Skip to main content

How do you choose an eQMS, and what should its requirements include?

Choose an eQMS from the quality processes you run and the rules behind them: 21 CFR 211, EU GMP Chapter 1 and ICH Q10 for medicines, the QMSR and ISO 13485 for devices. Turn them into requirements with the Part 11 and Annex 11 controls, then trial each shortlisted system on one of your own deviations, through investigation, CAPA, change and training. Check how the supplier tests and ships releases, and agree how every record comes back if you leave.Checked against its sources on 9 November 2026. How these answers are made

Illustration of a seal beside an open evidence folio containing SOP, training and execution records.

1How to choose an eQMS, step by step.

An eQMS runs processes your quality system already has to run, so its requirements come from the rules for that system, not from a supplier’s module list. EU GMP says the size and complexity of a company’s activities should shape its quality system, so a process you do not run yet does not need software on day one.1

  1. List your processes and their rules. QA leads as process owner, with IT as system owner and the people who run each process; Annex 11 asks for close cooperation between them.2 Use the checklist below. Record: the scope and the user requirements specification; see how to write a URS.
  2. Rate each requirement by risk. QA and the process owners do this. Annex 11 bases requirements on documented risk assessment and GMP impact.2 For device makers, FDA’s software assurance guidance counts CAPA routing, complaint logging, change control management and procedure management as generally not high process risk, so testing effort can go where a failure could compromise safety. FDA finalised that guidance in September 2025 and revised it for the QMSR on 3 February 2026.3 Record: the risk assessment.
  3. Shortlist from written answers. QA and IT send the requirements to each supplier and ask whether each line is standard, configured, customised or not available. Record: the responses.
  4. Trial on your own records. The people who run each process work through the script below in each shortlisted system, in a test environment with copies of your records, your roles and your signatures. QA scores it by the rule under the script. Record: the completed scripts.
  5. Assess the supplier, its releases and its exit terms. QA and IT, with the supplier checklist below. Record: the supplier assessment and agreement, which feed the validation plan and the implementation plan.

2An eQMS requirements checklist for drugs and devices.

For medicines, the requirements sit in 21 CFR 211, EU GMP Chapter 1 and ICH Q10. For devices, the Quality Management System Regulation (QMSR) has since 2 February 2026 incorporated ISO 13485:2016 into 21 CFR Part 820, and FDA’s inspection programme maps each process to its clause.1,4,5,6 A company making both needs both columns. A combination product maker can instead meet one set and add the provisions of the other that 21 CFR 4.4(b) lists: for a drug-led system, device clauses such as design, purchasing, complaints and CAPA.7

Table 1. eQMS requirements checklist. Device entries are the 21 CFR sections and ISO 13485 clauses that FDA’s QMSR inspection programme lists for the matching element, with Part 11 for record controls and data.8,9,10,11,12,13,14,15,16,17,18,19,20,21
ProcessThe eQMS mustMedicinesDevices (QMSR)
DeviationsRecord and justify each one; investigate, extending to other batches and products211.100(b); 211.192; Ch1 1.4(xiv)8.3.1 to 8.3.4
CAPATrack actions and monitor their effectivenessCh1 1.4(xiv); Q10 3.2.28.5.2, 8.5.3
Change controlEvaluate and approve before, review afterCh1 1.4(xii), (xiii); Q10 3.2.3; 211.100(a)4.1.4, 7.3.9, 7.5.6
ComplaintsRecord each one; decide on investigation and reporting211.198; Ch1 1.8(xi)820.35(a); 8.2.2, 8.2.3
DocumentsApprove and date each version; review documents regularly211.100(a); Ch4 4.3, 4.5820.35; 4.2.4, 4.2.5
TrainingTrain each person for their duties, assess its effectiveness, keep records211.25(a); Ch2 2.116.2
SuppliersApprove and monitor suppliers; justify reliance on their analyses211.84(d)(2); Ch1 1.4(vi); Q10 2.77.4.1
Internal auditPlan, record and follow up auditsCh1 1.4(xvii); Ch9 9.1, 9.38.2.4
Management reviewReview the system and record decisionsQ10 4.15.6.1 to 5.6.3
Product reviewTrend quality data, for medicines at least annually211.180(e); Ch1 1.108.4
Record controlsUnique logins, audit trails, signatures, complete copies11.10, 11.50; Annex 11, 9, 12, 1411.10, 11.50
Data and continuityBack up and test restores; check migrated and interfaced data keep their value and meaning; keep working through an outage211.68(b); Annex 11, 4.8, 5, 7.2, 1611.10(c)
The eQMS itselfBe validated for its intended use211.68(b); FDA Q&A 3; Annex 114.1.6

