigational-medicinal-products-frequently-asked-questions/ (read 25 November 2026)
  7. 7Questions and answers on the principles of GMP for the manufacturing of starting materials of biological origin used to transfer genetic material for the manufacturing of ATMPs, EMA/246400/2021, European Medicines Agency, 24 February 2021. https://www.ema.europa.eu/en/documents/other/questions-and-answers-principles-gmp-manufacturing-starting-materials-biological-origin-used-transfer-genetic-material-manufacturing-atmps_en.pdf (read 25 November 2026)
  8. 8Advanced therapy medicinal products: regulation and licensing in UK, section 10, MHRA, updated 11 September 2026. https://www.gov.uk/guidance/advanced-therapy-medicinal-products-regulation-and-licensing (read 25 November 2026)
  9. 9Considerations for the Development of Chimeric Antigen Receptor (CAR) T Cell Products, guidance for industry, sections III.B, IV.A, IV.B and IV.E, FDA, January 2024. https://www.fda.gov/media/156896/download (read 25 November 2026)
  10. 10Human medicines Modular Manufacture and Point of Care regulations 2025: Overview, MHRA, 10 June 2025. https://www.gov.uk/government/publications/human-medicines-modular-manufacture-and-point-of-care-regulations-2025-overview/human-medicines-modular-manufacture-and-point-of-care-regulations-2025-overview (read 25 November 2026)
  11. 11Chemistry, Manufacturing, and Controls Flexibilities for Developing Human Cellular and Gene Therapy Products for a Biologics License Application, guidance for industry, sections III.A to III.D, FDA, May 2026. https://www.fda.gov/media/192321/download (read 25 November 2026)
  12. 12Guidance for Industry: CGMP for Phase 1 Investigational Drugs, sections III to VI, FDA, July 2008. https://www.fda.gov/media/70975/download (read 25 November 2026)
  13. 1321 CFR Part 211, sections 211.22, 211.42(c)(10), 211.63 to 211.68, 211.84, 211.100(a), 211.113(b), 211.166, 211.170, 211.186, 211.188 and 211.192, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211 (read 25 November 2026)
  14. 14Guidance for Industry: Sterile Drug Products Produced by Aseptic Processing, Current Good Manufacturing Practice, sections IX.A.2 and X.A.4, FDA, September 2004. https://www.fda.gov/media/71026/download (read 25 November 2026)
  15. 15Warning letter to CARsgen Therapeutics Corporation, CBER 24-⁠686504, FDA, 26 July 2024. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/carsgen-therapeutics-corporation-686504-07262024 (read 25 November 2026)
  16. 16Frequently Asked Questions: Developing Potential Cellular and Gene Therapy Products, guidance for industry, questions 13, 15, 16, 17, 19 and 20, FDA, August 2026. https://www.fda.gov/media/183631/download (read 25 November 2026)
  17. 1721 CFR 600.13, Retention samples, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-F/part-600/subpart-B/section-600.13 (read 25 November 2026)
  18. 18PIC/S GMP Guide PE 009-⁠18, Annexes, Annex 2A: Manufacture of advanced therapy medicinal products for human use, Figure 3 and section 3.13, PIC/S, 24 September 2026. https://picscheme.org/docview/11333 (read 25 November 2026)
  19. 19Chemistry, Manufacturing, and Control (CMC) Information for Human Gene Therapy Investigational New Drug Applications (INDs), guidance for industry, sections V.A.2.c and V.A.2.d, FDA, January 2020. https://www.fda.gov/media/113760/download (read 25 November 2026)
  20. 2021 CFR 601.20(d), Biologics licenses; issuance and conditions, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-F/part-601/subpart-C/section-601.20 (read 25 November 2026)
  21. 21Compliance Program 7345.848, Inspection of Biological Drug Products (CBER), Attachment 6, Pre-⁠License and Pre-⁠Approval Inspections, FDA, implemented 1 October 2010. https://www.fda.gov/media/73834/download (read 25 November 2026)
