Skip to main content

What makes software 21 CFR Part 11 and GMP compliant?

No software is Part 11 or GMP compliant on its own, and FDA certifies none. Compliance belongs to the system as your organization uses it. The software supplies technical controls: locked audit trails, one account per person, authority checks, signatures showing name, date, time and meaning and linked to the record, complete copies and retrievable records. Your organization validates it for its intended use, controls changes, trains people and certifies its electronic signatures to FDA.Checked against its sources on 26 November 2026. How these answers are made

Illustration of a seal beside a laptop showing a data table and an evidence binder linked by a red thread.

1Is there FDA-certified Part 11 software?

No. FDA’s 2024 questions and answers on electronic systems in clinical investigations state that “FDA does not certify electronic systems and methods used to obtain electronic signatures”, and that signatures meeting Part 11 are acceptable “regardless of the particular technology or brand used”. FDA also “does not perform preliminary evaluations of electronic systems” against Part 11: “These systems will be evaluated during an inspection.”1 A vendor’s compliance badge describes features, not a status a regulator granted.

Part 11 places its controls on “persons who use closed systems”, not on products.2 Some duties only your organization can carry out:

  • confirming that people who develop, maintain or use the system have the education, training and experience for their tasks (11.10(i));
  • written policies that hold people accountable for actions under their electronic signatures (11.10(j));
  • verifying a person’s identity before issuing an electronic signature (11.100(b));
  • certifying to FDA that your electronic signatures are the legally binding equivalent of handwritten ones (11.100(c)).2

Validation is shared: the vendor tests its product, and you validate each CGMP workflow you build in it, which FDA calls “an intended use of a computer system to be checked through validation”.3

2What a Part 11 compliant system should be able to do.

Check these in a sandbox set up like your process, not only in a questionnaire. PIC/S expects systems to be “appropriately evaluated for data integrity controls prior to purchase”, and the MHRA says accepting vendor-supplied validation data “in isolation of system configuration and users intended use is not acceptable”.4,5 The clause-by-clause list is on 21 CFR Part 11 requirements.

Table 1. Checks for a Part 11 compliant system, run in your own configuration.
ControlHow to check itWhat good looks likeRule
Audit trailChange a value; as administrator, try to edit the entry, switch the trail off or change the clockWho, when, old and new value; users can’t change it; administrator changes, clock included, are recorded11.10(e); MHRA 6.13; draft Annex 11 12.3
Reason for changeChange GMP data without giving a reasonThe system asks for oneAnnex 11 section 9
Audit trail reviewPull one record’s trail and filter it to GMP changesA readable list or exception report a reviewer can check with the record before approvalAnnex 11 section 9; FDA data integrity Q&A 7 and 8; MHRA 6.13
Signature displaySign; view on screen and as a printoutPrinted name, date and time, and meaning, in both11.50
Signature linkCopy a signature; edit a signed recordCan’t be copied; the edit is blocked or shows as unsigned11.70; draft Annex 11 13.8
Signing componentsSign twice in a session, then after logoutID and password first, then at least the password; both after logout11.200(a)
Unique accountsExport users and rolesOne person per account; no shared account can change data11.300(a); FDA data integrity Q&A 5
Access changesGrant, change and remove a role, then find each record; compare the user list with current staffEach change recorded; the list is current, with no leaversAnnex 11 section 12.3; FDA data integrity Q&A 4; PIC/S 9.3
Password controlsEnter wrong passwords; read the expiry rules; disable a token reported lostFailed attempts limited and reported to security at once; passwords periodically checked or revised; lost tokens disabled11.300(b) to (d)
Authority checksSign or edit without the role, or as a disabled userBlocked11.10(d) and (g)
Sequence checksApprove before review is completeBlocked11.10(f)
AdministratorsAsk who holds them, vendor staff includedNamed, independent of record content; vendor access in writingFDA data integrity Q&A 4; Annex 11 section 3.1
CopiesExport a record with audit trail and signaturesComplete, electronic and human-readable11.10(b); Annex 11 section 8
Retention and exitRestore a backup; ask how data leaves at contract endRecords and metadata retrievable for the retention period11.10(c); Annex 11 sections 7 and 17; MHRA 6.20
Vendor releasesAsk how releases reach you and whether you can test them first; change a setting and find its recordRelease notes and test results per update; a test window before production; setting changes controlled and recordedAnnex 11 section 10; draft Annex 11 7.5(ix); FDA CSA guidance, Example 4
Supplier evidenceAsk for its quality system, audit reports and right to auditSupplier assessed; its quality and audit information available to inspectorsAnnex 11 sections 3.2, 3.4 and 4.5

