Prepare a process-capability data review.

Check population stability, specification versions and measurement context before interpreting process-capability calculations.

Book a demo
Illustration of a seal comparing study vessels and their recorded response curves.

You: Prepare the capability analysis for these 40 batches. Can we calculate one Cpk?

neil

The mixing process changed after batch 24, leaving 24 pre-change and 16 post-change batches. Unchanged specification limits do not make those observations one stable process. I would inspect the time-ordered data and the change before choosing the analysis population.

Configuration change splits the data
Configuration change splits the data. 24, 16, Before change, After change. Example records.2416Before changeAfter change

You: What should be plotted first?

neil

The actual observations in time order, with the process change marked and rational subgroups preserved. I would check the measurement system, stability and distribution assumptions before reporting capability. The supplied counts alone cannot support a Cpk calculation or a claim of improvement.

You: Write this up for review, with the sources and the follow-up work we need.

neil

Here is the draft. I have kept the supported finding separate from the open questions, and prepared the evidence requests for the responsible roles.

CPV-211 analysis population and capability planReview draft · source evidence and assessment

CPV-211 analysis population and capability plan

The configuration change divides the dataset into 24 earlier batches and 16 later batches. Identical specification limits do not establish a single stable process across that boundary. Review time order, subgroup definitions and measurement context within each period before deciding whether pooling is justified. A capability index calculated from all 40 values could otherwise obscure the effect of the change.

Source evidence and search scope

CPV-211 (Measurement series); CHG-211 (Process change); SPEC-211 (Specification history)

CPV-211 / Measurement series

Recorded evidence
40 batches in time order

CHG-211 / Process change

Recorded evidence
Mixing configuration changed after batch 24

SPEC-211 / Specification history

Recorded evidence
Same numeric limits across both periods
Inputs needed for your own records
  • Time-ordered process measurements with subgroup identifiers
  • Specification versions and measurement-system evidence
  • Process changes, exclusions and the approved analysis approach

A qualified reviewer determines the suitable statistical approach and verifies stability and assumptions. A single pooled capability number may be misleading.

Fictional source snapshots. No live query, assignment or approval.

Follow-up work and evidence requests2 proposed tasks · not assigned

Evidence to request

Assess stability and subgroup structure
Process statistician
Obtain the 40 individual observations, measurement context and subgroup identities. Examine the pre- and post-change populations separately.
Document the process-change boundary
Process owner
Link CHG-211 to actual implementation and explain any transition batches before selecting data for a capability conclusion.
Example conversation · prepared replies

See this job with your team.

Tell us how your team handles this job today. We’ll walk through the analysis, supporting evidence and review steps in a demo.

Book a demo
What to bring for this job
  • Time-ordered process measurements with subgroup identifiers
  • Specification versions and measurement-system evidence
  • Process changes, exclusions and the approved analysis approach

Source access, permissions and permitted actions are agreed for your environment.

Source excerpt

CPV-211

Measurement series

Recorded evidence
40 batches in time order

Selected fictional record, not a live source-system view.