  22. 22Form FDA 483, Juno Therapeutics, Inc., Bothell, Washington, observation 2, FDA, 16 October 2020. https://www.fda.gov/media/144142/download (read 25 November 2026)
  23. 23Juno Therapeutics, response to the FDA Form 483 observations for JCAR017 (lisocabtagene maraleucel), 5 November 2020, published by FDA. https://www.fda.gov/media/145363/download (read 25 November 2026)
  24. 24Approved Cellular and Gene Therapy Products, FDA, content current as of 30 October 2026. https://www.fda.gov/vaccines-blood-biologics/cellular-gene-therapy-products/approved-cellular-and-gene-therapy-products (read 25 November 2026)
  25. 25Form FDA 483, Celgene Corporation, Summit, New Jersey, observation 4, FDA, 18 July 2025. https://www.fda.gov/media/192234/download (read 25 November 2026)
  26. 26Statement of non-compliance with GMP, report NL/H 26/2008484D, Het Nederlands Kanker Instituut-⁠Antoni van Leeuwenhoek Ziekenhuis Stichting, Plesmanlaan 121, Amsterdam, Health and Youth Care Inspectorate (Netherlands), inspections 10 to 12 February and 22 to 23 April 2026, issued 7 October 2026, EudraGMDP document 187964. https://eudragmdp.ema.europa.eu/inspections/gmpc/prepReviewSubmittedGMPC.do?key=187964 (read 25 November 2026)
  27. 27Cellular and Gene Therapy Guidances, FDA, content current as of 2 November 2026. https://www.fda.gov/vaccines-blood-biologics/biologics-guidances/cellular-gene-therapy-guidances (read 25 November 2026)
  28. 28Concept paper on the revision of Part IV Guidelines on Good Manufacturing Practice specific to Advanced Therapy Medicinal Products, EMA/INS/GMP/48771/2025, section 4, EMA, 11 March 2025. https://www.ema.europa.eu/en/documents/scientific-guideline/concept-paper-revision-part-iv-guidelines-good-manufacturing-practice-specific-advanced-therapy-medicinal-products_en.pdf (read 25 November 2026)
  29. 29Good Manufacturing Practice (GMP) / Good Distribution Practice (GDP) Inspectors Working Group, EMA. https://www.ema.europa.eu/en/human-regulatory-overview/research-development/compliance-research-development/good-manufacturing-practice/good-manufacturing-practice-gmp-good-distribution-practice-gdp-inspectors-working-group (read 25 November 2026)
  30. 30EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 25 November 2026)
  31. 31Position of the Council at first reading with a view to the adoption of a Directive on the Union code relating to medicinal products for human use, 7106/2/26 REV 2, recital 24 and Article 3, Council of the European Union, adopted 28 September 2026. https://data.consilium.europa.eu/doc/document/ST-7106-2026-REV-2/en/pdf (read 25 November 2026)
  32. 32Procedure file 2023/0132(COD), Medicinal products for human use, Legislative Observatory, European Parliament. https://oeil.secure.europarl.europa.eu/oeil/en/procedure-file?reference=2023/0132(COD) (read 25 November 2026)
  33. 33European Parliament legislative resolution of 25 November 2026 on the Council position at first reading with a view to the adoption of a directive on the Union code relating to medicinal products for human use, P10_TA(2026)0392, European Parliament, 25 November 2026. https://www.europarl.europa.eu/doceo/document/TA-10-2026-0392_EN.html (read 25 November 2026)
  34. 34Potency Assurance for Cellular and Gene Therapy Products, guidance for industry, FDA, November 2026. https://www.fda.gov/regulatory-information/search-fda-guidance-documents/guidance-industry-potency-assurance-cellular-and-gene-therapy-products (read 25 November 2026)
  35. 35Regulation (EU) 2024/1938 on standards of quality and safety for substances of human origin intended for human application, Articles 85 and 87, EUR-⁠Lex, 13 June 2024. https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32024R1938 (read 25 November 2026)

See your process in Seal.