What did 21 CFR 820.75 require for process validation, and what replaced it?

21 CFR 820.75 required any process whose results cannot be fully verified by later inspection and test to be validated with a high degree of assurance and approved, then monitored and controlled, run by qualified people, and reviewed or revalidated after changes and deviations. Its successor, from 2 February 2026, is ISO 13485 clause 7.5.6, with sterilization in 7.5.7. Citations rose every year, from 16.1 to 19.3 per 100 device 483s, in fiscal years 2023 to 2025.Checked against its sources on 26 November 2026. How these answers are made

1Three paragraphs: validate, monitor, revalidate.

Section 820.75, “Process validation”, read in full:1

“(a) Where the results of a process cannot be fully verified by subsequent inspection and test, the process shall be validated with a high degree of assurance and approved according to established procedures. The validation activities and results, including the date and signature of the individual(s) approving the validation and where appropriate the major equipment validated, shall be documented.” 21 CFR 820.75(a), eCFR as of 1 February 20261
Table 1. 21 CFR 820.75(b) and (c), from the eCFR as in effect on 1 February 2026.1
ParagraphText
(b)“procedures for monitoring and control of process parameters for validated processes to ensure that the specified requirements continue to be met”
(b)(1)“validated processes are performed by qualified individual(s)”
(b)(2)“the monitoring and control methods and data, the date performed, and, where appropriate, the individual(s) performing the process or the major equipment used shall be documented”
(c)“When changes or process deviations occur, the manufacturer shall review and evaluate the process and perform revalidation where appropriate. These activities shall be documented.”

2From eighth to sixth among device sections.

Table 2. 820.75 on FDA’s device 483s by fiscal year, counting only the 483s FDA’s software generated. A citation is what the investigator observed, before any decision by FDA.2
Cited asFDA’s standard citationFY2023FY2024FY2025
820.75, all paragraphsAll six standard citations116124153
Cite 546“A process whose results cannot be fully verified by subsequent inspection and test has not been [adequately] validated according to established procedures.”798593
Cite 3118“Process validation [activities] [results] have not been [documented] [approved] [adequately documented] [adequately approved].”111621
820.75(b)“Procedures for monitoring and control of process parameters for a validated process have not been [adequately] established.”121623
820.75(c)Review, evaluation and revalidation after changes or deviations11610
820.75(b)(2)Records of the validated process as run316
Device 483sFor the rates per 100720672791

Process validation climbed from eighth to sixth among device sections, from 16.1 to 19.3 citations per 100 device 483s, and 820.75(a) was the fifth most cited device reference in FY2025.2 The validation itself (79 to 93), its records (11 to 21) and the monitoring of validated processes (12 to 23) all rose.2

3Unvalidated processes, unmonitored ones and skipped revalidation.

Of the 94 FY2025 citations of 820.75(a) in FDA’s Data Dashboard, 21 drop “adequately” to say a process was “not validated”, and 55 keep it, which may be the text left unedited.3 The test is whether the results can be “fully verified”: a seal, weld, bond, crimp or sterilization cycle whose strength or sterility can only be shown by destroying the product can’t be.1

Citations of 820.75(b), procedures for monitoring and controlling a validated process, rose from 1.7 to 2.9 per 100 device 483s.2 In the dashboard, 18 of its 21 FY2025 citations keep “adequately” and 3 drop it.3

Under 820.75(c), the standard citation is that a validated process “was not [reviewed and evaluated] [revalidated] when changes or process deviations occurred”.2 Over four years the dashboard’s commonest option is the plainest: “A validated process was not revalidated when changes or process deviations occurred.”3 Because the dashboard waits for final classifications, it holds 94 citations of 820.75(a) in FY2025 against the yearly file’s 114.3

4Clause 7.5.6, and 7.5.7 for sterilization.

