What does EU GMP Annex 1 require for environmental monitoring?

EU GMP Annex 1 asks for a documented, risk-based environmental monitoring programme within the contamination control strategy, covering total particles, viable particles in air, on surfaces and on people, and temperature and humidity. Grade A is monitored throughout critical processing: particles continuously at 28 litres a minute or more, unless the process would damage the counter or pose a hazard, and viable air by air sampling or settle plates. Tables 5 and 6 cap action limits; results feed batch certification.Checked against its sources on 9 November 2026. How these answers are made

Illustration of a seal beside a colony counter and culture plates.

1What the monitoring programme should contain.

Annex 1 section 9 asks for a documented monitoring programme that “forms part of the overall CCS”, the contamination control strategy, kept distinct from cleanroom qualification (4.24). Each row gives the evidence an inspector can ask to see; bare numbers are Annex 1 points.1

Table 1. Checklist. An Annex 1 monitoring programme and its evidence. PI 058-⁠1 is the PIC/S reading of Annex 1.2
ElementWhat the programme definesEvidence to have readySource
Risk assessmentLocations, frequency, methods and incubation, from process, facility, qualification and routine data and the usual flora; reviewed regularlyRisk assessment, location maps, reviews9.4
LocationsHighest-risk points in grade A and the adjacent grade B; position and orientation of each sampler justifiedAirflow visualisation videos4.15, 9.4, 9.7
When to sampleIn operation through every critical stage, set-up included; after disinfection, before start-up, after the batch and after shutdownsSampling schedule9.5, 9.23
Total particles0.5 and 5 µm in every grade: A continuously at 28 litres a minute or more, B similarly but less often, both alarmed at alert levels; C and D in operation. Hazardous processes: before and after exposureContinuous data, alarm log; the hazard strategy in the CCS9.12, 9.15 to 9.20; PI 058-⁠1 Q9.17
Particle countersQualified with their tubing: typically 1 m or less, few bends, isokinetic heads (drawing air at the speed it flows); sample volume justifiedCounter qualification, volume rationale5.9, 9.21
Viable methodsSettle plates, active air, surfaces, gloves and gowns in combination, not disturbing grade A and B airflow; surfaces at the end of the operation; rapid methods once shown equivalentRecovery data; a formal risk assessment naming alternative controls for any Table 6 method the process rules out9.22, 9.28, 9.29; PI 058-⁠1
Grade A viable airContinuous through critical processing, by air sampling or settle plates; considered for grade BResults from set-up to end9.24
PersonnelAt intervals; after critical interventions (at least gloves); at each grade B exit (gloves and gown). An adverse trend can disqualify an operatorResults trended by operator and intervention7.6, 9.25
Other parametersTemperature and humidity in range; critical pressure differences recorded continuously, with a warning systemPressure records, warning log4.16, 9.6
Limits and trendsAlert levels from qualification, then trend data; action limits no looser than Tables 5 and 6Trending procedure, trend reports9.9 to 9.11
OrganismsA and B to species; C and D after an action excursion; considered after alert excursions or a loss-of-control organismIdentification records9.31; PI 058-⁠1
MediaGrowth promotion before use, with representative local isolatesGrowth promotion records10.9
Batch releaseMonitoring and trend data reviewed for certification; an out-of-trend procedureThe review in each certification10.10

Aseptic process simulation, the programme’s fourth element (9.2), should be monitored as routine production is, for its whole duration (9.36); media fill covers the rest.1

2The limits in Tables 5 and 6.

Table 5 gives the maximum total particle limits for monitoring, per cubic metre.1

Grade0.5 µm at rest0.5 µm in operation5 µm at rest5 µm in operation
A3,5203,5202929
B3,520352,000292,930
C352,0003,520,0002,93029,300
D3,520,000Set by the site29,300Set by the site

Table 6 gives the maximum viable action limits, in colony-forming units (CFU).1

GradeAir, CFU/m³Settle plate, 90 mm, per 4 hoursContact plate, 55 mmGlove print, 5 fingers
ANo growthNo growthNo growthNo growth
B10555
C1005025None set
D20010050None set

PIC/S reads Table 6 as per plate: a plate exposed for less than 4 hours keeps the same limit, exposure “should not be deliberately shortened to avoid positive results”, and plates used in turn at one position should together stay within the 4-hour limit.2

3Example: a sampling plan for one filling line.

