1Nine paragraphs on running production.
Section 820.70, “Production and process controls”, opened with the duty behind all its nine paragraphs:1
“Each manufacturer shall develop, conduct, control, and monitor production processes to ensure that a device conforms to its specifications.” 21 CFR 820.70(a), eCFR as of 1 February 20261
| Paragraph | What it asked |
|---|---|
| (a) General | Where deviations could occur, “process control procedures that describe any process controls necessary to ensure conformance to specifications”: instructions, monitoring of parameters, reference standards, approval of processes and equipment, and workmanship criteria |
| (b) Changes | Procedures for changes “to a specification, method, process, or procedure”, verified or validated “before implementation” |
| (c) Environmental control | Procedures “to adequately control these environmental conditions” where they “could reasonably be expected to have an adverse effect on product quality”, with the control systems “periodically inspected” |
| (d) Personnel | Requirements for “the health, cleanliness, personal practices, and clothing of personnel” where contact could harm product quality |
| (e) Contamination control | Procedures “to prevent contamination of equipment or product by substances that could reasonably be expected to have an adverse effect on product quality” |
| (f) Buildings | “of suitable design and contain sufficient space to perform necessary operations, prevent mixups, and assure orderly handling” |
| (g) Equipment | Equipment that “meets specified requirements”, with maintenance schedules, periodic inspection against them, and posted adjustment limits |
| (h) Manufacturing material | Procedures to remove or limit material such as a cleaning agent or mold release “to an amount that does not adversely affect the device’s quality” |
| (i) Automated processes | Software used “as part of production or the quality system” validated “for its intended use according to an established protocol”, and every change validated “before approval and issuance” |
2Environmental control rose most.
| Cited as | FDA’s standard citation | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
| 820.70, all paragraphs | All 16 standard citations | 123 | 137 | 155 |
| Cite 3680 | “Process control procedures that describe any process controls necessary to ensure conformance to specifications have not been [adequately] established.” | 26 | 32 | 27 |
| Cite 537 | “Production processes were not [developed] [conducted] [controlled] [monitored] to ensure that a device conforms to its specifications.” | 8 | 9 | 16 |
| 820.70(c) | “Procedures to control environmental conditions have not been [adequately] established.” | 25 | 26 | 40 |
| 820.70(i) | Software for production or the quality system not validated, or its validation not documented | 21 | 29 | 20 |
| 820.70(g)(1) | “Schedules for the adjustment, cleaning, and other maintenance of equipment have not been [adequately] established.” | 15 | 13 | 19 |
| 820.70(e) | Procedures to prevent contamination | 9 | 9 | 15 |
| 820.70(b) | Procedures for production and process changes | 5 | 9 | 7 |
| Device 483s | The year’s device 483s | 720 | 672 | 791 |
Production and process controls rose from sixth among device sections in FY2023, level with 820.184, to fifth in FY2025, from 17.1 to 19.6 citations per 100 device 483s.2 The largest single rise was environmental control: 25 to 40 citations, from 3.5 to 5.1 per 100.2
3Environmental procedures, process control and software.
In FDA’s Data Dashboard, which waits for each inspection’s final classification, 25 of the 32 FY2025 citations of 820.70(c) keep “adequately” in the environmental control procedure citation, and 21 of the 41 citations of 820.70(a) keep it in the process control one. A kept option may be the text left unedited, so neither count shows that a procedure existed.3 The standard texts don’t say what was missing, but 820.70(c) itself asked that control systems be “periodically inspected” and the activities “documented and reviewed”, so a plan with limits and no records or review falls short.1
The citation that production processes were not “developed”, “conducted”, “controlled” or “monitored” rose from 8 to 16, from 1.1 to 2.0 per 100 device 483s. Whichever of those words the investigator keeps, it is a finding about the process rather than its procedure.2
Software citations under 820.70(i) point more at the quality system than at production. Of the dashboard’s FY2023 to FY2025 citations, at least 25 concern software “used as part of the quality system”, at least 15 software used in production and at least 12 both; 25 of those 52 keep “adequately”.3 Quality system software includes complaint, CAPA, training and document systems, and spreadsheets.