Two device changes in 2026 shape the requirements. FDA can now inspect management review, quality audit and supplier audit reports, because the QMSR did not keep the old exemption in 820.180(c), so the eQMS has to produce them as records ready for an investigator; see what FDA can now see.22 And inspections since 2 February 2026 follow compliance programme 7382.850, which lists “QMS Software Validation”, clause 4.1.6, under management oversight and treats change control as an inspection area of its own.5,6

3Example: a trial on one deviation.

Example, invented: a team runs the same deviation through each shortlisted eQMS with its own procedures, roles and signatures. DEV-⁠26-⁠044: the blend for Batch 26-⁠031 of Product X tablets was held 54 hours against a validated limit of 48 hours, 6 hours over.

Table 2. Example: a trial script for one deviation, with pass criteria. Step 1’s “not retyped” is a usability test, not a rule.
StepDo thisPass ifBasis
1. RaiseOpen DEV-⁠26-⁠044 from Batch 26-⁠031Batch, product, step and people linked, not retyped211.100(b)
2. ClassifyRate it by your risk procedureRating and rationale recorded, locked once approvedQ10 3.2.2
3. ExtendFind other batches held over 48 hoursSearch across batches and products; affected ones linked211.192
4. Root causeRecord operator error as the causeThe record asks why system causes were ruled outCh1 1.4(xiv)
5. CAPAOpen CAPA-⁠26-⁠019 with an effectiveness checkCheck scheduled; closure needs its evidenceCh1 1.4(xiv)
6. ChangeRaise CC-⁠26-⁠007 to add a 40-hour hold alert to the blend procedureApproved before implementation, reviewed afterCh1 1.4(xii), (xiii)
7. TrainingApprove the revised procedureTraining assigned to the affected roles211.25(a)
8. SignTry to approve your own investigationBlocked where your procedure needs independence; signature shows name, date, time and meaning11.10(g); 11.50
9. EditChange the root cause after approvalOriginal kept; reason, person and time in the audit trail11.10(e); Annex 11, 9
10. TrendCount hold-time deviations for the product reviewDEV-⁠26-⁠044 counted under its cause211.180(e); Ch1 1.10
11. ExportExport DEV-⁠26-⁠044 with its linked recordsComplete and readable, audit trail included11.10(b)

Score each step pass or fail in each system. On this page’s view, a fail at step 8, 9 or 11 rules a system out, because Part 11 requires the system itself to provide authority checks, signature details, computer-generated audit trails and complete copies;18,19 fails elsewhere are gaps to close by configuration before you sign, and their count ranks the rest.

The test is the joins. Steps 3 and 5 to 7 are where separate CAPA, change and training modules break the chain: Chapter 1 expects CAPA effectiveness to be “monitored and assessed”, and each change to be evaluated after implementation “to confirm the quality objectives were achieved”.1 A device maker runs the same script on a nonconformance or a complaint; an investigated complaint then needs what 820.35(a) lists, any UDI or UPC included.17

4Supplier assessment checklist: releases, evidence and exit.