From 2 February 2026 the Quality Management System Regulation (QMSR) takes process validation from ISO 13485:2016, which it incorporates.4 FDA’s compliance program lists the element “Validation of Processes for Production and Service Provision” against clause 7.5.6, and validation of sterilization and sterile barrier systems against clauses 7.5.5 and 7.5.7.5

Table 3. Data Dashboard counts for inspections whose classification was final by 26 November 2026. FY2026, 1 October 2025 to 30 September 2026, holds inspections on both sides of the change and will grow. Across all its paragraphs the old section drew 131 citations in FY2025 and 32 in FY2026.3
Cited asSubjectFY2025FY2026
820.75(a)Validation, the old paragraph (a)9423
ISO 13485 clause 7.5.6Validation of processes for production and service provision064
ISO 13485 clause 7.5.7Validation of processes for sterilization and sterile barrier systems05

Four single clauses drew more FY2026 citations than clause 7.5.6.3 At least 27 of its 64 citations say that “Processes for production and service provision where the resulting output cannot be, or is not, verified by subsequent monitoring or measurement” were not validated (14) or not adequately validated (13). At least 12 find the procedures for validation not documented or not adequately documented, 6 that “Records of the results and conclusion of validation of processes and necessary actions from the validation were not maintained”, and 3 that validation “did not adequately demonstrate the ability of the processes to achieve planned results consistently.”3

Note the words “cannot be, or is not, verified”. Under 820.75 a site could argue that a process was verifiable and so needed no validation. FDA’s clause 7.5.6 citation also reaches a process whose output could be verified but is not.3,1 Production software comes with it: the old rule validated it under 820.70(i), and FDA’s compliance program lists clause 7.5.6, with clauses 4.1.6 and 7.6, against software changes.5

5The decision rule changes; the protocol mostly doesn’t.

Table 4. From the text of 820.75, Compliance Program 7382.850 Attachment A, the QMSR final rule’s responses to comments 13 and 53, and FDA’s standard citations of the clauses.1,5,6,3
820.75Under the QMSRWhat to change
(a) Validate what can’t be fully verifiedClause 7.5.6Validate any process whose output is not in fact verified, not only one whose output can’t be; where verification is by sample, record why the sample is enough
(a) Approval with date and signatureClause 7.5.6 recordsKeep the signed approval; where ISO 13485 requires approval, FDA reads it as a signature and date
(b) Monitoring and control of parametersClause 7.5.6, with 7.5.1Keep it; link the validated window to the production record and to the alarm or review that catches a drift
(b)(1) Qualified individualsClause 6.2Re-cite to clause 6.2, which FDA says captures “the intent of the previous” 820.75(b)(1)
(b)(2) Records of each runClauses 7.5.1 and 7.5.6Little; keep the method, data, date, operator and equipment in the device or batch record
(c) Revalidate after changes and deviationsClause 7.5.6Keep the triggers in writing, and record the review even when it concludes no revalidation is needed
Sterilization and sterile barrierClauses 7.5.5 and 7.5.7Give them their own procedure or section; the compliance program treats them as an element of their own

In the final rule FDA restated one of the principles, it said, on which the quality system regulation is based: “all processes require some degree of qualification, verification, or validation, and manufacturers should not rely solely on inspection and testing to ensure processes are adequate for their intended use.”6

6An ultrasonic weld, validated, monitored and revalidated.

Invented for illustration. A two-part polycarbonate housing for a handheld device is ultrasonically welded. Weld strength can only be measured by pulling the parts apart, so the process must be validated.

Table 5. Example. A process validation summary, invented for illustration.
StageWhat was doneResult
InstallationWelder, horn and fixture installed and calibrated to the supplier’s specificationAccepted
OperationalWelds at the low and high ends of the window for amplitude, weld time and pressure; 30 parts at each corner pulledAll above the 150 N minimum; the window confirmed
Performance3 runs at nominal settings on 3 resin lots, 30 parts pulled from eachMean 212 N, standard deviation 14 N; Cpk 1.48 against a minimum of 1.33
MonitoringEnergy and collapse distance recorded for every weld, outside limits rejected automatically; 5 parts pulled each shiftIn the production record
ChangeHorn replaced after wearReviewed: same model and material; 30 parts welded at nominal and at both ends of the window and pulled; all above 150 N; recorded and approved

The capability: with only a lower limit, Cpk = (212 − 150) ÷ (3 × 14) = 62 ÷ 42 = 1.48. The change row is the one the 820.75(c) citations find missing: the review, its rationale and the partial revalidation, written down before production resumed.2

7What the validation procedure covers.

