1Audit trail requirements checklist.
Copy these lines into a user requirements specification or a supplier assessment; “draft” marks the 2025 Annex 11 revision. The rest of a URS is in user requirements specification.
| ID | Requirement | Source |
|---|---|---|
| AT-01 | The system writes entries itself; no user can edit or delete them | 11.10(e)1; PIC/S 9.62 |
| AT-02 | Each entry names the user, the role where a user holds more than one, and anyone who authorized a data change | Annex 11 12.43; PIC/S 9.62; draft 12.24 |
| AT-03 | Each entry records what changed, with the old and the new value | PIC/S 9.62; MHRA 6.135 |
| AT-04 | Each entry has a computer-generated date and time, with the time zone where relevant | 11.10(e)1; MHRA 6.135 |
| AT-05 | A reason is documented for each change or deletion of GxP data | Annex 11 93; MHRA 6.135; PIC/S 9.62; 58.130(e)6 |
| AT-06 | The system prompts for the reason and stores it with the entry | Draft 12.24; good practice today |
| AT-07 | A change never overwrites or obscures the earlier value | 11.10(e)1; PIC/S 9.62 |
| AT-08 | Entries are written as each action happens, not at the end of a sequence | PIC/S 9.62; FDA Q127 |
| AT-09 | The trail is on and locked; any change to it, its settings or the system clock makes its own entry | PIC/S 9.62; MHRA 6.135; draft 12.34 |
| AT-10 | Administrator rights sit with people independent of the record content | FDA Q47; draft 12.34 |
| AT-11 | System-level actions, such as access attempts and file deletions, are recorded | FDA Q1.c7; draft 11.94 |
| AT-12 | Entries can be viewed, printed and exported in a readable form | 11.10(e)1; Annex 11 93; PIC/S 9.62 |
| AT-13 | Entries can be searched and sorted, in the system or after export | PIC/S 9.62; draft 12.44 |
| AT-14 | Batch release printouts show whether data changed since first entry | Annex 11 8.23 |
| AT-15 | Entries are kept as long as the record and stay readable after upgrades and archiving | 11.10(e)1; Annex 11 7.1, 173 |
| AT-16 | A qualification assessment documents each trail’s GMP relevance, which data are critical and which changes and deletions it must capture | Annex 11 93; PIC/S 9.62 |
| AT-17 | Audit trail functions are tested during validation | PIC/S 9.62 |
Without AT-14, EMA may accept a procedure that prints the audit trail report and links it to the batch release record.8
2Example: audit trail OQ tests.
Illustrative tests to adapt. PIC/S expects validation to show that audit trails work, and FDA’s 2024 answers for clinical investigations limit clock changes to administrators, each one documented.2,
| Test | Steps | Expected result | Lines |
|---|---|---|---|
| OQ-AT-01 Create | As a test analyst, enter a value and save | Entry with user, role, date, time and zone, and the value; no reason asked | AT-01, 02, 04 |
| OQ-AT-02 Change | Change the value; save without a reason, then with one | Save refused without a reason; entry shows old value, new value and reason | AT-03, 05, 06, 07 |
| OQ-AT-03 Delete | Delete a record, giving a reason | Entry keeps the deleted value, user, time and reason | AT-05, 07 |
| OQ-AT-04 Sequence | Record four timed steps a minute apart | Four entries with four time stamps | AT-08 |
| OQ-AT-05 Switch off | As a user, try to disable the trail and edit an entry; as administrator, change a setting | Both attempts blocked; the setting change is logged | AT-01, 09, 10 |
| OQ-AT-06 Clock | As administrator, move the clock forward an hour and back; repeat as a user | Both changes logged; the user is refused | AT-04, 09 |
| OQ-AT-07 Access | Three failed logins, then a successful one | Each attempt recorded | AT-11 |
| OQ-AT-08 Export | Export a date range and search it by user and record | Readable, complete export; the search finds the test entries | AT-12, 13 |
3What each source requires.