This plan is invented. Line 4 fills a liquid into vials inside a restricted access barrier system (RABS): grade A inside, grade B around it, a grade C preparation room and grade D corridors. It fills one batch each weekday in one 8-hour shift. Alert levels are illustrative; action limits are the Annex 1 maxima where it sets them, though PIC/S expects a plant with a long excursion-free record to tighten its alert levels or action limits (Q9.9).2

Table 4. Example. An invented sampling plan; its incubation conditions are illustrative too.
LocationMethodWhenAlert; actionBasis
A: fill needlesParticle counter, 0.6 m tubing, 28.3 litres a minute, one reading a minuteContinuous, set-up to end of fill0.5 µm, each reading: 1,000; 3,520 per m³. 5 µm, last 36 readings: 10; 29 counts5.9, 9.17, 9.21, Table 5
A: fill needlesActive air samplerContinuous, set-up to end of fillAny growth investigated9.24, Table 6
A: stopper bowlSettle plate, 90 mmSet-up to end of fill, changed within 4 hoursAny growth investigatedTable 6
A: RABS glovesPrint of each barrier glove usedAfter a critical intervention, before a sterilised glove replaces it; end of fillAny growth investigated4.21, 9.25, Table 6
A: contact partsSwabs of needles and stopper trackEnd of fillAny growth investigated9.22
B: operatorsGlove prints; contact plates on forearms and chestMid-shift; gloves and gown at each exit3; 5 CFU per glove or plate9.25, Table 6
B: room particlesParticle counter1 minute in every 5, in operation35,200 and 290; 352,000 and 2,930 per m³9.18, Table 5
B: room airActive air, 1 m³Every 2 hours in operation5; 10 CFU/m³9.24, Table 6
B: surfacesContact plates, 6 pointsEnd of each shift3; 5 CFU per plate9.22, Table 6
C: room particlesParticle counterWeekly, in operation352,000 and 2,930; 3,520,000 and 29,300 per m³9.12, 9.15, Table 5
C: air, surfacesActive air; contact plates, 6 of 12 points in rotationWeekly, in operation50; 100 CFU/m³. 15; 25 per plate9.12, Table 6
D: corridor particlesParticle counterMonthly, in operation and 20 minutes after the shiftIn operation: set from routine data. At rest: 352,000 and 2,930; 3,520,000 and 29,300 per m³9.12, 9.15, Table 5 notes
D: corridor platesSettle and contact platesMonthly, in operation50; 100 per 4 hours. 30; 50 per plate9.12, Table 6
A to C: no productionActive air; contact plates at the routine pointsAfter disinfection, before Monday’s first fill, after any shutdownAs in operation9.23, Table 6
All platesIncubated 3 days at 20 to 25 °C, then 2 days at 30 to 35 °CRead on day 5As above9.4

Annex 1 sets the grade A coverage, the 4-hour plate change and the maximum limits, and singles out the personnel triggers (9.25) and sampling while production is stopped (9.23); within those rules the risk assessment chose locations, frequencies, methods and incubation (9.4), including an active sampler as well as settle plates, though 9.24 accepts either. Line 4 treats a printed RABS glove as the outer glove that 9.25 replaces, so a sterilised one (4.21) goes on before filling resumes. Grade B air is sampled every 2 hours because the RABS doors stay shut; opening one is an intervention that adds a sample (9.24).1

The 5 µm row is the judgement call. Each grade A reading is one minute at 28.3 litres, so a single 5 µm count is 35 per m³, above the 29 action limit: judged reading by reading, every count is an action excursion and no alert can fire first. Line 4 instead sums the last 36 readings (1.02 m³, the fewest that reach 1 m³) every minute. Monitoring volumes may differ from classification volumes if “justified” (9.21), but 9.17 asks the system to correlate “each individual sample result” with the levels, so the CCS has to justify the rolling sum. Line 4 also investigates repeated low counts below the alert level (Table 5 Note 2).1

4When a result crosses a level.

