Complaints. Corrective action. Audits. Reviews. ISO 9001. Every clause, answered by its records.
Run your ISO 9001 quality system in Seal, each clause answered by records that link to each other. Your auditor samples the records themselves.
ISO 9001:2026 Fulmar Aseptic's quality system
Clauses 4 to 10Linked to CA-064
4 Context
5 Leadership
6 Planning
7 Support
8 Operation
9 Performance
10 Improvement
Corrective action, open
CA-064 Feed track worn before its service life
Links, by clause: 10Done
- 6.1RSK-022, rated againTue 24 Nov
- 7.1.5GA-31 to GA-36, calibratedMon 23 Nov
- 7.26 of 6 trained on v5Mon 30 Nov
- 7.5SI-VF4-03 v5Wed 25 Nov
- 8.4SCAR-012, Razorbill PrecisionWed 9 Dec
- 8.5.58 VF-4s, tracks replacedThu 10 Dec
- 8.7NC-207Thu 26 Nov
- 9.1.2CMP-118, Blubber BiologicsFri 11 Dec
- 9.2AUD-066 sampled itTue 1 Dec
- 9.3MR-2026, an inputThu 7 Jan
Effectiveness check
4 of 23 VF-4s measured at their next service. Due Tue 30 Nov 2027
Surveillance audit
34 records sampled, 0 major findings
A complaint lands on the machine it names.
A customer's report is logged on the filler it is about, in their words, with their readings and that filler's service record.

CMP-118 Stopper feed track worn on F-02
Received Thu 12 Nov 09:15, by emailWO-0588
F-02's stopper feed track is worn. It has jammed five times since 27 Aug, and its current is up 0.7 A over five lots. Readings attached. Please replace it on Sat 14 Nov from 04:00 under our WO-0588, and tell us why it wore so soon.
Feed track current, attachedA
2.2 A: Blubber's alert, set Sat 14 Nov, after it sent these
Answered Fri 4 DecD. Ferraz
The track came from batch 2401, coated thinner than its drawing asks. Each other VF-4 with a track from that batch is being measured and its track replaced, and every annual service now measures the groove against a limit.
VF-4 filler, in service
VF4-0116 Blubber Biologics, Line 2, F-02
Its service recordTrack
Every filler that could fail the same way.
Neil finds each unit with a part from the same batch, and the owner confirms them. Each cause gets an action, and a check that it worked.

CA-064 Feed track worn before its service life
Could it occur elsewhere? 10.2Groove, 0.20 mm limit
8 of 23 VF-4s had a track 4471-020 from batch 2401
All 23 in service4 of 15 others measured
Causes, and their actions2
Batch 2401 coated 120 to 150 µm, against 250 to 350 µm
SI-VF4-03 v4 had the track inspected by eye
- SI-VF4-03 v5 measures the groove, with a limit
NC-207, the batch's other tracks
4 in stores held Tue 17 Nov, scrapped Thu 26 Nov
The other 15
Their batches were accepted on certificates alone, and none has a jam on record. RSK-022, rated again Tue 24 Nov, holds them to their next service.
Effectiveness check
No track over the limit at any VF-4's next service
Due
Tue 30 Nov 2027
A new instruction, and every engineer on it.
The changed step is approved as a new version, linked to its action. Each engineer is trained on it before their first visit under it.

SI-VF4-03 VF-4 annual service
Step 7.3, feed trackv4 to v5
v4Inspect the feed track for wear.
v5Measure the groove at the bend with a calibrated gauge, and read the feed track current. Replace the track over 0.20 mm, or 0.4 A over its run-in reading where one is recorded.
The changeVF-4 annual service
Assigned on approval: service engineers6
Trained before the visit
6 of 6
Read and practical
Observed by P. Ilves
The supplier, scored on what it shipped.
Its evaluation reads its batches, its nonconformities and its SCAR. Conditions hold until three batches in a row measure in spec.

Razorbill Precision Stopper feed track, 4471-020
EvaluationTue 16 Jun and Thu 10 Dec
58of 100, from 86
Batches of 4471-020, since 20213 of 15 measured
Batch 2401: 120 to 150 µm, against 250 to 350 µm. Its certificate quoted the drawing.
SCAR-012, answered Tue 8 DecAccepted Wed 9 Dec
The coating cycle was cut short after a rectifier fault, and the certificate quoted the drawing.
Conditions, until 3 in a row pass1 of 3
- 2701290 µm, certificate 300
- Second batch
- Third batch
Measured by Razorbill Precision for its certificate, and at goods-in by J. Pike on Mon 11 Jan under GI-04 v3
Internal audits cover every clause.
The programme audits every clause, 4.1 to 10.2, and what ISO 9001:2026 changed against it. Each finding closes with evidence.

