1How often equipment needs requalification.
No GMP regulation or guideline sets one requalification interval for equipment. EU GMP Annex 15 asks for equipment, facilities, utilities and systems to be evaluated “at an appropriate frequency to confirm that they remain in a state of control”, and where requalification runs on a fixed period, “the period should be justified and the criteria for evaluation defined. Furthermore, the possibility of small changes over time should be assessed.”1 PIC/S: “The frequency of the review process should be justified based on quality risk management principles including equipment criticality.”2 WHO lists the factors to weigh: “frequency of use, breakdowns, results of operation, criticality, preventive maintenance, repairs, calibration, and verification”.3 FDA expects qualification data to “be assessed periodically to determine whether re-qualification should be performed and the extent of that re-qualification.”4
So most equipment runs on two clocks: a periodic review at a justified interval, which decides whether to requalify, and events between reviews that call for an assessment. In these texts, fixed intervals appear only for sterile manufacture.
| Equipment | Interval | Source |
|---|---|---|
| Grade A and B cleanrooms and clean air equipment | Requalify at most every 6 months | Annex 1 4.325 |
| Grade C and D cleanrooms and clean air equipment | Requalify at most every 12 months | Annex 1 4.325 |
| Heat sterilization, worst-case load patterns | Revalidate at least annually; other loads at a frequency justified in the contamination control strategy | Annex 1 8.38, 8.395 |
| Depyrogenation tunnel supply air filters | HEPA integrity tests “at least biannually” | Annex 1 8.675 |
| HEPA filters in an aseptic processing room (US) | Leak tests, for example twice a year | FDA aseptic guidance6 |
| Sterilizers (US) | Requalification “on a periodic basis”, no interval set | FDA aseptic guidance6 |
| Automatic, mechanical and electronic equipment (US) | Calibrated, inspected or checked under a written program; no interval set | 21 CFR 211.68(a)7 |
| HVAC for non-sterile products | No interval; set by risk, type of facility, product protection needed, system performance and routine monitoring | WHO TRS 1010 Annex 8, 12.98 |
| All other equipment, utilities, facilities and systems | Review at a risk-justified interval; requalify when the review shows the need | Annex 15 4.1, 4.2;1 PI 006-4 4.4.2, 4.4.3;2 WHO TRS 1019 Appendix 6, 11.23 |
Annex 1 also sets the minimum cleanroom requalification tests: classification by total particle concentration, integrity of final filters, airflow volume, pressure difference between rooms and air velocity. Grades B to D test velocity by risk assessment, except filling zones supplied with unidirectional airflow, where it is required; recovery testing replaces it where airflow is not unidirectional.5 Annex 1 does not define “biannually” in 8.67. The tunnel protects a grade A sterilizing zone, and grade A requalification, final filter integrity included, is due at most every 6 months (4.32): read 8.67 against that. Limits and methods are on cleanroom grades; sterilizer loads on F0 and steam sterilization.
Requalification need not repeat the whole IQ, OQ and PQ. The review sets its extent: usually the operational and performance tests that challenge whatever the evidence says may have drifted. That choice is practice; the rules ask only that the scope be decided and recorded.
2What triggers requalification between reviews.
A date is one trigger. Each of these events calls for a documented assessment, under change control, of whether to requalify and how far:
| Event | What to assess | Source |
|---|---|---|
| A change to equipment, a utility, facility, system or process | Impact on validation, calibration and maintenance, and any “necessary process validation, verification or requalification efforts”; in FDA’s words, change control “triggering an evaluation of the need for revalidation or requalification” | Annex 15 11.4;1 WHO 10.24;3 FDA aseptic guidance6 |
| A like-for-like replacement | It may stay in planned maintenance if “the ‘like for like’ decision is documented, justified, and is approved by the Quality Unit” | PI 006-4 4.4.12 |
| Several small changes | “Requalification should also be considered after cumulative/multiple changes.” | WHO 10.26;3 PI 006-4 4.4.22 |
| Components or parts replaced | The scope and extent of requalification | WHO 10.273 |
| A long idle period | “requalification may have to be considered” | WHO 10.283 |
| Maintenance on sterile-critical equipment | “Upon completion of maintenance, their return to use should be approved.” Unplanned maintenance is assessed for its impact on sterility | Annex 1 5.6, 5.75 |
| Cleanroom remedial action or change | At least the Annex 1 tests after interrupted air movement, design or setpoint changes, or special maintenance such as a final filter change | Annex 1 4.325 |
A deviation pointing at the equipment, a critical instrument found out of tolerance or an adverse trend is an input to the review, and bringing the review forward for one is good practice. FDA gives the HEPA example: “Additional testing may be appropriate when air quality is found to be unacceptable”.6
3Periodic review checklist template.