Any growth in grade A needs an investigation, identification to species and an impact assessment for each batch implicated (Table 6, 9.31). Above an action limit, Annex 1 asks for a root cause investigation, the impact on product including batches made between sampling and reporting, and corrective and preventive action (CAPA), with each batch’s inclusion or exclusion justified (3.2, 9.13). Above an alert level, it asks for assessment and follow-up (9.13). Short shelf-life products released before their results arrive need a review of the most recent data (10.10).1 Setting the levels, and the response to each kind of result, is on alert and action limits.

4.1Example: which batches a plate reaches.

Line 4’s stopper bowl settle plate, exposed from 08:10 to 12:05 on 3 March 2026 during Batch 26-⁠041, is read on Sunday 8 March, after five days’ incubation: 1 CFU, which in grade A means an investigation and a species identification.1 The impact assessment covers “batches produced between the monitoring and reporting”, so Batches 26-⁠041 to 26-⁠044, filled on 3, 4, 5 and 6 March, are all in scope. None is certified until the investigation is complete, and the reason for excluding any of them is recorded.1

5What changed in 2022, and what ATMPs still follow.

The 2022 Annex 1 revised the text in operation since 1 March 2009 and came into operation on 25 August 2023, in EudraLex and the PIC/S GMP guide alike.1,3,2,4 In the EU, advanced therapy medicinal products (ATMPs) follow Part IV of 2017 instead: other Volume 4 documents “are not applicable to ATMPs, unless specific reference thereto is made”. Part IV still carries the 2008 limits.5

Table 5. What changed in 2022. Numbers in brackets are each document’s points. Sources: 2008 Annex 1;3 2022 Annex 1;1 PI 058-⁠1;2 Part IV.5
TopicAnnex 1, 2008Annex 1, 2022Part IV, ATMPs
Viable limitsRecommended “average values”; grade A “<1” (19)Maximum action limits; grade A “No growth”, any growth investigated (Table 6)Recommended maxima; grade A “<1”, 0 CFU expected (4.59)
Grade A, 5 µm20 per m³ (4)29 per m³ in monitoring (Table 5); no default classification limit (Table 1; PI 058-⁠1 Q4.27)20, kept “Due to limitations of monitoring equipment” (4.50)
Grade A particle flowA “suitable sample size” (9)At least 28 litres a minute (9.17)Set case by case (4.47)
Hazardous processesFull-duration grade A monitoring “except where justified”; set-up and simulated operations (9)Classification assured “both prior to and post exposure to the risk”; more viable monitoring considered; simulated operations (9.20)Full duration “except where duly justified”; set-up before exposure and simulated operations (4.51)
Grade A viable airMonitoring “frequent” in aseptic operations (18)Continuous by air sampling or settle plates, set-up included (9.24)Continuous during critical operations with product exposed (4.58)
OrganismsNo identification askedGrades A and B to species (9.31)Grade A to species (4.61)
TrendingNo trending asked; limits with corrective action (20)Named trend types, within a CCS (9.1, 9.11)Results “should be trended” (4.43)

PI 058-⁠1, in force since 28 October 2026, is agreed with the EU and WHO and adds no requirements.2 EMA plans to align Part IV with the current Annex 1, with a draft planned for September 2026, comments by December 2026 and adoption in March 2027; on 9 November 2026 neither EMA’s nor the Commission’s list of open consultations included it.6,7,8 In the UK, MHRA lists EudraLex Volume 4 among published GMP guidance.9

6What inspectors cite.

FDA cites monitoring failures under 21 CFR 211.42(c)(10), which requires aseptic processing areas to have “a system for monitoring environmental conditions”.10 Three recent warning letters show four failures: probe position, location rationale, sample tubing and data review before release.

“In addition, your nonviable particle monitor was placed on top of the enclosed cabinet in which filling occurred instead of inside it, rendering the resulting data non-representative of the environmental conditions near the areas of critical exposure on the aseptic processing line. Finally, you failed to routinely review environmental monitoring data prior to batch release.” BRS Analytical Services, LLC, warning letter, 17 September 202511
“The locations identified for EM in ISO 5 and ISO 7 areas lacked scientific justification and were not sufficiently located where the aseptic operations are taking place.” Daewoo Pharmaceutical Co., Ltd., warning letter, 2 July 202512
“You failed to demonstrate that your sample collection apparatus (using tubing (b)(4) long with (b)(4) bends) provides meaningful and representative samples.” Par Health USA, LLC and Endo USA, Inc., warning letter, 15 April 202613

7How FDA and WHO compare.