Passing shows a product can be configured to comply, not that your system does.2,6,3,5,7,8 After go-live, two checks recur with every record and release: see audit trail review and assessing vendor releases.3,8

A cloud system is not open just because a vendor hosts it. Part 11 calls a system closed when access is controlled by the people responsible for the content of its records, and open when it isn’t (11.3(b)(4) and (9)). A vendor-hosted eQMS is closed if your organization decides who gets access, vendor staff included. If it can’t, 11.30 adds measures “such as document encryption and use of appropriate digital signature standards”.2

3Is SharePoint, Box, Excel or DocuSign Part 11 compliant?

Not as products, either way: it depends on the record, whether people rely on the electronic version, and your configuration.

Table 2. A decision aid for one record type in one tool.
QuestionIf yesIf no
Required by an FDA rule, or submitted to FDA?Next questionNot a Part 11 record; document the decision
Relied on electronically?Part 11 applies; next questionA complete signed printout is the record, if it is the original or a true copy; write that down
Passes the checks above?Validate it for this useAdd controls, choose another tool or keep that record on paper

Under FDA’s 2003 guidance, a record a predicate rule requires is a Part 11 record when it is kept electronically instead of on paper, or kept both ways with the electronic version relied on. FDA recommends that you “determine in advance whether you plan to rely on the electronic record or paper record” and document it.9 A printout can be the record only if it is the original or a true copy: for dynamic data, such as an FT-⁠IR spectral file, FDA says a printout “would not satisfy CGMP requirements to retain original records or true copies”.3 Part 11 also covers electronic records submitted to FDA “even if such records are not specifically identified in agency regulations”.2

3.1Cases that catch teams out.

  • A word processor used only to draft SOPs is FDA’s own example of a system for which validation “would not be important”.9
  • A spreadsheet that calculates GMP results is still a computer system under 211.68, even when the result is printed and signed.10 See spreadsheet validation.
  • In SharePoint, test whether version history records who changed what and when, and whether site owners can delete it. See eQMS or document management system.
  • An e-signature service passes only if the signed file shows each signature’s meaning and stays linked to it. See DocuSign and Adobe Sign under Part 11.
  • FDA has exercised enforcement discretion over Part 11’s validation, audit trail, retention and copying requirements since 2003, but enforces the predicate rules and the other controls, including signatures and the 11.300 password controls.9 Don’t buy on the strength of it: see the letters below.

4Example: checking a vendor’s claim before purchase.

This record is invented: the company, product, people and numbers are illustrative. Corrabell Therapeutics shortlisted Orvelline, a cloud eQMS whose datasheet claimed Part 11 compliance. On 15 and 16 September 2025 its QA and IT leads ran eight of the checks above in a vendor sandbox set up with Corrabell’s SOP approval workflow.

Table 3. Example. A pre-purchase check, invented for illustration; each row follows a rule in the checklist above.
CheckResultActionRule
Audit trailPass: who, when, old and new value; administrator couldn’t edit itNone11.10(e)
Reason for changeGap: optional by defaultMade mandatory; setting recorded in the configuration specificationAnnex 11 section 9
Signature displayGap: the PDF showed name, date and time, not meaningVendor fix due in release 4.2, written into the contract11.50(b)
Signature linkPass: an edited SOP showed as unsignedNone11.70
Signing componentsPass: ID and password first, password at each later signingNone11.200(a)
Sequence checksPass: approval blocked until review was completeNone11.10(f)
AdministratorsGap: a standing vendor support account with full rightsReplaced by named, time-limited access Corrabell grants, in the quality agreement11.10(d); Annex 11 section 3.1
CopiesPass: export with audit trail and signatures, as PDF and CSVExit terms added to the contract11.10(b) and (c)

Of eight checks, five passed and three found gaps: one closed by configuration, one by a vendor fix and one by contract. Orvelline’s SOC 2 Type 2 report and release test summaries went into Corrabell’s supplier assessment as evidence for infrastructure and standard screens, not for Corrabell’s workflow. Corrabell signed on 3 October 2025. Its validation, approved in February 2026, retested the signature printout on release 4.2: it passed.

5What GMP adds, and what inspectors cite.