AUD-066 Servicing, and the 2026 changes
Programme 2026, by clause58 of 58 audited
What ISO 9001:2026 changedFound
AUD-066's findings2
9.3.2 c)The review's agenda has no input for changes in interested parties' needs
Sampled: MR agenda MR-T v3
MR-T v4 adds it. H. Brodie, closed Mon 7 Dec
8.5.2Service reports keep a part's serial but not its batch
Sampled: CA-064's search of goods-in records
Service report SR-VF4 v3 records the batch. D. Ferraz, closed Fri 11 Dec
Closed on time, 2026
9 of 9 2025: 7 of 12
A management review drafted from records.
Neil drafts each input from the records and cites every figure, beside last year's. The directors decide the actions, and sign.

MR-2026 Management review
Inputs, drafted by Neil20262025
- ComplaintsCMP-105 to CMP-1181419
- NonconformitiesNC-186 to NC-2092427
- Corrective actions openedCA-059 to CA-06465
- Audit findings closed on timeAUD-061 to AUD-0669 of 97 of 12
- Suppliers with conditionsRazorbill Precision1 of 380 of 36
Drafted Mon 4 Jan 09:12. Checked by H. Brodie, Tue 5 Jan 15:40
Resources, risks and improvement20262025
Decided3
- D1
A seventh service engineer by Thu 1 AprM. Fairley
- D2
Ask VF-4 customers who read their filler's current to share itD. Ferraz
- D3
2027 objective: factory test steps passed first time, 90%C. Dunmore
Signed2 of 2
- M. FairleyManaging directorThu 7 Jan 11:32
- C. DunmoreOperations directorThu 7 Jan 11:34
What the auditor sampled, and found.
Each record the auditor asks for is shared as a published, read-only copy. The certification body, not Seal, decides the certificate.

Surveillance audit with the move to ISO 9001:2026
Sampled, by clause34
The thread, as the auditor followed it8
Longest wait for a recordPublished, read-only, 30 days
11 minJan 2026, shared drive: 19 h
FindingsJan 2026: 1 minor
- Major
- 0
- Minor
- 1
- Improvement
- 2
9.1.2Customers' perception of servicing, in scope, is not monitored
CA-065, H. Brodie. Plan due Wed 17 Feb
Opportunities for improvement
- Current shared by customers is not trended across the fleet
- Coating is measured at goods-in on the track's batches only, not on other coated parts
Recommended
Certification continued, moved to ISO 9001:2026
Decision
The certification body's
Why Seal, and not Word and a shared drive.
A shared drive holds files. Seal keeps each clause's evidence as records that link, so your auditor follows one thread.
| Word and a shared drive | Seal | |
|---|---|---|
| A complaint | An email, copied into a log. | A record on the machine or lot it names, with the customer's words kept as sent. |
| Could it occur elsewhere? | Answered from memory, or a spreadsheet of serials. | Neil finds the units from service and goods-in records. The owner confirms them. |
| A procedure change | A new Word file, emailed round, the old one renamed. | A new version with its approvals, linked to the action that asked for it. |
| Training on it | A signed sheet, filed later. | Assigned on approval to each role that needs it, and recorded against that version. |
| A supplier | Scored once a year from recollection. | Scored from its batches, its nonconformities and its SCARs. |
| Internal audit | A plan in a spreadsheet, findings in a report. | A programme by clause, each finding linked to its action and closed with evidence. |
| Management review | A week spent gathering figures for slides. | Inputs Neil drafts, each figure cited to its record. The directors decide and sign. |
| The auditor's sample | Files found, copied and sent while the auditor waits. | Each record shared as a published, read-only copy, opened with a code Seal emails, for 30 days. |
See it in Seal.
Captured with sample records: a procedure changed with its training and form, and a supplier's new site qualified as linked work.
A procedure change, with what changes with it.
The new version, the training and the form it needs, each linked, and effective only once it is approved.

- A proposed revisionv05 is proposed under its change, CHG-014. v04 stays in force until v05 is approved.
- What changes with itThe training, the form and the line-side copy change together, each linked as an action.
- Effective once approvedv05 takes effect only on approval. Records made under v04 keep their version.
A supplier's new site, qualified as linked work.
Each part of the qualification with its owner and state, linked to the receipt or approval it answers.

