Skip to main content

What is the difference between an eQMS and a document management system?

A document management system (DMS or EDMS) controls instructions: review, approval, versions, distribution and retention. An eQMS runs the quality processes that produce records, such as deviations, CAPA, change control, complaints, audits and training, and can include document control. A DMS can be enough before you make, test or release GMP batches. From then on, even when a CDMO makes them, you need deviation, CAPA and change records; an eQMS runs those and links them to the documents they revise.Checked against its sources on 9 November 2026. How these answers are made

Illustration of a seal following successive procedure versions and the version used for a batch.

1The difference at a glance.

EU GMP names two primary types of documentation: “instructions (directions, requirements) and records/reports”. Records “Provide evidence of various actions taken to demonstrate compliance with instructions”.1 A document management system is built for the first type. An eQMS is built for the processes that produce the second.

QuestionDocument management systemeQMS
What it controlsInstructions: specifications, procedures, protocols, formsQuality processes and their records: deviations, CAPA, changes, complaints, audits, suppliers, training
What a record followsA document: draft, review, approval, effective date, supersessionAn event: raised, investigated, acted on, checked, closed
EU GMP basisChapter 4, 4.1 to 4.51Chapter 1, 1.4;2 ICH Q10’s four elements3
US drug CGMP basis21 CFR 211.22(c), 211.100(a), 211.186421 CFR 211.100(b), 211.192, 211.1984
Links it keepsVersions of one document, and who trained on eachEvent to investigation, action, change, revision and effectiveness check
ValidationValidated for its use under Part 11 and Annex 11; for devices, also ISO 13485 4.1.65,6,7The same, across more functions

Document control can run inside the eQMS or in a separate EDMS beside it. ICH Q10 names four elements of the quality system: process performance and product quality monitoring, CAPA, change management and management review.3 An eQMS is software for running them. EU GMP adds the records it expects for training, complaints, recalls, returns, change control, deviations, internal audits and supplier audits.1

2Is a DMS enough? A decision aid.

Your situationWhat you needWhy
No GMP batches yetA validated DMS with training records can be enoughEU GMP scales the quality system to the “size and complexity of the company’s activities”2
Batches made by a CDMORecords of reviewing the CDMO’s deviations, approving its changes, auditing it and approving or rejecting its batches21 CFR 211.22(a);4 EU GMP 1.4(vii), 7.5 to 7.8, 7.12 and 7.172,8
Making or testing batchesDeviation, CAPA and change records as wellEU GMP 1.4(xii) to (xiv);2 21 CFR 211.100(b), 211.1924
Device maker (QMSR)The records ISO 13485 requires, with the complaint, servicing and UDI content 820.35 adds21 CFR 820.10 and 820.359,10
Separate DMS and eQMSA link from each change or CAPA to the revision and training it causesICH Q10: assurance of “no unintended consequences of the change”3
DMS holds blank formsControlled issue and reconciliation of numbered formsFDA data integrity Q611
SharePoint or similarValidate the GMP workflows you build, and assess the non-⁠GMP uses of the same systemFDA data integrity Q3;11 Annex 11 principle6

Outsourcing the batches does not outsource the decisions. FDA’s quality agreements guidance says the owner’s quality unit is “legally responsible for approving or rejecting drug products manufactured by the contract facility, including for final release”, and that the agreement should set out which changes the owner approves before they are implemented.12 A DMS can hold the quality agreement; the reviews and approvals it calls for are records of events.

Published eQMS prices, a budget template and where the cost goes with SharePoint are in eQMS cost.

3Example: one change through both set-ups.

Example, invented. Ollerby Biologics, a CDMO, investigates deviation DEV-⁠26-⁠0114: on 14 April 2026 an operator prepared buffer for Batch 26-⁠031 from a printed table that version 6 of SOP-⁠MFG-⁠020 had replaced. CAPA-⁠26-⁠0042 removes printed tables and revises the SOP.

StepRecordDMS beside an eQMSOne eQMSRule
DeviationDEV-⁠26-⁠0114, opened 14 AprilIn the eQMSThe same21 CFR 211.1924
CAPACAPA-⁠26-⁠0042: remove printed tablesIn the eQMS; SOP number typed inLinked to the SOP recordEU GMP 1.4(xiv)2
ChangeCC-⁠26-⁠0077, approved 12 May, before the revisionIn the eQMSRaises the revisionEU GMP 1.4(xii)2
RevisionSOP-⁠MFG-⁠020 version 7, effective 2 JuneIn the DMS; change number typed inSame record as the changeEU GMP 4.31
Training23 operators trained on version 7 by 1 JuneIn the DMS or a training toolAssigned from the revisionEU GMP 4.291
EffectivenessNo replaced table used in the next 30 batchesIn the eQMS, after checking the DMS by handThe same recordEU GMP 1.4(xiv)2

Both set-ups hold every record. The difference shows when an inspector asks what changed because of the deviation: one system gives a linked trail, two give a reconciliation of numbers typed into each. EU GMP expects that after a change “an evaluation is undertaken to confirm the quality objectives were achieved”,2 which is easier to show when the change, the revision and the training sit together.