FDA’s monitoring expectations sit in its 2004 aseptic processing guidance, which is not binding and is still listed as final.14,15 Three points differ most from Annex 1.

Table 6. Sources: Annex 1 9.17, 9.25 and Tables 5 and 6;1 FDA guidance sections IV.A, V.C and X.A.14
TopicEU Annex 1FDA aseptic guidance
Grade A particles0.5 and 5 µm, continuously, at 28 litres a minute or more0.5 µm only, normally within 1 foot of the work, regularly in each shift
PersonnelAfter critical interventions and at each grade B exitEach operator’s gloves daily or with each lot
Settle platesCounted against limits, at most 4 hoursOptional; “qualitative, or semi-quantitative” air monitors, with recommended action levels

WHO’s 2022 sterile products text was revised “in collaboration with the European Union” and PIC/S, and its Tables 5 and 6 match Annex 1.16 What is EU GMP Annex 1 covers the wider comparison.

8How it runs in Seal.

In Seal, environmental monitoring keeps each sample with its location, collection window, sampled volume, media and incubation, so the collection time, not the read date, finds the batches and interventions it overlapped. Seal keeps that comparison as an assessment of which work overlapped and why each candidate is included or excluded; impact and disposition stay with the people responsible. A missed or invalid sample is recorded as its own outcome rather than a zero, and a change to the sampling plan becomes a new version with its own approval. The microbiology LIMS keeps plates, organisms, locations and batches in one context.

Neil, Seal’s AI agent, can compare environmental monitoring results against sampling exposure, locations and operational context, and draft a trend assessment with its sampling population. Microbiology and QA assess each result against its alert and action limits.

AQuestions and answers

Does Annex 1 require continuous monitoring in grade B?

Grade A should be monitored continuously for particles and viable air throughout critical processing, by air sampling or settle plates for viable air. For grade B, Annex 1 recommends a similar particle monitoring system at a lower sampling frequency, with alarms when alert levels are exceeded, and says continuous viable monitoring should be considered based on the risk to aseptic processing. The risk assessment records the choice and the reason.

How long can settle plates be exposed?

In grades A and B, settle plates cover the whole operation, including set-up, and are changed after at most four hours, with the exposure time based on validation and recovery studies. In grades C and D, exposure time and frequency follow quality risk management, still within four hours.

How often should grade C and D cleanrooms be monitored?

Annex 1 sets no fixed frequency for them. Monitoring of grade C and D in operation is based on data from qualification and routine monitoring, through the same risk assessment that sets locations and methods, and settle plate exposure and frequency there follow quality risk management. The sampling plan on this page samples grade C weekly and grade D monthly as an illustration, not a rule.

Who should take environmental monitoring samples?

Manufacturing staff may take routine samples, under regular oversight by the quality unit. Sampling should not compromise the process: after gloves are sampled following a critical intervention, the outer gloves are replaced before work continues, and a sampled gown is replaced before further activity in the cleanroom.

What incubation conditions does Annex 1 require for environmental monitoring plates?

Annex 1 does not fix them. The risk assessment that sets sampling locations and frequency also sets incubation time, temperature or temperatures, and aerobic or anaerobic conditions, from knowledge of the process, the facility and the organisms usually found there. Media are tested for growth promotion before use, including representative local isolates. The example plan on this page incubates at two temperatures in sequence; that is a choice the risk assessment has to justify, not a rule.