In FDA’s worked example for device makers of a software-as-a-service system, the supplier assessment covers the first four rows below; the vendor then documents “the changes, testing, and testing results of all automatic updates”, the manufacturer tests each change in proportion to its effect on the intended use, and a service agreement covers security, data integrity, privacy, availability, change management and business continuity.3 Annex 11 makes a supplier’s competence and reliability “key factors” and expects its quality system and audit information to be available to inspectors on request.2

Table 3. Supplier assessment checklist. The draft Annex 11 was consulted on from 7 July to 7 October 2025 and is not in force.24
CheckAsk the supplier forBasis
DevelopmentIts software development life cycleFDA CSA, SaaS example3
Quality systemIts quality management system and certifications; an audit if your risk assessment calls for oneFDA CSA; Annex 11, 3.2 and 3.42
CybersecuritySecurity documentation and life cycle management plansFDA CSA3
InfrastructureAvailability and reliability; backups and a tested restoreFDA CSA; Annex 11, 7.22
ReleasesA real release note with its test evidence; notice, and the chance to test before releaseFDA CSA; draft Annex 11, 7.5(ix)23
Contract termsService levels, audit conditions, support during inspections, how quality and security issues are reportedAnnex 11, 3.1;2 draft Annex 11, 7.5(iii) to (vii)23
ExitA full export of a test deviation with its audit trail and signatures, readable without the supplierAnnex 11, 17;2 draft Annex 11, 7.5(viii)23

The 2011 annex remains in force, and EMA’s inspectors aim to give the Commission a final text in the fourth quarter of 2026.25,26 ICH Q10 asks for the other party’s suitability and competence to be assessed before work is outsourced.4 The supplier’s validation evidence is a starting point, not the finish: PIC/S expects end-user testing to show the software “not only meets the requirements of the vendor, but is fit for its intended use”; see validating a SaaS system.27

5What FDA has cited.

In your response, your firm stated that your complaint handling system has been in use for a few years and has “proven to be effective.” However, your firm has not provided evidence of the effectiveness of this complaint handling system.

Vitang Technology, warning letter of 12 June 2023, about a web application used to maintain complaint files, cited for failing to validate “software used as part of the quality system”. Years of use are not validation.28 That letter cited 21 CFR 820.70(i), which the QMSR removed; for devices the requirement now sits in ISO 13485 clause 4.1.6.3,6

your firm utilized a common username and password to access high performance liquid chromatography (HPLC) equipment used for impurity testing of drug products. Additionally, analysts had administrator privileges to modify and delete data.

Ava Inc., warning letter 320-⁠26-⁠64 of 14 April 2026, cited under 211.68(b). The firm replied that a software update had let users bypass “User-⁠Security Access Restrictions”, and FDA found the response inadequate.29 That was laboratory software, but the same two questions apply to an eQMS: who holds administrator rights, and how each update is tested before it reaches you.

6Where eQMS selections go wrong.

  • Licences for too few people. Everyone who signs a training record, a deviation or an approval needs their own login. MHRA says individual logins must be used where the system supports them, even though this “may require the purchase of additional licences”, and FDA says a shared login cannot identify who acted.30,21 Price the system for every signer, operators included; what an eQMS costs has a three-year budget.
  • Validating the platform, not the workflows. FDA treats each CGMP workflow as an intended use to validate, so each deviation, CAPA or change workflow you configure needs its own evidence, beyond the supplier’s platform testing.21
  • No plan for the review after go-live. Annex 11 expects periodic evaluation covering upgrade history and validation status, among other things, so a system that changes with every release needs a review cycle that keeps up.2
  • Taking AI drafts on trust. If the system drafts investigations or classifies events with AI, run that in the trial and check that a named QA approver has to review and clear the output before it counts. FDA told Purolea Cosmetics Lab in April 2026 that “any output or recommendations from an AI agent must be reviewed and cleared by an authorized human representative of your firm’s QU”.31 Draft Annex 22, not in force, says generative AI and large language models “should not be used in critical GMP applications”, and that in non-critical uses qualified, trained people should always be responsible for their output.32,25 See AI in deviations and CAPA and Annex 22.

7How it runs in Seal.

Seal’s eQMS comparison sets out what to check when choosing: whether a deviation opens from the batch or test it concerns, whether a CAPA is judged on the runs that follow, whether each change to a workflow is released with its own tests and approvals, and whether your own team configures it. Seal’s quality system covers deviations, CAPA, change control, documents, training, audits, suppliers, complaints and risk, and each event opens with its evidence, read from Seal or from the ERP, LIMS, MES and training systems you already run; see quality management in Seal.