4What a DMS must do under GMP.

ControlWhat it meansSource
ApprovalApproved, signed and dated by authorised people and uniquely identifiable; in the US, the quality control unit approvesEU GMP 4.3;1 21 CFR 211.22(c), 211.100(a)4
Master recordsPrepared, dated and signed by one person; independently checked, dated and signed by a second21 CFR 211.186(a)4
Effective dateDefined for every instructionEU GMP 4.31
SupersessionIssue, revision, superseding and withdrawal controlled, with revision historiesICH Q7 6.11;13 draft EU GMP 4.5414
Working copiesReproduced from masters without introducing errorsEU GMP 4.21
Templates and formsElectronic templates, forms and master documents under controlEU GMP 4.11
Blank formsIssued under control; numbered sets reconciledFDA data integrity Q611
Periodic reviewDocuments regularly reviewed and kept up to dateEU GMP 4.51
InventoryA list of the documents in the quality management systemEU GMP 4.321
RetentionSecured, and readily available for inspection, throughout the retention periodEU GMP 4.10;1 21 CFR 211.180(c)4
Who did whatThe identity of whoever enters, changes, confirms or deletes data, with date and timeAnnex 11 12.46
Electronic recordsValidation, access limits, authority checks and time-stamped audit trails21 CFR 11.105

Section 211.186(a) asks for a “full signature, handwritten” on master production and control records.4 FDA treats an electronic signature that meets Part 11 as “equivalent to full handwritten signatures”, so a DMS that meets Part 11 can carry it.5

The risk sits in approval, issue and retention, not in the editor. FDA’s Part 11 guidance says validation “would not be important for a word processor used only to generate SOPs”.15 More on the procedures in GMP document control.

5What inspectors find.

Files without controls:

“Multiple controlled documents, including the Device Master Record for the Hydro-⁠San Plus and the Aqua Cleanse Work Instruction, were provided as editable MS Word files without password protection, electronic signatures, or any controls preventing unauthorized modification.” Specialty Health Products CO, LLC, warning letter, 7 July 202616

FDA added that the firm had not addressed “the need for a comprehensive overhaul of its electronic document management system, including access controls, audit trails, and version control”.16

Blank forms from the document system, without issue control:

“Your production manager repeatedly accessed and printed uncontrolled blank copies of production records, media fill records, visual inspection records, process validation batch records, and cleaning validation records saved on his computer or through your document management system.” Jiangsu Hengrui Pharmaceuticals Co., Ltd., warning letter 320-⁠24-⁠51, 11 July 202417

6What is changing.

The European Commission and PIC/S consulted on a revised Chapter 4 alongside Annex 11 from 7 July to 7 October 2025.18 The draft keeps the two types of documentation and adds a data governance system. Documents held “electronically, paper based, by other means or through a hybrid system” would have to “meet the same GMP requirements for legibility, accuracy, integrity, and completeness throughout the whole lifecycle”.14 Its 4.54 would bring ICH Q7’s control of superseding and withdrawal to finished products.14,13 On 8 November 2026 EudraLex still lists the January 2011 Chapter 4.19 For devices, the QMSR took effect on 2 February 2026; record control now follows ISO 13485 clause 4.2.5, with the content 820.35 adds.20,10

7How it runs in Seal.

In Seal, document control runs requests, review, approval, change impact, training, effective dates, controlled copies and supersession as one governed workflow, and a revision identifies the affected roles and the work that depends on it. The instruction is linked to the training, forms and execution rules it governs. A revision carries its reason, impact assessment, configuration and verification through change control, and completed records keep the version they used; see document management in Seal. You can start with one procedure in a 48-hour evaluation: an effective SOP, a proposed revision and the form or training requirement it affects.

If your documents live in SharePoint, the SharePoint comparison sets out what Microsoft’s own documentation says: no certification exists for Part 11, and customers who build applications subject to FDA regulation are responsible for meeting its requirements.

AQuestions and answers

Is an EDMS the same as a document management system?

Yes. EDMS stands for electronic document management system; the E says only that the documents are electronic. Under GMP it has to meet the same document control expectations as paper, plus the computerised system rules of Part 11 and EU GMP Annex 11.

What is the difference between an EDMS and an EDRMS?

An EDRMS adds records management to document management: classifying records, applying retention periods and controlling their disposal. GMP sets some of those periods. EU GMP keeps batch documentation for one year after the batch expires or at least five years after QP certification, whichever is longer, and US drug CGMP keeps batch records for at least one year after expiry.

Is an eQMS the same as a QMS?

No. The quality management system is the organisation’s responsibilities, procedures, processes and records, whatever medium they use. An eQMS is software that runs parts of it. A paper QMS is still a QMS, and buying an eQMS does not create one: the procedures and the people who follow them do.

Does an eQMS replace a document management system?