4No single successor under the QMSR.
820.70 has no single successor in the Quality Management System Regulation (QMSR), which has incorporated ISO 13485:2016 into Part 820 since 2 February 2026.4 FDA’s compliance program lists infrastructure and maintenance against clause 6.3, work environment and contamination control against 6.4.1 and 6.4.2, control of production against 820.35, 820.45 and clause 7.5.1, cleanliness of product against 7.5.2, and QMS software validation against 4.1.6; software changes fall under clauses 4.1.6, 7.5.6 and 7.6.5
| Cited as | Subject | FY2025 | FY2026 |
|---|---|---|---|
| 820.70(a) | Process controls, the old paragraph (a) | 41 | 7 |
| ISO 13485 clause 7.5.1 | Control of production and service provision | 0 | 37 |
| ISO 13485 clause 6.3 | Infrastructure | 0 | 14 |
| ISO 13485 clause 6.4.1 | Work environment | 0 | 9 |
| ISO 13485 clause 4.1.6 | Validation of QMS software | 0 | 9 |
| ISO 13485 clause 6.4.2 | Contamination control | 0 | 4 |
Clause 7.5.1’s commonest citation is the broadest: 15 say “Production and service provision was not adequately planned, carried out, monitored, and controlled to ensure that product conforms to specification.” 5 more find that production controls “do not include documentation of procedures and methods for the control of production”, and 4 that they “do not include qualification of infrastructure”.3
5Splitting an 820.70 procedure across the clauses.
| 820.70 | Where it went | What to change |
|---|---|---|
| (a) Process controls | Clause 7.5.1, with 820.35 and 820.45 | Re-cite; keep instructions, parameter monitoring and workmanship criteria |
| (b) Production and process changes | Clauses 4.1.4, 7.3.9, 7.5.6 and the others FDA lists for product and process changes | Evaluate each change for risk and impact before implementation, the purpose FDA gives its change control area |
| (c) Environmental control | Clause 6.4.1 | Keep the limits, monitoring, periodic inspection and review |
| (d) Personnel | Clause 6.4.1 | Keep the health, cleanliness and clothing requirements |
| (e) Contamination control | Clause 6.4.2 | Keep the procedure; include contaminated or returned product |
| (f), (g) Buildings and equipment | Clause 6.3 | Keep maintenance schedules and records; FDA’s clause 7.5.1 citation now names “qualification of infrastructure” |
| (h) Manufacturing material | Clause 7.5.2, cleanliness of product | Keep the removal step and its record |
| (i) Quality system software | Clause 4.1.6 | List every QMS application and spreadsheet with its validation status |
| (i) Production software | Clause 7.5.6 | Validate it as part of process validation; see 21 CFR 820.75 |
6Example: environmental control for a device assembly room.
Invented for illustration. A catheter maker assembles and bonds in an ISO 14644-1 class 8 room before sterilization. Bonding needs humidity at or below 60%.
| Item | Limit | Monitoring | Record |
|---|---|---|---|
| Particles 0.5 µm and larger | Alert 1,760,000 per m³, action 3,520,000 | Monthly at 6 points; quarterly certification | Results trended monthly by quality |
| Room pressure | At least +10 Pa against the corridor | Continuous, alarmed | Alarm log reviewed weekly |
| Temperature | 18 to 24 °C | Continuous, alarmed | Alarm log reviewed weekly |
| Relative humidity | 30 to 60% | Continuous, alarmed | Alarm log reviewed weekly |
| Gowning | Smock, hair cover, gloves | Entry checklist | Signed daily |
In August the humidity reads 64% for 3 hours. The alarm is acknowledged, bonding stops and the 2 lots bonded in that window are held on a nonconformance report. A pull test on 20 retained samples from each lot gives 31 to 38 N against the 25 N minimum the bonding validation set, so both are released with the evaluation recorded on the report, and a dehumidifier is added through change control. The alert limit is half the class 8 action limit: 3,520,000 ÷ 2 = 1,760,000. The record shows what 820.70(c) asked for: the condition monitored, the excursion evaluated against the product, and the activities “documented and reviewed”.1
7What production control keeps on record.
