GAMP 5 category and CSA scope, by component.

Answer four questions on intended use, architecture and risk to get the GAMP 5 Second Edition category, CSA level and deliverables.

The component

1. Intended GxP use
2. How the component is configured or developed
3. Process risk if this component fails
4. Complexity, supplier maturity and inspection scope

Assurance scope for LIMS specification limits and OOS flagging

GAMP 5 Second Edition
Category 4Configured components
FDA CSA assurance level
Scripted testing with executed, traceable scriptsScaled by process risk, architecture and market
Core deliverables
7 recordsReady to export into your validation plan

Components set up by choosing among vendor-supplied options, workflows, forms, roles or limits without writing custom code. Record configuration choices under change control.

High process risk under EU GMP / PIC/S scope: execute pre-approved traceable test scripts covering normal range, boundary limits and error handling (FDA CSA V.A.4; Annex 11 §4.7; draft Annex 11 §9.4 to §9.7).

DeliverableOwnerBasisScope and evidence
GMP inventory entry and intended-use statementSystem owner and process ownerAnnex 11 §4.3; FDA CSA V.A.1Record system/component name, version, GxP criticality, interfaces and validation status.
Component risk assessment and GAMP category rationaleProcess owner and QAAnnex 11 §1; GAMP 5 Ed. 2 M4, §12.2Document patient safety, product quality and data integrity impact plus complexity/novelty adjustments.
User requirements (URS) and traceabilityProcess ownerAnnex 11 §4.4; GAMP 5 D1, M5Define risk-based intended-use requirements traced directly to verification tests or supplier evidence.
Supplier assessment and written agreementQA and system ownerAnnex 11 §3; FDA CSA V.A.5Risk-based supplier audit or thorough quality evaluation (reviewing QMS, testing evidence, SOC 2 / security and release controls) plus a formal agreement (Annex 11 §3.1, §3.2) that includes an exit strategy (draft §7.5).
Controlled configuration specificationSystem owner / SMEAnnex 11 §10; draft Annex 11 §6.6Record configured workflows, roles, limits, calculation formulas and audit trail settings under change control.
Assurance plan, test execution and summary reportValidation / SME, QA approvesFDA CSA V.A.4, V.A.6; Annex 11 §4.7; 21 CFR 211.68(b)High process risk under EU GMP / PIC/S scope: execute pre-approved traceable test scripts covering normal range, boundary limits and error handling (FDA CSA V.A.4; Annex 11 §4.7; draft Annex 11 §9.4 to §9.7).
Change control, access control and periodic evaluationSystem owner and QAAnnex 11 §10, §11, §12; 21 CFR Part 11Screen vendor updates and configuration changes before release, review audit trails and user access, and run risk-based periodic evaluations.

Categorise per component, never once for an entire LIMS, eQMS or MES: one platform commonly holds Category 1 hosting, Category 3 standard reports, Category 4 configured workflows and Category 5 scripts.

The guide calls the category “just one factor in a risk-based approach” (Section 12.1.1), “not intended to provide a checklist approach to validation” (Section 12.2).

Relying on a supplier’s qualification changes nothing in what is asked of you: the 2025 draft of EU GMP Annex 11 (§7.1) keeps the regulated user “fully responsible”.

Where each classification comes from.

The categories are those of GAMP 5 Guide, Second Edition (July 2022, Appendix M4). It is sold, not free, so the wording here is checked against ISPE’s own 2026 article on categories, which quotes Section 12.2, and its table of contents. Firmware was Category 2 until 2008, when ISPE’s summary of the first edition says it “no longer exists”; firmware is usually qualified with its equipment.

The assurance levels are ours, read from FDA’s Computer Software Assurance guidance (3 February 2026) and EU GMP Annex 11, with the clause beside each deliverable. “Draft” means the 2025 consultation text, which isn’t in force.

Worked: one system, four components.

Example, all invented: a site’s environmental monitoring system, inspected by an EU authority. Each component goes through the classifier by itself.

ComponentThe answers that decide itGAMP 5Assurance level
Cloud hosting and databaseInfrastructure, under a proven supplierCategory 1Good IT practice and infrastructure qualification
Standard trend chartUsed as supplied; read onlyCategory 3Vendor evidence plus installation verification
Alarm limits and routingOptions chosen on screen; no one re-checks a missed alarmCategory 4Scripted testing with executed, traceable scripts
Particle counter import script40 lines written here; a reviewer checks every importCategory 5Scripted verification plus code and design review

“The system is Category 4” would have been wrong for three of the four. The script is the shortest part and has the most to prove; the alarm limits take no code and carry the most risk.

When the usual answer moves

What you findLikelihood of a defectDo
Particularly complex configurationHigher than typicalA formal configuration review, and more module tests
A less competent supplierHigher than typicalMore surveillance while the supplier verifies
Newly released, not proven in useMay be higher than typicalMore verification, and closer support after go-live
An identical copy of a proven configurationLower than typicalTest only each copy’s own parameters

From Table 1 of ISPE’s 2026 article.

What the memo decides, and who signs it.

DecisionWho makes itWhat the rule asks for
That the component is in scopeProcess owner, with QAFDA CSA, V.A.1: document how you decided whether the software is part of production or the quality system.
How far to validate itProcess owner and system owner, with QAAnnex 11, 1: decisions on the extent of validation rest on “a justified and documented risk assessment”.
How far to trust the supplierQA and the system ownerAnnex 11, 3.1 to 3.4: formal agreements, an audit where risk calls for one, and the supplier’s quality information available to inspectors.
That the listing is completeSystem ownerAnnex 11, 4.3: “an up to date listing of all relevant systems and their GMP functionality”.
When to ask againSystem owner and QAAnnex 11, 10 and 11: controlled change, and periodic evaluation.

Where a category stops.

It isn’t a validation checklist. Section 12.2 says so, and 12.1.1 calls the category “just one factor in a risk-based approach”. A 20-line script and a 20,000-line one are both Category 5.

It isn’t a regulation. Neither Annex 11 nor its draft uses the numbers. PIC/S reproduces GAMP 4’s for inspectors in PI 011-⁠3, 15.1.

FDA’s guidance is for device makers. Its scope is software used in production or the quality system for medical devices. A drug site rests on 21 CFR 211.68(b) and borrows the method.

It says nothing of the whole system. ISPE keeps a whole-system category for sizing the supplier assessment, or for an early, informal view. GAMP 5 software categories places the parts of a LIMS, eQMS and MES, with a full LIMS example, and GAMP 5 Second Edition says what changed.