Skip to main content

Batch record review time, from your own lots.

Enter your lots, review hours and exception rate to see what review costs now and what a target you set would free, with a case for Word.

Your site and review baseline

lots/year
hours/lot
%
hours/lot
$/hour
%

Estimate for Site 1, Commercial Manufacturing

Annual capacity freed
504 h/year0.26 FTE (at 1,920 h/⁠FTE-⁠year)
Annual cost equivalent
$47,880/yearAt your 40% target reduction
Baseline review and rework
1,260 h/year7 h/lot average ($119,700/year)
StepCalculationEstimate
Annual routine QA review180 lots × 6 h/lot1,080 h
Annual exception and rework180 lots × 25% × 4 h/lot180 h
Total baseline review and rework1,080 h + 180 h (7 h/lot average)1,260 h, or $119,700/year
Estimated capacity freed1,260 h × 40% target (÷ 1,920 h/FTE)504 h/year (0.26 FTE)
Annual cost equivalent freed504 h × 95 USD/h (2.8 h/lot freed)$47,880/year
Remaining annual review time1,260 h − 504 h756 h/year

What five companies measured on Seal

What each measured on its own process after adopting Seal. They are different measures: only Paradromics’ traveler review time is the review of a record. Set your own target; none is a promise of what your site will save.

CompanyScopeMeasured outcomes
AcclinateQMSQuality cycle times: −50%; Time taken to prepare for audits: −40%; Confidence in correct training: 100%
MiAlgaeeBR, QMS, ELNDocumentation time: −75%; Traceability: Instant lot genealogy; Scale: Lab to commercial on one platform
Skye BiologicseBR, QMSIncrease in throughput: +35%; Non-conformances: −40%; Procedure review cycles: 2× faster
BioventixQMS, ELNDocument admin time: −80%; Audit readiness: Customer-approved; Data traceability: 100%
ParadromicsQMS, ELN, eBR, MESOperator paperwork: −80%; Traveler review time for engineers: −90%; Process innovation time: −15%

Where each number comes from.

Routine review is lots × hours per lot. Exception rework is the lots affected × the extra hours spent returning corrections, chasing signatures and closing deviations. The reduction is yours to set, and applies to both. FTE is hours ÷ 1,920, which is 48 weeks of 40 hours, before leave, training and meetings.

Whatever the time, the review stays. 21 CFR 211.192 has all production and control records “reviewed and approved by the quality control unit” before release, and in the EU a QP certifies the batch under EU GMP Annex 16.

Worked: one line, and what moves the answer.

Example, all invented: Line 4 releases 80 lots a year. QA timed 12 reviews, 9.5 hours on average; 28 of the 80 lots, 35%, came back with a correction that took 7 hours more; the blended rate is £62.

StepCalculationEstimate
Annual routine QA review80 lots × 9.5 h/lot760 h
Annual exception and rework80 lots × 35% × 7 h/lot196 h
Total baseline review and rework760 h + 196 h (12 h/lot average)956 h, or £59,272/year
Estimated capacity freed956 h × 30% target (÷ 1,920 h/FTE)286.8 h/year (0.15 FTE)
Annual cost equivalent freed286.8 h × 62 GBP/h (3.6 h/lot freed)£17,782/year
Remaining annual review time956 h − 286.8 h669.2 h/year

The same line, one figure moved

CaseTime nowFreedCost equivalent
As measured, 30% target956 h286.8 h, 0.15 FTE£17,782
Half the target, 15%956 h143.4 h, 0.07 FTE£8,891
Target 45%956 h430.2 h, 0.22 FTE£26,672
Review is 8 hours, not 9.5836 h250.8 h, 0.13 FTE£15,550
Exceptions fall to 20% of lots872 h261.6 h, 0.14 FTE£16,219

The target moves the answer most and is the only figure nobody can measure first. Present it as a range. At 30% the line frees under a sixth of one person, so the case rests on days off the release date as much as on cost.

How to get figures finance will accept.

FigureMeasure itCommon fault
Review hours per lotTime at least ten reviews of ordinary lots, hands on, excluding the waitCounting the days a record sat in a tray
Exception rateLots returned at least once ÷ lots reviewed, over a full yearCounting corrections, so one bad lot counts five times
Rework per affected lotQA and operations time from return to closed, from the deviation logLeaving operations out
Hourly rateFinance’s loaded rate for the people who do the workSalary alone
Target reductionWhat a pilot on one product showedAnother company’s figure

Who uses the case, and for what.

DecisionWho makes itWhat holds it
Whether the saving is realFinance, with the head of QAHours freed are cash only if a post, overtime or a contract goes. Otherwise they are capacity.
What review may narrowQA21 CFR 211.22(a): the authority “to review production records to assure that no errors have occurred”, or that they were fully investigated.
What must still be investigatedQA211.192: any unexplained discrepancy is “thoroughly investigated, whether or not the batch has already been distributed”.
What the QP relies onThe QPAnnex 16, 1.7: the tasks may be delegated, but the QP needs “on-going assurance that this reliance is well founded”.

Where the estimate stops.

Time on task, not time to release. A lot can need nine hours’ review and wait three weeks for it. The days are a separate measure, and often the bigger one.

One reduction for two kinds of work. Reading falls when a system checks entries as they are made; rework falls only if the errors do. If yours will move differently, run the estimator once for each.

No cost of getting there. Master records to convert, validation and training come off the first year. Paper to electronic batch records sets out that work, batch record review what a reviewer checks, and review by exception what can be narrowed and what can’t.

Sources.

Each was read on 24 November 2026.

Review the exceptions, not every line.

Bring one master batch record to a demo. We configure it with your checks so your team can see how review by exception runs on your own process.