| Source | Status | What it says |
|---|---|---|
| Part 11 | US law, 11.10(e) and 11.30 | Trails “independently record the date and time of operator entries and actions that create, modify, or delete electronic records”; changes “shall not obscure previously recorded information”1 |
| Predicate rules | US law | GLP changes “shall indicate the reason for change” (58.130(e)); method changes record “the reason for the modification” (211.194(b)); deviations are “recorded and justified” (211.100(b))6, |
| Annex 11, section 9 | EU guidance under binding law | A risk-based record of “all GMP-relevant changes and deletions”; “the reason should be documented”; trails “regularly reviewed”. The directive behind it says “audit trails shall be maintained”3, |
| PIC/S and MHRA | Inspectorate guidance | The “who, what, when and why”, and for data changes “the name of any person authorising the change”; trails “enabled and locked at all times”5, |
| FDA clinical Q&A | Final, October 2024 | Trails “should include the reasons for the changes” and be protected “from modification and from being disabled”9 |
| Draft Annex 11 | Draft, July 2025 | Systems “should automatically prompt the user for, and register the reason”4 |
Part 11 leaves the reason out on purpose. In 1997 FDA wrote: “The agency does not believe part 11 needs to require recording the reason for record changes because such a requirement, when needed, is already in place in existing regulations that pertain to the records themselves.”12 Its 2003 guidance says it intends to exercise enforcement discretion over 11.10(e), while predicate rules still apply.13
4Example: a filled-in audit trail extract.
Invented for illustration. At the Quillby plant an operator dispenses microcrystalline cellulose for Daltrovex 10 mg tablets, Batch 26-118 (target 24.70 kg, limits 24.58 to 24.82 kg), typing the balance reading into the dispensing system. Times are CET.
| Time | User (role) | Action | Old → new | Reason |
|---|---|---|---|---|
| 07:58:13 | rpatel (operator) | Entered weight | none → 24.86 kg | Not asked: first entry |
| 07:58:13 | system | Limit alarm | 24.86 kg above 24.82 kg | Not applicable |
| 08:02:40 | rpatel (operator) | Changed weight | 24.86 → 24.68 kg | “Digits transposed; printout BP-118-03 reads 24.68” |
| 08:05:02 | jmorales (operator) | Verified weight | none | Not asked |
| 09:14:26 | jmorales (operator) | Deleted entry | 12.40 kg → deleted | “Wrong batch selected; re-entered on 26-119” |
| 10:31:58 | itadmin2 (administrator) | Audit trail setting | On → Off | “Vendor patch VP-4.2” |
| 10:33:10 | itadmin2 (administrator) | Audit trail setting | Off → On | “Vendor patch VP-4.2” |
| 14:20:07 | akhan (reviewer) | Reviewed trail | none | Exception DEV-26-0733 |
How the reviewer reads it:
- Rows 1 to 4 are a good trail. The system flagged the entry, 0.04 kg over the limit, at once: the data-limit check Annex 11 4.7 expects validation to test. The correction came 4 minutes 27 seconds later with the old value visible; the reviewer checked it against printout BP-118-03, which reads 24.68 kg, and a second operator verified it, as Annex 11 6 asks.3
- Row 5 is a deletion done properly: the deleted value and the reason stay in the trail, and the reviewer found the matching entry in the Batch 26-119 trail.2
- Rows 6 and 7 are the finding. The trail was off for 72 seconds. The system logged it, but PIC/S expects the trail locked at all times, and Annex 11 expects configuration changes to follow a defined procedure, which a typed reason does not replace.2,
3 - Row 8 is the review: DEV-26-0733 asks whether any weight was entered in those 72 seconds and whether a change record covers VP-4.2.