Complete one review per item of equipment, utility or system, covering the period since its last qualification or review. PIC/S names the core evidence: “a review of all equipment changes, maintenance records as well as other quality system information or trending available for the equipment (e.g. associated deviations)”.2 WHO expects “The qualification status and periodic requalification due dates” to be documented, “for example, in a qualification matrix, schedule or plan”.3
| Check | What to record | Source |
|---|---|---|
| Identity and status | Equipment ID, intended use, criticality, last qualification report, qualified configuration, period reviewed | WHO Appendix 6, 11.63 |
| Interval | Current interval and its justification | Annex 15 4.2;1 PI 006-4 3.4.3, 4.4.32 |
| Changes | Each change control and like-for-like decision since the last qualification; whether together they amount to a major change | PI 006-4 4.4.1, 4.4.2;2 WHO 10.263 |
| Maintenance | Planned work done or deferred; breakdowns, repairs and parts replaced; return-to-use approvals | PI 006-4 4.4.2;2 WHO 10.25, 10.27;3 Annex 1 5.6, 5.75 |
| Calibration and verification | As-found results of critical instruments; each out-of-tolerance finding and its impact assessment | WHO 10.25, Appendix 6, 11.53 |
| Deviations and CAPA | Deviations, investigations and CAPA linked to the equipment, open and closed | PI 006-4 4.4.22 |
| Performance | Trends in process data, alarms and monitoring; for utilities, environmental and water results against alert levels | WHO 10.25;3 Annex 1 6.4, 6.135 |
| Use | How often it ran; idle periods and how it was restarted | WHO 10.25, 10.283 |
| Products and loads | New products, components, load patterns or batch sizes outside the qualified range | Annex 1 8.38;5 FDA to Oasis Medical9 |
| Computerized control | Software, firmware and configuration changes; the control system’s own periodic evaluation | Annex 11 section 1110 |
| Product quality review | Whether the PQR shows the equipment working as expected | PI 006-4 4.4.42 |
| Conclusion | Remains qualified; or requalify, naming the tests and acceptance criteria; any change to maintenance or calibration frequency | WHO Appendix 6, 11.2, 11.3;3 FDA Stage 34 |
| Next review | Date; interval kept, shortened or extended, and why | Annex 15 4.21 |
| Approval | Reviewer and date; quality approval as the site’s quality system defines it; Quality Unit approval of each like-for-like decision | Annex 15 1.3;1 PI 006-4 4.4.12 |
The conclusion is a decision with its reasons, not a tick. A review can end in requalification even when every change was small: “The review process may determine that additional qualification studies are required as a series of minor changes may represent a major change over time.”2 It can also change the maintenance plan, since FDA expects that “Maintenance and calibration frequency should be adjusted based on feedback from these activities.”4 A worked review of a single dryer is on the EU GMP Annex 15 page.
4How it runs in Seal.
In Seal’s commissioning and qualification model, the qualified-state decision fixes the system boundary, configuration, software and firmware, requirements, risk and completed tests, and that baseline becomes the reference for change control, periodic review, maintenance, calibration and deviation impact. A proposed modification is compared with it to identify the requirements, tests, documents and training affected, and the approved impact sets the re-verification scope. Periodic review then evaluates changes, deviations, calibration and performance, so requalification follows risk and evidence rather than a calendar reminder alone.
The equipment record holds the asset’s identity, configuration, qualification and intended uses, with its calibration, maintenance and recorded uses over time. In maintenance, each plan carries its trigger, criticality and rationale; deferred work keeps its original due date, reason, risk assessment and authorization; and completing a repair does not return the asset to use, because return to service is a separate, authorized decision.
5Example: setting review intervals for four items.
