GAMP 5 category and CSA scope, by component.
Answer four questions on intended use, architecture and risk to get the GAMP 5 Second Edition category, CSA level and deliverables.
The component
Assurance scope for LIMS specification limits and OOS flagging
- GAMP 5 Second Edition
- Category 4Configured components
- FDA CSA assurance level
- Scripted testing with executed, traceable scriptsScaled by process risk, architecture and market
- Core deliverables
- 7 recordsReady to export into your validation plan
Components set up by choosing among vendor-supplied options, workflows, forms, roles or limits without writing custom code. Record configuration choices under change control.
High process risk under EU GMP / PIC/S scope: execute pre-approved traceable test scripts covering normal range, boundary limits and error handling (FDA CSA V.A.4; Annex 11 §4.7; draft Annex 11 §9.4 to §9.7).
| Deliverable | Owner | Basis | Scope and evidence |
|---|---|---|---|
| GMP inventory entry and intended-use statement | System owner and process owner | Annex 11 §4.3; FDA CSA V.A.1 | Record system/component name, version, GxP criticality, interfaces and validation status. |
| Component risk assessment and GAMP category rationale | Process owner and QA | Annex 11 §1; GAMP 5 Ed. 2 M4, §12.2 | Document patient safety, product quality and data integrity impact plus complexity/novelty adjustments. |
| User requirements (URS) and traceability | Process owner | Annex 11 §4.4; GAMP 5 D1, M5 | Define risk-based intended-use requirements traced directly to verification tests or supplier evidence. |
| Supplier assessment and written agreement | QA and system owner | Annex 11 §3; FDA CSA V.A.5 | Risk-based supplier audit or thorough quality evaluation (reviewing QMS, testing evidence, SOC 2 / security and release controls) plus a formal agreement (Annex 11 §3.1, §3.2) that includes an exit strategy (draft §7.5). |
| Controlled configuration specification | System owner / SME | Annex 11 §10; draft Annex 11 §6.6 | Record configured workflows, roles, limits, calculation formulas and audit trail settings under change control. |
| Assurance plan, test execution and summary report | Validation / SME, QA approves | FDA CSA V.A.4, V.A.6; Annex 11 §4.7; 21 CFR 211.68(b) | High process risk under EU GMP / PIC/S scope: execute pre-approved traceable test scripts covering normal range, boundary limits and error handling (FDA CSA V.A.4; Annex 11 §4.7; draft Annex 11 §9.4 to §9.7). |
| Change control, access control and periodic evaluation | System owner and QA | Annex 11 §10, §11, §12; 21 CFR Part 11 | Screen vendor updates and configuration changes before release, review audit trails and user access, and run risk-based periodic evaluations. |
Categorise per component, never once for an entire LIMS, eQMS or MES: one platform commonly holds Category 1 hosting, Category 3 standard reports, Category 4 configured workflows and Category 5 scripts.
The guide calls the category “just one factor in a risk-based approach” (Section 12.1.1), “not intended to provide a checklist approach to validation” (Section 12.2).
Relying on a supplier’s qualification changes nothing in what is asked of you: the 2025 draft of EU GMP Annex 11 (§7.1) keeps the regulated user “fully responsible”.
Where each classification comes from.
The categories are those of GAMP 5 Guide, Second Edition (July 2022, Appendix M4). It is sold, not free, so the wording here is checked against ISPE’s own 2026 article on categories, which quotes Section 12.2, and its table of contents. Firmware was Category 2 until 2008, when ISPE’s summary of the first edition says it “no longer exists”; firmware is usually qualified with its equipment.
The assurance levels are ours, read from FDA’s Computer Software Assurance guidance (3 February 2026) and EU GMP Annex 11, with the clause beside each deliverable. “Draft” means the 2025 consultation text, which isn’t in force.
Worked: one system, four components.