Part 11 covers records and signatures. For drug manufacture, 21 CFR 211.68(b) adds controls over any “computer or related systems”: only authorized people change master or other records, input and output are checked for accuracy, and backup data must be “exact and complete” and secure from alteration or loss.10 FDA reads those systems broadly, to include software, cloud infrastructure, personnel and SOPs.3

Recent warning letters show gaps a pre-purchase check would have found:

“For example, your ultraviolet-visible (UV-vis) and infrared (IR) spectroscopy equipment was found to lack audit-trail functionality, and your analysts were able to alter and delete data, files, and folders. This is a repeat observation from your 2016 inspection.” Guangxi Yulin Pharmaceutical Group Co. Ltd., warning letter, 30 September 202511
“Our investigator documented an uncontrolled password for the (b)(4) meter affixed to a laptop by a sticker used for processing (b)(4) meter test results. In addition, the data from the (b)(4) meter is automatically deleted when the laptop is shutdown, so no records were available to show that your QU reviewed this data.” GC America, Inc., warning letter, 14 May 202612
“The review of aborted air sampler data was limited by its unacceptable data retention capability of only 115 entries.” Somerset Therapeutics Private Limited, warning letter, 4 September 202513

FDA cited Guangxi Yulin under 211.68(b), and GC America under 211.22(d) and 211.68(b); neither letter cites Part 11.11,12 Ask how many records a system keeps and what happens when it is full.

6How FDA, EU, MHRA and PIC/S differ.

Table 4. How the main sources differ on software controls.
TopicFDAEU GMP, MHRA and PIC/S
CertificationNone; systems are evaluated at inspection1No scheme; users review supplier documents against their requirements (Annex 11 3.3)6
Vendor evidenceDevice makers may leverage it after a risk-based vendor assessment8Not on its own, say MHRA and PIC/S5,4
Audit trail11.10(e), under enforcement discretion since 2003;9 cited under 211.68(b)11Based on risk, with a reason for each GMP change (Annex 11 section 9);6 users can’t switch it off (MHRA 6.13)5
SignaturesName, date and time, meaning; one letter can cover the organization2,1Time and date, permanently linked (Annex 11 section 14);6 no letter

7What changed, 2023 to 2026.

  • March 2023. 11.100(c) now lets the handwritten signature certification be submitted to FDA in electronic or paper form.2
  • October 2024. Revision 1 of FDA’s clinical investigation questions and answers listed what to agree with and check in IT service providers.1
  • February 2026. For device makers, the QMSR took effect on 2 February, and FDA’s final computer software assurance guidance of 3 February replaced the September 2025 version. It says Part 11’s validation discretion “expressly does not apply” to the software validation that ISO 13485 subclauses 4.1.6, 7.5.6 and 7.6 require.8 See CSV and CSA.
  • EU, still draft. The draft Annex 11 consulted on from 7 July to 7 October 2025 would require audit trails “enabled and locked at all times” (12.3), multifactor authentication for remote access to critical systems (11.6), automatic logout after a set period of inactivity (11.8) and contracts with an exit strategy (7.5).7,14 On 26 November 2026 EudraLex still lists the January 2011 Annex 11.15 Our judgment: ask vendors about these now; a system bought today will likely still run when the revision applies.

8How it runs in Seal.

Seal connects records with version history, audit trails and role-based access, and an electronic signature keeps the signer, the time and the meaning of the approval, linked to the record. The validation and AI assurance guide sets out what Seal provides, the platform controls, assurance capabilities and supplier evidence for the version in scope, and what your team owns: the intended use, risk acceptance and production approval, including qualification of integrations and migrated data, user procedures and training. It also lists what your security team should review, from support access and backup recovery to data export. When your quality and IT reviewers assess Seal as a supplier, they can request its security and validation evidence or work through the free Part 11 and Annex 11 readiness checklist.

As the regulatory overview puts it, no software alone makes an operation compliant, and it suggests agreeing an exit plan before production use: the records, formats, attachments, version history, signatures and audit evidence to export. On the Seal platform, every change runs its tests before your team releases it, and failures stay on the record.

AQuestions and answers

Does Part 11 require multi-factor authentication?

Not by that name. Part 11 limits access to authorized people and requires electronic signatures that are not biometric to use at least two distinct components, such as an ID and a password. The EU’s 2025 draft of Annex 11 would require multifactor authentication for remote access to critical systems from outside controlled perimeters, but it is still a draft.

What if a system already in use has no audit trail?