This example is invented, and so is its scale: no regulation sets one. A site making tablets and an aseptically filled injectable scores each item 1 to 3 on six factors taken from WHO’s list and PIC/S’s criticality, then maps the total to a review interval. A fixed maximum from Annex 1 overrides the score.
| Factor | 1 | 2 | 3 |
|---|---|---|---|
| Criticality | No product contact, no quality attribute | Product contact, or sets a quality attribute | Sterility assurance, or water used in product |
| Frequency of use | Less than weekly | Weekly | Daily or continuous |
| Breakdowns and repairs, last 24 months | None | One or two | Three or more |
| Deviations and results of operation | None linked | Minor, no product impact | Major, or an adverse trend |
| Calibration and verification | All in tolerance as found | One out of tolerance, no impact | More than one, or an impact |
| Changes since qualification | None, or like for like only | One minor change | Two or more, or a major change |
A total of 6 to 8 sets a 36-month review; 9 to 11, 24 months; 12 to 14, 12 months; 15 to 18, 6 months.
| Item | Scores, in scale order | Total | By score | Fixed maximum | Interval set |
|---|---|---|---|---|---|
| AC-02 steam sterilizer, aseptic components | 3, 3, 2, 1, 1, 1 | 11 | 24 months | 12 months for worst-case loads (Annex 1 8.39) | 12 months |
| PW-01 purified water system | 3, 3, 1, 3, 1, 1 | 12 | 12 months | None | 12 months |
| TP-05 rotary tablet press | 2, 3, 3, 2, 2, 2 | 14 | 12 months | None | 12 months |
| BB-01 bin blender | 2, 2, 1, 1, 1, 1 | 8 | 36 months | None | 36 months |
AC-02’s history alone would allow 24 months, but Annex 1 says: “Heat sterilization cycles should be revalidated with a minimum frequency of at least annually for load patterns that are considered worst case.” Its review runs with that revalidation.5 Its two repairs (a vacuum pump and a door seal) go into the review, which checks that each had its return to use approved. PW-01 scores 3 for an adverse trend in microbial counts at one point of use: the interval is 12 months, and the review decides whether that point needs added sampling. TP-05 scored 9, and 24 months, at its last review. Since then it had three breakdowns, two minor tablet weight deviations closed with no product impact, a compression force sensor found out of tolerance with no impact on results, and one minor change, a new feeder paddle design, under change control: 14, and 12 months. BB-01, a blender with a clean history, goes to 36 months.
A sum can hide one factor. A sterility-critical item used less than weekly with a clean history scores 3, 1, 1, 1, 1, 1: a total of 8 and a 36-month interval. Guard against it with a rule, such as no interval longer than 24 months for any item scoring 3 on criticality, and write the rule into the validation master plan, where PIC/S expects the “justification for the frequency of re-qualification”.2
6When a review fails, is overdue or finds unqualified equipment.
A failed requalification is a deviation to investigate before any repeat. Repeating runs until one passes is what FDA cites (see below).
An overdue review or requalification has no grace period in any of these texts. In practice, treat it as a deviation, assess what the equipment made after the due date, and do not let a fixed maximum, such as Annex 1’s 6 months for grades A and B, lapse while production continues.
For equipment found in use that was never qualified, WHO says “a qualification protocol should be prepared where elements of URS, design specifications, operation and performance are verified for acceptability”, with the outcome recorded in a report.3
Equipment returning after a long idle period should be assessed for requalification before use.3 So should a computerized controller after a software or firmware update; its periodic evaluation covers “deviation records, incidents, problems, upgrade history, performance, reliability, security and validation status reports”.10
An interval can be lengthened as well as shortened, if the reviews support it: Annex 15 asks only that the period be justified.1 Extend one step at a time after consecutive reviews with clean findings; never extend a fixed Annex 1 maximum. That rule of thumb is practice.
7What inspectors cite.
FDA cites requalification that ignores what has changed since the last one, and requalification runs repeated until they pass.
Oasis Medical, Inc., Glendora, sterile ophthalmic drugs, warning letter of 15 July 2025:9
“The most recently completed requalification study for your (b)(4) cycle was conducted in 2023 and inadequately considered potential changes from previous qualifications and the original validation. The 2023 requalification did not include an assessment of (b)(4) maintenance or changes to the drug product components.”