- The qualification, as its workThe decision, the quality agreement, the specification comparison and the audit evidence, each a record.
- Each with its owner and stateWho holds each, and where it stands. The decision is still pending.
- Linked to what it answersEach links to the receipt that raised it, or to the approval it compares against.
Questions about ISO 9001.
Can we get ISO 9001 certified with Seal?
You can run your ISO 9001 quality system in Seal, and your certification body audits it there. Seal does not certify you: only a certification body issues a certificate, and conformity depends on how your organisation runs its system.
We have no quality system yet. Where would we start?
With your scope and the processes you run, and any procedures you already have, however rough. Neil drafts the first procedures and their forms from how your team describes the work, and the owners edit and approve them. Once the scope is agreed and the inputs received, Seal prepares a first working process for you to evaluate within 48 hours.
Do we need a quality manual?
ISO 9001 does not ask for one. It asks for the scope, the quality policy and the quality objectives, for whatever documents your processes need, and for records that show the system working, such as calibration, evidence of competence, supplier evaluations, traceability, the review of changes, release, nonconforming outputs, internal audit results, management review results and nonconformities with the actions taken.
Which edition should we follow, ISO 9001:2015 or ISO 9001:2026?
ISO 9001:2026, published in September 2026. No initial ISO 9001:2015 certifications are made after 31 March 2028, and accredited ISO 9001:2015 certifications stop being valid on 30 September 2029. A certified system can move to the new edition at a surveillance or recertification audit, or at a special audit, once its certification body is accredited for ISO 9001:2026.
What does the certification audit look at?
At stage 1, your certification body reviews your system and whether you are ready, including whether internal audits and management reviews are planned and performed. At stage 2 it audits whether the system is implemented and effective, by sampling records. Surveillance audits follow in the first and second years and recertification in the third.
Can our auditor see the records in Seal?
Yes. You can walk an auditor through the records on screen, or share a published record with a named person: a fixed, read-only copy that they open with a code Seal emails them, for 30 days. Bioventix, which has operated under ISO 9001 and ISO 13485 since 2003 and is regularly audited by its customers, moved its document control, training, audits and CAPAs onto Seal. A customer audit since then produced positive comments on its electronic signatures and audit trails.
How are quality objectives measured?
Each objective is a record with its target and plan, and its measure is counted from the records it is about, such as on-time deliveries, complaints or nonconformities. The management review links the objectives with the other inputs it considers.
Can Neil run the quality system for us?
No. Neil drafts procedures and forms, gathers the evidence for an audit or a management review, and suggests lines of investigation. People approve every document, decide every disposition and close every corrective action, and nothing Neil drafts takes effect until a person accepts it.
Can we add ISO 13485 or GMP later?
Yes, on the same records. ISO 13485 adds requirements such as risk management in product realisation, a medical device file and documented software validation, and Seal keeps design controls, risk files and device records on the same platform. For GMP, Seal includes audit history, access controls and electronic signatures, with controls to support 21 CFR Part 11 and EU GMP Annex 11; how they apply depends on your intended use.
We are a small team. Is this too much system?
Start with what the standard and your work need: document control, training, nonconformities and corrective actions, internal audit and management review. Add supplier, design and equipment records when your processes have them. Each is configured to how you work, not the other way round.
In depth
The ISO 9001 guide6 sections, with references
All 12 capabilities
- Document control
- The policy, procedures and forms at their approved versions, with approval workflows and electronic signatures. Superseded versions are kept with their approval history.
- Competence and training
- Training mapped to procedures and roles, and assessed again when a version changes. A training prerequisite can govern the step that needs it.
- Risks and opportunities
- Each entry recorded against its process, with its assessment and the action taken on it.
- Supplier evaluation
- Supplier qualification, monitoring and audit scheduling, with an approved supplier list and its scope. A supplier corrective action request links to the finding behind it.
- Nonconforming outputs
- A nonconformity records what was affected, its disposition and who decided, and opens a corrective action where one is needed.
- Corrective action
- Cause, actions, owners and an effectiveness check, with a closure gate that can require its evidence.
- Internal audit
- An audit programme, each audit’s scope and evidence, and findings linked to their actions.
- Control of changes
- Changes to processes, documents and systems with their impact assessment, approval and implementation.
- Customer feedback
- Complaints with their investigation and trends, linked to the product or order they are about.
- Measuring equipment
- Equipment with its calibration and status, and the decisions a check outside tolerance leaves open. A formula can check a calibration date before a result is accepted.
- Management review
- A review record that links the audits, objectives, nonconformities, feedback and supplier performance it considers. Neil gathers them; the decisions are your management’s.
- Procedures drafted by Neil
- Neil drafts procedures and their forms from how your team describes the work. Each draft is a starting point that its owner edits and approves.


See your process in Seal.
Working 48 hours after we agree its scope: tested, with evidence your QA approves.