Example, all invented: a site’s environmental monitoring system, inspected by an EU authority. Each component goes through the classifier by itself.
| Component | The answers that decide it | GAMP 5 | Assurance level |
|---|---|---|---|
| Cloud hosting and database | Infrastructure, under a proven supplier | Category 1 | Good IT practice and infrastructure qualification |
| Standard trend chart | Used as supplied; read only | Category 3 | Vendor evidence plus installation verification |
| Alarm limits and routing | Options chosen on screen; no one re-checks a missed alarm | Category 4 | Scripted testing with executed, traceable scripts |
| Particle counter import script | 40 lines written here; a reviewer checks every import | Category 5 | Scripted verification plus code and design review |
“The system is Category 4” would have been wrong for three of the four. The script is the shortest part and has the most to prove; the alarm limits take no code and carry the most risk.
When the usual answer moves
| What you find | Likelihood of a defect | Do |
|---|---|---|
| Particularly complex configuration | Higher than typical | A formal configuration review, and more module tests |
| A less competent supplier | Higher than typical | More surveillance while the supplier verifies |
| Newly released, not proven in use | May be higher than typical | More verification, and closer support after go-live |
| An identical copy of a proven configuration | Lower than typical | Test only each copy’s own parameters |
From Table 1 of ISPE’s 2026 article.
What the memo decides, and who signs it.
| Decision | Who makes it | What the rule asks for |
|---|---|---|
| That the component is in scope | Process owner, with QA | FDA CSA, V.A.1: document how you decided whether the software is part of production or the quality system. |
| How far to validate it | Process owner and system owner, with QA | Annex 11, 1: decisions on the extent of validation rest on “a justified and documented risk assessment”. |
| How far to trust the supplier | QA and the system owner | Annex 11, 3.1 to 3.4: formal agreements, an audit where risk calls for one, and the supplier’s quality information available to inspectors. |
| That the listing is complete | System owner | Annex 11, 4.3: “an up to date listing of all relevant systems and their GMP functionality”. |
| When to ask again | System owner and QA | Annex 11, 10 and 11: controlled change, and periodic evaluation. |
Where a category stops.
It isn’t a validation checklist. Section 12.2 says so, and 12.1.1 calls the category “just one factor in a risk-based approach”. A 20-line script and a 20,000-line one are both Category 5.
It isn’t a regulation. Neither Annex 11 nor its draft uses the numbers. PIC/S reproduces GAMP 4’s for inspectors in PI 011-3, 15.1.
FDA’s guidance is for device makers. Its scope is software used in production or the quality system for medical devices. A drug site rests on 21 CFR 211.68(b) and borrows the method.
It says nothing of the whole system. ISPE keeps a whole-system category for sizing the supplier assessment, or for an early, informal view. GAMP 5 software categories places the parts of a LIMS, eQMS and MES, with a full LIMS example, and GAMP 5 Second Edition says what changed.
Sources.
- When Is a Category Not a Category?, ISPE (2026). The category names, Sections 12.1.1 and 12.2 as it quotes them, and Table 1.
- GAMP 5 Second Edition, table of contents. The appendices named beside the deliverables.
- GAMP 4 to GAMP 5 summary, ISPE (2008). The end of Category 2.
- PIC/S PI 011-3 (2007). Firmware (6.3), and GAMP 4’s categories (15.1).
- FDA, Computer Software Assurance (3 February 2026). Scope (III) and V.A.1 to V.A.6.
- EU GMP Annex 11, revision 1. Principle, 1, 3, 4 and 10 to 12.
- Annex 11, draft for consultation (July 2025). 6.6, 7.1, 7.5 and 9.4 to 9.7.
Each was read on 24 November 2026.
Where this runs in Seal.
- Seal Validation
Requirements, component risk assessments, automated tests and release gates kept with the systems they prove.
- CSA plan and test records
Map each software function to FDA’s CSA examples and export function-by-function assurance records for Word.
- Part 11 and Annex 11 checklist
Assess electronic records, audit trails and electronic signature controls clause by clause.
- Supplier review and evidence
Review Seal’s managed-platform verification evidence, SOC 2 Type 2 and qualification boundaries.
- Best validation software for GxP
How Kneat, ValGenesis and Seal compare for risk-based validation and continuous change.
Keep requirements, risk and tests on one record.
In Seal each configured workflow and script stays linked to its user requirements, risk rationale and passing test runs, so updates revalidate cleanly.