Baxter International Inc., for its Round Lake, Illinois sterile injectables site, warning letter of 29 September 2026. Its acceptance criteria “allowed routine recovery of multiple BI survivors per re-qualification run”, yet:11
“you considered all re-qualification studies to be acceptable and did not further evaluate the excessive variability”
“You allowed repetition of re-qualification cycles without proper investigation into observed BI growth.”
FDA also noted a “no-test” designation for a requalification attempt with numerous positive BIs. Island Kinetics, cited on 16 July 2026 for a system given a new point of use and a replaced tank “without adequate requalification”, is quoted on the IQ, OQ and PQ page.12
Before an inspection, have ready the qualification matrix or schedule with each item’s status and due date, the justification of each interval, the last review of each critical item with its conclusion, and the like-for-like decisions approved by Quality.3,
8How the rules differ, and what is changing.
| Rules | Interval | Source |
|---|---|---|
| EU and PIC/S GMP | Evaluate at an appropriate frequency; justify any fixed period | Annex 15 4.1, 4.2, in operation since 1 October 20151 |
| PIC/S recommendation | Review at predetermined intervals justified by criticality; frequency justified in the VMP; PQR statement on equipment | PI 006-4 3.4.3, 4.4, in force since 1 October 20262 |
| EU and PIC/S sterile | Fixed maxima for cleanrooms; worst-case heat sterilization loads at least annually | Annex 1, in operation since 25 August 20235 |
| WHO | Periodic review; due dates in a qualification matrix; “Where appropriate, periodic requalification may be performed.” | TRS 1019 Annex 3, 10.24 to 10.29, Appendix 6, 113 |
| US | No interval in the regulations: maintenance “at appropriate intervals”, automatic equipment checked under a written program; qualification data assessed periodically | 21 CFR 211.67(a), 211.68(a);13, |
| APIs | Periodic evaluation; normally no revalidation without significant change and with a confirming quality review | ICH Q7 12.6014 |
For APIs, ICH Q7: “Where no significant changes have been made to the system or process, and a quality review confirms that the system or process is consistently producing material meeting its specifications, there is normally no need for revalidation.”14
Annex 15 is being revised. The concept paper of 19 January 2026 plans “Emphasis on periodic review”, within its process validation changes, and a draft for consultation in December 2026, with publication by the European Commission planned for April 2028.15 Until then the 2015 text applies, alongside PI 006-4.
AQuestions and answers
Is periodic requalification of equipment mandatory?
A periodic evaluation is expected; a calendar requalification usually is not. EU GMP Annex 15 asks for evaluation at an appropriate frequency, and WHO says periodic requalification may be performed where appropriate. Requalify when the review, a change or a repair shows the need. The exceptions are EU GMP Annex 1’s maximum intervals for cleanrooms and its annual minimum for worst-case heat sterilization loads, which apply whatever the review finds.
Can a periodic review replace requalification?
It can conclude that none is needed. PIC/S expects reviews at predetermined intervals that may find further qualification studies are required, and FDA expects qualification data to be assessed periodically to decide whether to requalify and how far. For APIs, ICH Q7 says revalidation is normally not needed where nothing significant has changed and a quality review confirms consistent results. A review cannot replace Annex 1’s fixed cleanroom requalifications or its annual revalidation of worst-case heat sterilization loads.
What is the difference between requalification and revalidation?
Requalification applies to equipment, utilities, facilities and systems, and shows they remain in a qualified state. Revalidation applies to processes, procedures and methods, and shows they remain in a validated state. WHO treats them in separate sections with the same logic: done on identified need and risk, assessed through change control after changes, and periodic where appropriate. A requalified tablet press does not revalidate the process run on it.
How often should an autoclave be requalified?
Under EU GMP Annex 1, heat sterilization cycles are revalidated at least once a year for worst-case load patterns, and other loads at a frequency justified in the contamination control strategy. FDA’s aseptic guidance asks for periodic requalification without setting an interval. Leak tests, normally weekly for vacuum cycles, and air removal tests, normally daily for porous loads, are routine checks, not requalification. Assess the need sooner after a change, a repair or a replaced part.
How often should HVAC systems be requalified?