5What goes in the audit trail, and what needs a reason.
| Situation | Entry needed | Reason needed | Source |
|---|---|---|---|
| First entry of a value | Yes: who, what and when | No; the reason applies to a change or deletion | 11.10(e)1; Annex 11 9, 12.43 |
| Change or deletion | Yes, keeping the old value | Yes under EU GMP, MHRA, PIC/S and GLP; Part 11 leaves it to the predicate rules | Annex 11 9;3 MHRA 6.13;5 PIC/S 9.6;2 58.130(e)6 |
| Reprocessing a result | Yes, with the integration parameters | Yes, a change justification | FDA Q1.c, Q147 |
| Aborted injection | Yes | Investigated and justified | FDA Q127 |
| Settings or clock change | Yes, automatically | Yes, through change control | PIC/S 9.62; Annex 11 103; draft 12.34 |
Recording and reviewing are separate decisions: MHRA says review need not include “every system activity (e.g. user log on/off, keystrokes etc.)”.5 Part 11 keeps the trail at least as long as its records; periods are in batch record retention.1
6How inspectors check and cite audit trails.
PIC/S tells inspectors to check that known changes and deletions actually appear in the audit trail, and that discrepancies found in review were investigated.2 At a pre-approval inspection FDA compares raw data with the application; an unexplained absence in a submitted chromatographic sequence is one of its examples of a concern.14 See audit trail review and pre-approval inspection.
FDA cited Aspen Pharmacare Holdings under 211.68(b) in February 2025:
“Your Production and QU did not review electronic raw data and audit trails to ensure data integrity prior to batch release. Your operators obtained and printed a passing result after multiple production filter integrity tests failed. Your operators did not record or print the failing results.” Aspen Pharmacare Holdings Limited, warning letter, 24 February 202515
In May 2025 the Spanish Agency of Medicines and Medical Devices listed computerized systems among four critical deficiencies at Nectar Life Sciences’ Unit II site at Dera Bassi, India:
“The following shortcomings, among others, were observed: outdated operating systems on HPLC systems (Windows XP, Windows 7), no traceability (e.g. audit trail) or approval of the change of some HPLC sequences, problems with operators’ privileges and lack of computerised systems validation.” Nectar Life Sciences Limited, EudraGMDP statement of non-compliance PE010-4837, 5 May 202516
7What the draft Annex 11 would change.
The July 2025 draft turns section 9’s one paragraph into ten subsections.4
- Every manual user interaction is logged, including settings, access privileges, alarm acknowledgments and electronic signatures (12.1).
- A complete, searchable electronic copy should be possible: “Flat and locked files are not acceptable” (12.9).
On 26 November 2026 EudraLex still lists the January 2011 Annex 11, so section 9 applies.17 More is in the draft Annex 11 revision.
8How it runs in Seal.
Seal keeps an audit log on each record, with version history, role-based access and electronic signatures that retain the signer, the time and the meaning of the approval, linked to the record. The audit trail review blueprint preserves before-and-after values, timestamps, reasons and source references, places vendor audit-trail exports, such as a chromatography data system’s, beside the record they belong to, and can make a required review a gate on the result or disposition. Neil can read such an export and draft a review brief with the exceptions indexed; the authorized reviewer decides significance and signs.
Seal’s regulatory overview and the validation and AI assurance guide set out what to demonstrate in qualification: who created or changed each record and when, the required signatures and authority checks, and the effect of changing an approved record.
AQuestions and answers
Is an audit log the same as an audit trail?
Not necessarily. An audit trail records changes to regulated records so their history can be reconstructed; an access log records logins and logouts. A system may keep the two together or apart, and the draft Annex 11 accepts either. Whatever the system calls it, the log that holds record changes must meet the audit trail requirements.
Is an audit trail mandatory for every GxP system?
Not in every case. Annex 11 and FDA’s 2003 guidance tie the decision to a documented risk assessment, and FDA notes audit trails are particularly appropriate where users create, modify or delete regulated records in normal operation. EMA accepts that a small device holding only transient data needs none, and PIC/S expects alternative controls, such as second-person checks, where a very simple system lacks one.
Is an audit trail a functional or non-functional requirement?
Write it as a functional requirement: something the system must do, stated in the user requirements and tested. PIC/S expects validation to show that the audit trail works, so the tests should create, change and delete values and check the entries that result.
Is an audit trail the same as change control?
No. PIC/S notes that an audit trail should not be confused with change control, the quality system process for approving changes. Part 11 does ask, in 11.10(k)(2), for change control procedures that keep a time-sequenced record of changes to system documentation.