You can start with one quality workflow in a 48-hour evaluation, beside the eQMS you already run. Seal connects to documents, deviations, CAPAs and change controls in Veeva Vault QMS, MasterControl, Qualio and ETQ Reliance, and each connection is scoped before it goes live, including whether anything is written back.

AQuestions and answers

What modules should an eQMS have?

The ones your quality system runs. EU GMP and ICH Q10 expect a medicines manufacturer to manage deviations and CAPA, change control, documents, training, complaints, suppliers, internal audit and management review, so those are the usual starting set. A small company can start with the processes it has and add others as it grows, as long as each is validated for its use.

Should a small biotech buy the same eQMS as a large pharma company?

Not necessarily. EU GMP says the size and complexity of a company’s activities should shape its quality system. Choose for the processes you run and the products you make now, and check that the system can grow and change under control as you add products, sites or phases.

Should closed records move into the new eQMS?

Not necessarily. Open records and those you will keep working with usually move; closed records can stay in the old system or an archive, as long as they remain accessible, readable and intact for their retention period. Whatever you migrate has to be checked to show its values and meaning did not change on the way.

Can our own QA team configure the eQMS?

Yes, if configuration is controlled. Document the configuration, make each change through change control, and test configured workflows before they go live. Ask the supplier which changes your team can make itself and which need its services, because that decides how quickly a CAPA can change a workflow.