Assess what could be changed without trace and add controls for those records, such as restricted access, administrative procedures and second-person checks of the data. PIC/S accepts alternative arrangements for very simple systems, but asks companies to work toward buying or upgrading to software with an electronic audit trail. Plan the replacement and record the risk until then.

Can software we build in-house be Part 11 compliant?

Yes. Part 11 sets the same controls whoever wrote the software, and FDA certifies neither bought nor built systems. The difference is the evidence: with no supplier to assess, you hold the whole development record yourself. EU GMP Annex 11 expects bespoke or customized systems to have a process for formally assessing and reporting quality and performance at every stage of their life cycle, so keep design, testing and change records from the start.

Is a validated system enough to be GMP compliant?

No. The records it holds must still meet the predicate rules, such as production and control records reviewed and approved by the quality unit before release, and the procedures around the system must be followed. The MHRA notes that a validated system may lower data integrity risk but does not eliminate it.

References15 sources

References

  1. 1Electronic Systems, Electronic Records, and Electronic Signatures in Clinical Investigations: Questions and Answers, guidance for industry, Revision 1, FDA, October 2024, questions 16, 17, 28 and 29 and section III.C. https://www.fda.gov/media/166215/download (read 26 November 2026)
  2. 221 CFR Part 11, sections 11.1, 11.3, 11.10, 11.30, 11.50, 11.70, 11.100, 11.200 and 11.300, as amended 2 March 2023, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-11 (read 26 November 2026)
  3. 3Data Integrity and Compliance With Drug CGMP: Questions and Answers, guidance for industry, FDA, December 2018, questions 1.f, 3, 4, 5, 7, 8 and 10. https://www.fda.gov/media/119267/download (read 26 November 2026)
  4. 4PI 041-⁠1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, sections 9.3 and 9.6. https://picscheme.org/docview/4234 (read 26 November 2026)
  5. 5‘GXP’ Data Integrity Guidance and Definitions, Revision 1, MHRA, March 2018, sections 4.5, 6.13, 6.19 and 6.20. https://assets.publishing.service.gov.uk/media/5aa2b9ede5274a3e391e37f3/MHRA_GxP_data_integrity_guide_March_edited_Final.pdf (read 26 November 2026)
  6. 6EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, in operation since 30 June 2011, sections 3, 4.5, 7, 8, 9, 10, 12, 14 and 17. https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf (read 26 November 2026)
  7. 7EudraLex Volume 4, Annex 11: Computerised Systems, draft for consultation, European Commission, consultation opened 7 July 2025, sections 7.5, 11.6, 11.8, 12.3 and 13.8. https://health.ec.europa.eu/document/download/40231f18-e564-4043-94de-c031f813d38b_en?filename=mp_vol4_chap4_annex11_consultation_guideline_en.pdf (read 26 November 2026)
  8. 8Computer Software Assurance for Production and Quality Management System Software, guidance for industry and FDA staff, FDA, 3 February 2026, sections V.A(5) and V.B and Appendix A, Example 4. https://www.fda.gov/media/188844/download (read 26 November 2026)
  9. 9Guidance for Industry: Part 11, Electronic Records; Electronic Signatures, Scope and Application, FDA, August 2003, sections III.A, III.B.2 and III.C.1. https://www.fda.gov/media/75414/download (read 26 November 2026)
  10. 1021 CFR Part 211, section 211.68, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211 (read 26 November 2026)
  11. 11Guangxi Yulin Pharmaceutical Group Co. Ltd., warning letter, MARCS-⁠CMS 710422, FDA, 30 September 2025, item 4. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/guangxi-yulin-pharmaceutical-group-co-ltd-710422-09302025 (read 26 November 2026)
  12. 12GC America, Inc., warning letter, MARCS-⁠CMS 727602, FDA, 14 May 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/gc-america-inc-727602-05142026 (read 26 November 2026)
  13. 13Somerset Therapeutics Private Limited, warning letter, MARCS-⁠CMS 711340, FDA, 4 September 2025. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/somerset-therapeutics-private-limited-711340-09042025 (read 26 November 2026)
  14. 14Stakeholders’ Consultation on EudraLex Volume 4, Good Manufacturing Practice Guidelines: Chapter 4, Annex 11 and New Annex 22, European Commission, open 7 July to 7 October 2025. https://health.ec.europa.eu/consultations/stakeholders-consultation-eudralex-volume-4-good-manufacturing-practice-guidelines-chapter-4-annex_en (read 26 November 2026)
  15. 15EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 26 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.