Can audit trails be kept as PDF files?
Sometimes, for now. FDA’s 2024 guidance for clinical investigations recommends keeping audit trails in a searchable, sortable format, and accepts static files such as PDFs only where that is not practical and the files clearly match their records. PIC/S asks that audit trails keep their search and export functions where possible. The draft Annex 11 would rule out flat and locked files for GMP.
References17 sources
References
- 121 CFR Part 11, Electronic Records; Electronic Signatures, sections 11.10 and 11.30, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11 (read 26 November 2026) - 2PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, sections 9.6 and 9.8. https:/
/ picscheme. org/ docview/ 4234 (read 26 November 2026) - 3EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, European Commission, in operation from 30 June 2011. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 26 November 2026) - 4EudraLex Volume 4, Annex 11: Computerised Systems, draft for consultation, European Commission, July 2025, sections 11.9 and 12. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 26 November 2026) - 5‘GXP’ Data Integrity Guidance and Definitions, revision 1, MHRA, March 2018, section 6.13. https:/
/ assets. publishing. service. gov. uk/ media/ 5aa2b9ede5274a3e391e37f3/ MHRA_ GxP_ data_ integrity_ guide_ March_ edited_ Final. pdf (read 26 November 2026) - 621 CFR 58.130, Conduct of a nonclinical laboratory study, paragraph (e), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 58/ subpart- G/ section- 58. 130 (read 26 November 2026) - 7Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, questions 1.c, 4, 12 and 14. https:/
/ www. fda. gov/ media/ 119267/ download (read 26 November 2026) - 8Guidance on good manufacturing practice and good distribution practice: Questions and answers, Annex 11 questions 9 and 10, European Medicines Agency. https:/
/ www. ema. europa. eu/ en/ human- regulatory- overview/ research- development/ compliance- research- development/ good- manufacturing- practice/ guidance- good- manufacturing- practice- good- distribution- practice- questions- answers (read 25 November 2026) - 9Electronic Systems, Electronic Records, and Electronic Signatures in Clinical Investigations: Questions and Answers, Guidance for Industry, FDA, October 2024, questions 12 and 14. https:/
/ www. fda. gov/ media/ 166215/ download (read 26 November 2026) - 1021 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, sections 211.100(b) and 211.194(b), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211 (read 26 November 2026) - 11Commission Directive (EU) 2017/1572 of 15 September 2017, principles and guidelines of good manufacturing practice for medicinal products for human use, Article 9(2), EUR-Lex. https:/
/ eur- lex. europa. eu/ legal- content/ EN/ TXT/ ?uri=CELEX:32017L1572 (read 26 November 2026) - 12Electronic Records; Electronic Signatures, final rule, 62 FR 13430, FDA, 20 March 1997, comment 74, pages 13447 to 13448. https:/
/ www. govinfo. gov/ content/ pkg/ FR- 1997- 03- 20/ pdf/ 97- 6833. pdf (read 26 November 2026) - 13Guidance for Industry: Part 11, Electronic Records; Electronic Signatures, Scope and Application, FDA, August 2003, section III.C.2. https:/
/ www. fda. gov/ media/ 75414/ download (read 26 November 2026) - 14Compliance Program 7346.832, Preapproval Inspections, FDA, issued 29 June 2026, Objective 3, Data Integrity Audit. https:/
/ www. fda. gov/ media/ 193382/ download (read 26 November 2026) - 15Warning Letter 320-25-46 to Aspen Pharmacare Holdings Limited, FDA, 24 February 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ aspen- pharmacare- holdings- limited- 701671- 02242025 (read 26 November 2026) - 16Statement of non-compliance with GMP, report PE010-4837, Nectar Life Sciences Limited, Unit II, Spanish Agency of Medicines and Medical Devices, 5 May 2025, EudraGMDP document 177178. https:/
/ eudragmdp. ema. europa. eu/ inspections/ gmpc/ prepReviewSubmittedGMPC. do?key=177178 (read 26 November 2026) - 17EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 26 November 2026)