It can, if its document control meets GMP: approval, effective dates, versions, controlled distribution, periodic review and retention. Some companies keep a separate DMS and connect it to the eQMS. Then the link between a change or CAPA and the document revision it causes has to be kept across both systems.

Can SharePoint be used as a GMP document management system?

It can, if the company configures it, validates it for its intended use and meets the controls GMP expects, such as signed approval, audit trails, retention and access control. That configuration and validation is the regulated company’s responsibility, not the platform vendor’s, and other uses of the same site need assessing for their effect on the GMP ones.

References20 sources

References

  1. 1EudraLex Volume 4, Chapter 4: Documentation, European Commission, January 2011. https://health.ec.europa.eu/system/files/2016-11/chapter4_01-2011_en_0.pdf (read 8 November 2026)
  2. 2EudraLex Volume 4, Chapter 1: Pharmaceutical Quality System, sections 1.3 and 1.4, European Commission, in operation since 31 January 2013. https://health.ec.europa.eu/document/download/e458c423-f564-4171-b344-030a461c567f_en?filename=vol4-chap1_2013-01_en.pdf (read 8 November 2026)
  3. 3ICH Q10, Pharmaceutical Quality System, sections 3.2 and 3.2.3, ICH, 4 June 2008. https://database.ich.org/sites/default/files/Q10%20Guideline.pdf (read 8 November 2026)
  4. 421 CFR Part 211, Current Good Manufacturing Practice for Finished Pharmaceuticals, sections 211.22, 211.100, 211.180, 211.186, 211.192 and 211.198, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211 (read 8 November 2026)
  5. 521 CFR Part 11, Electronic Records; Electronic Signatures, sections 11.1(c) and 11.10, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-11 (read 8 November 2026)
  6. 6EudraLex Volume 4, Annex 11: Computerised Systems, European Commission, January 2011. https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf (read 8 November 2026)
  7. 7Computer Software Assurance for Production and Quality Management System Software, guidance for industry and FDA staff, section V.A.1, FDA, 3 February 2026. https://www.fda.gov/media/188844/download (read 8 November 2026)
  8. 8EudraLex Volume 4, Chapter 7: Outsourced Activities, sections 7.5 to 7.8, 7.12 and 7.17, European Commission, in operation since 31 January 2013. https://health.ec.europa.eu/document/download/58b5106a-cf6f-4352-9dca-1caf5d27d97e_en?filename=vol4-chap7_2012-06_en.pdf (read 8 November 2026)
  9. 921 CFR 820.10, Requirements for a quality management system, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-H/part-820/subpart-B/section-820.10 (read 8 November 2026)
  10. 1021 CFR 820.35, Control of records, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-H/part-820/subpart-B/section-820.35 (read 8 November 2026)
  11. 11Data Integrity and Compliance With Drug CGMP: Questions and Answers, guidance for industry, questions 3 and 6, FDA, December 2018. https://www.fda.gov/media/119267/download (read 8 November 2026)
  12. 12Contract Manufacturing Arrangements for Drugs: Quality Agreements, guidance for industry, FDA, November 2016. https://www.fda.gov/regulatory-information/search-fda-guidance-documents/contract-manufacturing-arrangements-drugs-quality-agreements-guidance-industry (read 8 November 2026)
  13. 13ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, section 6.11, ICH, 10 November 2000. https://database.ich.org/sites/default/files/Q7%20Guideline.pdf (read 8 November 2026)
  14. 14Chapter 4: Documentation, draft for consultation, sections 4.8 to 4.10 and 4.54, European Commission and PIC/S, July 2025. https://picscheme.org/docview/9713 (read 8 November 2026)
  15. 15Guidance for Industry: Part 11, Electronic Records; Electronic Signatures, Scope and Application, FDA, August 2003. https://www.fda.gov/regulatory-information/search-fda-guidance-documents/part-11-electronic-records-electronic-signatures-scope-and-application (read 8 November 2026)
  16. 16Specialty Health Products CO, LLC, warning letter, MARCS-⁠CMS 726564, FDA, 7 July 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/specialty-health-products-co-llc-726564-07072026 (read 8 November 2026)
  17. 17Jiangsu Hengrui Pharmaceuticals Co., Ltd., warning letter 320-⁠24-⁠51, FDA, 11 July 2024. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/jiangsu-hengrui-pharmaceuticals-co-ltd-679790-07112024 (read 8 November 2026)
  18. 18Joint stakeholders consultation on the revision of Chapter 4, Annex 11 and the new Annex 22 of the PIC/S and EU GMP Guides, PIC/S, 7 July 2025. https://picscheme.org/en/news/131/joint-stakeholders-consultation-on-the-revision-of-chapter-4 (read 8 November 2026)
  19. 19EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 8 November 2026)
  20. 20Quality Management System Regulation (QMSR), FDA, updated 2 February 2026. https://www.fda.gov/medical-devices/postmarket-requirements-devices/quality-management-system-regulation-qmsr (read 8 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.