References32 sources

References

  1. 1EudraLex Volume 4, Chapter 1: Pharmaceutical Quality System, European Commission, in operation since 31 January 2013, paragraphs 1.3, 1.4, 1.8 and 1.10. https://health.ec.europa.eu/document/download/e458c423-f564-4171-b344-030a461c567f_en?filename=vol4-chap1_2013-01_en.pdf (read 9 November 2026)
  2. 2EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, sections 2, 3, 4, 5, 7, 9, 11, 12, 14, 16 and 17, European Commission, in operation since 30 June 2011. https://health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf (read 9 November 2026)
  3. 3Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, section I, section V and Appendix A, Example 4, FDA, 3 February 2026. https://www.fda.gov/media/188844/download (read 9 November 2026)
  4. 4ICH Q10, Pharmaceutical Quality System, ICH, Step 4, 4 June 2008, sections 2.7, 3.2.2, 3.2.3 and 4.1. https://database.ich.org/sites/default/files/Q10%20Guideline.pdf (read 9 November 2026)
  5. 5Quality Management System Regulation (QMSR), FDA, updated 2 February 2026. https://www.fda.gov/medical-devices/postmarket-requirements-devices/quality-management-system-regulation-qmsr (read 9 November 2026)
  6. 6Compliance Program 7382.850, Inspection of Medical Device Manufacturers, FDA, implementation date 2 February 2026, Attachment A. https://www.fda.gov/media/80195/download (read 9 November 2026)
  7. 721 CFR 4.4, How can I comply with these current good manufacturing practice requirements for a co-packaged or single-entity combination product?, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-4/subpart-A/section-4.4 (read 9 November 2026)
  8. 8EudraLex Volume 4, Chapter 9: Self Inspection, European Commission, paragraphs 9.1 and 9.3. https://health.ec.europa.eu/document/download/07195808-d02e-4d7a-b8f4-f84a83278b62_en?filename=cap9_en.pdf (read 9 November 2026)
  9. 9EudraLex Volume 4, Chapter 2: Personnel, European Commission, in operation since 16 February 2014, paragraph 2.11. https://health.ec.europa.eu/system/files/2016-11/2014-03_chapter_2_0.pdf (read 9 November 2026)
  10. 1021 CFR 211.100, Written procedures; deviations, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-F/section-211.100 (read 9 November 2026)
  11. 1121 CFR 211.192, Production record review, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-J/section-211.192 (read 9 November 2026)
  12. 1221 CFR 211.198, Complaint files, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-J/section-211.198 (read 9 November 2026)
  13. 1321 CFR 211.25, Personnel qualifications, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-B/section-211.25 (read 9 November 2026)
  14. 1421 CFR 211.84, Testing and approval or rejection of components, drug product containers, and closures, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-E/section-211.84 (read 9 November 2026)
  15. 1521 CFR 211.180, General requirements (records and reports), eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-J/section-211.180 (read 9 November 2026)
  16. 1621 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-D/section-211.68 (read 9 November 2026)
  17. 1721 CFR 820.35, Control of records, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-H/part-820/subpart-B/section-820.35 (read 9 November 2026)
  18. 1821 CFR 11.10, Controls for closed systems, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-11/subpart-B/section-11.10 (read 9 November 2026)
  19. 1921 CFR 11.50, Signature manifestations, eCFR. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-11/subpart-B/section-11.50 (read 9 November 2026)
  20. 20EudraLex Volume 4, Chapter 4: Documentation, European Commission, in operation since 30 June 2011. https://health.ec.europa.eu/system/files/2016-11/chapter4_01-2011_en_0.pdf (read 9 November 2026)
  21. 21Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, questions 3 and 5. https://www.fda.gov/media/119267/download (read 9 November 2026)
  22. 22Quality Management System Regulation: Frequently Asked Questions, FDA, question 8. https://www.fda.gov/medical-devices/quality-management-system-regulation-qmsr/quality-management-system-regulation-frequently-asked-questions (read 9 November 2026)
  23. 23Annex 11: Computerised Systems, draft revision for consultation, European Commission and PIC/S, July 2025, section 7.5. https://health.ec.europa.eu/document/download/40231f18-e564-4043-94de-c031f813d38b_en?filename=mp_vol4_chap4_annex11_consultation_guideline_en.pdf (read 9 November 2026)
  24. 24Stakeholders’ consultation on EudraLex Volume 4, Good Manufacturing Practice guidelines: Chapter 4, Annex 11 and new Annex 22, European Commission, July 2025. https://health.ec.europa.eu/consultations/stakeholders-consultation-eudralex-volume-4-good-manufacturing-practice-guidelines-chapter-4-annex_en (read 9 November 2026)
  25. 25EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https://health.ec.europa.eu/medicinal-products/eudralex/eudralex-volume-4_en (read 9 November 2026)
  26. 26The 3-year work plan for the Inspectors Working Group, January 2026 to December 2028, European Medicines Agency, 2026. https://www.ema.europa.eu/en/documents/other/3-year-work-plan-inspectors-working-group_en.pdf (read 9 November 2026)
  27. 27PI 041-⁠1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, section 9.3. https://picscheme.org/docview/4234 (read 9 November 2026)
  28. 28Warning Letter to Vitang Technology LLC, MARCS-⁠CMS 653455, FDA, 12 June 2023. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/vitang-technology-llc-653455-06122023 (read 9 November 2026)
  29. 29Warning Letter 320-⁠26-⁠64 to Ava Inc., MARCS-⁠CMS 721180, FDA, 14 April 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/ava-inc-721180-04142026 (read 9 November 2026)
  30. 30‘GXP’ Data Integrity Guidance and Definitions, Revision 1, MHRA, March 2018, section 6.16. https://assets.publishing.service.gov.uk/media/5aa2b9ede5274a3e391e37f3/MHRA_GxP_data_integrity_guide_March_edited_Final.pdf (read 9 November 2026)
  31. 31Warning Letter 320-⁠26-⁠58 to Purolea Cosmetics Lab, MARCS-⁠CMS 722591, FDA, 2 April 2026. https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/purolea-cosmetics-lab-722591-04022026 (read 9 November 2026)
  32. 32Annex 22: Artificial Intelligence, draft for consultation, European Commission and PIC/S, July 2025, section 1. https://health.ec.europa.eu/document/download/5f38a92d-bb8e-4264-8898-ea076e926db6_en?filename=mp_vol4_chap4_annex22_consultation_guideline_en.pdf (read 9 November 2026)

See your process in Seal.

Bring a procedure or a recurring problem. See how your team configures it with Neil and improves the next run.