For cleanrooms making sterile products, EU GMP Annex 1 sets maxima of 6 months for grades A and B and 12 months for C and D, with particle classification, filter integrity, airflow volume, pressure difference and air velocity tests. For HVAC serving non-sterile products, WHO’s HVAC guideline sets no interval: base it on risk, the type of facility, the protection the product needs, the system’s performance and the routine monitoring. Assess requalification after changes, and leak-test each replaced HEPA filter.
References15 sources
References
- 1EudraLex Volume 4, Annex 15: Qualification and Validation, sections 1.3, 4.1, 4.2 and 11.4, European Commission, in operation since 1 October 2015. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ 2015- 10_ annex15_ 0. pdf (read 25 November 2026) - 2PI 006-4, Recommendations on Qualification and Validation, sections 3.4.3 and 4.4.1 to 4.4.4, PIC/S, 1 October 2026. https:/
/ picscheme. org/ docview/ 11277 (read 25 November 2026) - 3Good manufacturing practices: guidelines on validation, Annex 3, sections 10.24 to 10.29, and Appendix 6, Guidelines on qualification, section 11, WHO Technical Report Series No. 1019, WHO, 2019. https:/
/ cdn. who. int/ media/ docs/ default- source/ medicines/ norms- and- standards/ guidelines/ production/ trs1019- annex3- gmp- validation. pdf (read 25 November 2026) - 4Process Validation: General Principles and Practices, Guidance for Industry, Revision 1, section IV.D, Stage 3, FDA, January 2011. https:/
/ www. fda. gov/ files/ drugs/ published/ Process- Validation- - General- Principles- and- Practices. pdf (read 25 November 2026) - 5EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products, C(2022) 5938 final, sections 4.32, 5.6, 5.7, 6.4, 6.13, 8.38, 8.39, 8.60, 8.61 and 8.67, European Commission, 22 August 2022, in operation since 25 August 2023. https:/
/ health. ec. europa. eu/ system/ files/ 2022- 08/ 20220825_ gmp- an1_ en_ 0. pdf (read 25 November 2026) - 6Sterile Drug Products Produced by Aseptic Processing: Current Good Manufacturing Practice, Guidance for Industry, sections IV.D and IX, FDA, September 2004. https:/
/ www. fda. gov/ media/ 71026/ download (read 25 November 2026) - 721 CFR 211.68, Automatic, mechanical, and electronic equipment, paragraph (a), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 68 (read 25 November 2026) - 8Guidelines on heating, ventilation and air-conditioning systems for non-sterile pharmaceutical products, Annex 8, sections 12.9, 12.10 and 13.6, WHO Technical Report Series No. 1010, WHO, 2018. https:/
/ cdn. who. int/ media/ docs/ default- source/ medicines/ norms- and- standards/ guidelines/ production/ trs1010- annex8- who- gmp- heating- ventilation- airconditioning. pdf (read 25 November 2026) - 9Oasis Medical, Inc., warning letter 320-25-93, MARCS-CMS 707198, FDA, 15 July 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ oasis- medical- inc- 707198- 07152025 (read 25 November 2026) - 10EudraLex Volume 4, Annex 11: Computerised Systems, section 11, European Commission, in operation since 30 June 2011. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 25 November 2026) - 11Baxter International Inc., warning letter 320-26-132, MARCS-CMS 733231, FDA, 29 September 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ baxter- international- inc- 733231- 09292026 (read 25 November 2026) - 12Island Kinetics, Inc. d.b.a. CoValence Laboratories, warning letter 320-26-104, MARCS-CMS 726379, FDA, 16 July 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ island- kinetics- inc- dba- covalence- laboratories- 726379- 07162026 (read 25 November 2026) - 1321 CFR 211.67, Equipment cleaning and maintenance, paragraph (a), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 67 (read 25 November 2026) - 14ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients, section 12.60, ICH, 10 November 2000. https:/
/ database. ich. org/ sites/ default/ files/ Q7%20Guideline. pdf (read 25 November 2026) - 15Concept paper on the revision of the guidelines on Good Manufacturing Practice for medicinal products, Annex 15, Qualification and Validation, EMA/
INS/ GMP/ 163466/ 2026, sections 2 and 4, EMA GMP/GDP Inspectors Working Group, 19 January 2026. https:/ / www. ema. europa. eu/ system/ files/ documents/ scientific- guideline/ concept- paper- annex- 15_ revised- timetable- en. pdf (read 25 November 2026)