Production control needs: work instructions and workmanship standards, the parameters monitored and their limits, the environmental and contamination controls with their monitoring and review, personnel hygiene and gowning, an equipment list with maintenance and inspection schedules, removal of manufacturing materials, change control, and a list of QMS and production software with each validation. For the software, the equipment and the rooms:
- CSV vs CSA, for FDA’s computer software assurance guidance on production and quality system software.
- Computer system validation, with a validation plan in Word.
- The calibration program, with a template, for equipment under clause 7.6.
- Cleanroom grades and ISO 14644 classes, with a checklist, written for medicines; its ISO class limits apply to device rooms.
- 21 CFR 820.75 and clause 7.5.6, for processes that must be validated.
8How it runs in Seal.
Seal’s electronic device history record follows each lot or serial along the version of the route it was made to, with the bill of materials revision named. Component lots are checked as they are scanned, tester files arrive through Seal Edge, and nonconformances and rework sit on the units they are about.
AQuestions and answers
Was 21 CFR 820.70 withdrawn?
Yes, with the rest of the old Part 820, when the QMSR took effect on 2 February 2026. Its paragraphs now sit in several ISO 13485 clauses: 7.5.1 for production control, 6.3 for buildings and equipment, 6.4 for work environment and contamination, 7.5.2 for cleanliness of product, and 4.1.6 and 7.5.6 for software. FY2026’s data still hold 820.70, from a year that began under the old rule.
Where did 820.70(i) software validation go?
Quality system software is ISO 13485 clause 4.1.6 and production software clause 7.5.6, with monitoring and measuring software under clause 7.6. FDA’s computer software assurance guidance, explained on the CSV vs CSA page, describes a risk-based way to do it.
Does a device assembly area need a cleanroom?
Only where the environment could reasonably be expected to affect product quality, as 820.70(c) put it. Devices that are sterilized or implanted are commonly assembled in a classified room; a mechanical assembly may need only controlled temperature and cleanliness. Write down the reasoning and the limits either way.
Is equipment maintenance still a requirement?
Yes. ISO 13485 clause 6.3 covers infrastructure and its maintenance, and FDA now also cites production controls that do not include qualification of infrastructure. Keep the schedules, the records of who did what and when, and the periodic checks that the schedules are met.
References5 sources
References
- 121 CFR 820.70, Production and process controls, eCFR, as in effect on 1 February 2026. https:/
/ www. ecfr. gov/ on/ 2026- 02- 01/ title- 21/ section- 820. 70 (read 26 November 2026) - 2Inspection Observations, FY2023, FY2024 and FY2025 Excel files, Summary and Devices sheets, inspections ending 1 October 2022 to 30 September 2025, FDA, page current as of 16 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ inspection- references/ inspection- observations (read 26 November 2026) - 3FDA Data Dashboard, Inspections, Citations dataset (entire), downloaded 26 November 2026, inspections ending through 17 November 2026, final classifications only. https:/
/ datadashboard. fda. gov/ oii/ cd/ inspections. htm (read 26 November 2026) - 421 CFR 820.10, Requirements for a quality management system, eCFR, current to 24 November 2026. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- H/ part- 820/ subpart- A/ section- 820. 10 (read 26 November 2026) - 5Compliance Program 7382.850, Inspection of Medical Device Manufacturers, FDA, implemented 2 February 2026, Attachment A. https:/
/ www. fda. gov/ media/ 80195/ download (read 26 November 2026)