The procedure needs: how to decide which processes are validated, the protocol content (installation, operational and performance stages, acceptance criteria set in advance, statistical methods with the reason for each sample size), who approves, how the validated parameters are monitored in production, who may run the process, and which changes and deviations trigger review or revalidation. Templates for the protocol and the plan are in these answers:

8How it runs in Seal.

In Seal, an electronic device history record is kept for each lot or serial as the work happens: tester files brought in by Seal Edge, nonconformances and rework on the units they are about, and the sterilizer’s records. Each lot keeps the version of the route it was made to and names the bill of materials revision.

AQuestions and answers

Is 21 CFR 820.75 still current?

No. Under the QMSR, from 2 February 2026, process validation is ISO 13485 clause 7.5.6, and sterilization and sterile barrier systems are clauses 7.5.5 and 7.5.7. 820.75 still appears in FY2026’s data because that year began under the old rule.

Which processes must be validated?

Those whose output cannot be, or is not, verified by later monitoring or measurement. Typical examples are sealing, welding, bonding, molding, crimping, sterilization and cleaning, where proving the result would destroy the product, and any process whose output could be checked but is not.

Does FDA’s 2011 process validation guidance apply to devices?

No. It covers human and veterinary drugs, biologics, active ingredients and the drug constituent of combination products, and lists medical devices among the products it does not cover. It points device makers to a separate document, Quality Management Systems – Process Validation, edition 2.

When must a validated process be revalidated?

When a change or a process deviation could affect the result, after a review and evaluation that is recorded either way. Set the triggers in the procedure, such as equipment replacement, a new material or supplier, a move, or a trend toward the edge of the window.

Who may run a validated process?

People competent for it. The old 820.75(b)(1) required qualified individuals; FDA says ISO 13485 clause 6.2, on competence from education, training, skills and experience, captures that intent, with the records to show it.

References7 sources

References

  1. 121 CFR 820.75, Process validation, eCFR, as in effect on 1 February 2026. https://www.ecfr.gov/on/2026-02-01/title-21/section-820.75 (read 26 November 2026)
  2. 2Inspection Observations, FY2023, FY2024 and FY2025 Excel files, Summary and Devices sheets, inspections ending 1 October 2022 to 30 September 2025, FDA, page current as of 16 December 2025. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/inspection-references/inspection-observations (read 26 November 2026)
  3. 3FDA Data Dashboard, Inspections, Citations dataset (entire), downloaded 26 November 2026, inspections ending through 17 November 2026, final classifications only. https://datadashboard.fda.gov/oii/cd/inspections.htm (read 26 November 2026)
  4. 421 CFR 820.10, Requirements for a quality management system, eCFR, current to 24 November 2026. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-H/part-820/subpart-A/section-820.10 (read 26 November 2026)
  5. 5Compliance Program 7382.850, Inspection of Medical Device Manufacturers, FDA, implemented 2 February 2026, Attachment A. https://www.fda.gov/media/80195/download (read 26 November 2026)
  6. 6Medical Devices; Quality System Regulation Amendments, final rule, 89 FR 7496, effective 2 February 2026, responses to comments 13 and 53, FDA, 2 February 2024. https://www.federalregister.gov/documents/2024/02/02/2024-01709/medical-devices-quality-system-regulation-amendments (read 26 November 2026)
  7. 7Process Validation: General Principles and Practices, guidance for industry, FDA, January 2011, section I and footnote 5. https://www.fda.gov/media/71021/download (read 26 November 2026)