References16 sources

References

  1. 1EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products, C(2022) 5938 final, European Commission, 22 August 2022, document history, scope and points 3.2, 4.15, 4.16, 4.21, 4.24, 5.9, 7.6, 9.1 to 9.31, 9.36, 10.9, 10.10, Tables 1, 5 and 6 and glossary. https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf (read 9 November 2026)
  2. 2PI 058-⁠1, Interpretation of the Most Important Changes in the Annex 1 on the Manufacture of Sterile Products (2022), PIC/S, adopted 16 October 2026, in force 28 October 2026, sections 1 and 2 and questions 4.27, 9.9, 9.17 and 9.30 and the two questions on 9.22. https://picscheme.org/docview/11495 (read 9 November 2026)
  3. 3EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products (corrected version), European Commission, 25 November 2008, document history and points 4, 9, 18, 19 and 20, archived copy. https://web.archive.org/web/20221216103020/https://health.ec.europa.eu/system/files/2016-11/2008_11_25_gmp-an1_en_0.pdf (read 9 November 2026)
  4. 4EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 9 November 2026)
  5. 5Guidelines on Good Manufacturing Practice specific to Advanced Therapy Medicinal Products, EudraLex Volume 4, Part IV, C(2017) 7694 final, European Commission, 22 November 2017, introduction and points 4.43 to 4.61. https://health.ec.europa.eu/document/download/ad33d9dd-03f0-4bef-af53-21308ce2187d_en?filename=2017_11_22_guidelines_gmp_for_atmps.pdf (read 9 November 2026)
  6. 6Concept paper on the revision of Part IV Guidelines on Good Manufacturing Practice specific to Advanced Therapy Medicinal Products, EMA/INS/GMP/48771/2025, EMA GMP/GDP Inspectors Working Group, agreed 15 April 2025, sections 1, 2 and 4. https://www.ema.europa.eu/system/files/documents/scientific-guideline/concept-paper-revision-part-iv-gmp-specific-atmp-guidelines-good-manufact_en.pdf (read 9 November 2026)
  7. 7Open consultations, European Medicines Agency. https://www.ema.europa.eu/en/news-events/open-consultations (read 9 November 2026)
  8. 8Consultations, upcoming and open, Public Health, European Commission. https://health.ec.europa.eu/consultations_en (read 9 November 2026)
  9. 9Medicines: good manufacturing practice and good distribution practice, MHRA, GOV.UK, last updated 13 May 2024, overview. https://www.gov.uk/guidance/good-manufacturing-practice-and-good-distribution-practice (read 9 November 2026)
  10. 1021 CFR 211.42(c)(10)(iv), Design and construction features, eCFR, current to 5 November 2026. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-C/section-211.42 (read 9 November 2026)
  11. 11BRS Analytical Services, LLC, warning letter 320-⁠25-⁠112, MARCS-⁠CMS 711133, FDA, 17 September 2025. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/brs-analytical-services-llc-711133-09172025 (read 9 November 2026)
  12. 12Daewoo Pharmaceutical Co., Ltd., warning letter 320-⁠25-⁠86 (amended), MARCS-⁠CMS 706371, FDA, 2 July 2025. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/daewoo-pharmaceutical-co-ltd-706371-07022025 (read 9 November 2026)
  13. 13Par Health USA, LLC and Endo USA, Inc., warning letter 320-⁠26-⁠68, MARCS-⁠CMS 722121, FDA, 15 April 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/par-health-usa-llc-endo-usa-inc-722121-04152026 (read 9 November 2026)
  14. 14Guidance for Industry: Sterile Drug Products Produced by Aseptic Processing, Current Good Manufacturing Practice, FDA, September 2004, sections IV, V.C and X.A. https://www.fda.gov/media/71026/download (read 9 November 2026)
  15. 15Sterile Drug Products Produced by Aseptic Processing, Current Good Manufacturing Practice, guidance document page, FDA, October 2004, final, docket FDA-⁠2003-⁠D-⁠0145. https://www.fda.gov/regulatory-information/search-fda-guidance-documents/sterile-drug-products-produced-aseptic-processing-current-good-manufacturing-practice (read 9 November 2026)
  16. 16WHO good manufacturing practices for sterile pharmaceutical products, WHO Technical Report Series No. 1044, Annex 2, World Health Organization, 2022, background and section 9. https://cdn.who.int/media/docs/default-source/medicines/norms-and-standards/guidelines/production/trs1044-annex-2-gmp-for-sterile-pharmaceutical-products.pdf?sfvrsn=d924ed65_1&download=true (read 9 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.