Skip to main content

Complaints. Corrective action. Audits. Reviews. ISO 9001. Every clause, answered by its records.

Run your ISO 9001 quality system in Seal, each clause answered by records that link to each other. Your auditor samples the records themselves.

Fulmar Aseptic's quality system in Seal on Wed 20 Jan 16:05, when its certification body's surveillance audit, with the move to ISO 9001:2026, closed. On the left Fulmar's map of the standard, QM-01 version 4, clause by clause, each with what Fulmar keeps for it: 4.1, 4.2 Context and parties, 11 parties; 4.3, 4.4 Scope and processes, 9 processes; 5.2, 5.3 Policy and roles, QP-01 v5; 6.1 Risks and opportunities, 39 risks; 6.2 Quality objectives, 4 of 5 met; 7.1.5 Measuring equipment, 47 gauges; 7.2 Competence, 41 people; 7.5 Documented information, 212 documents; 8.4 External providers, 38 suppliers; 8.5.5 Post-delivery, servicing, 23 VF-4s; 8.7 Nonconforming outputs, 24 in 2026; 9.1.2 Satisfaction, complaints, 14 complaints; 9.2 Internal audit, 6 audits; 9.3 Management review, MR-2026; 10.2 Corrective action, 6 in 2026. On the right corrective action CA-064, feed track worn before its service life, opened from complaint CMP-118, with its links to 10 other clauses: 6.1, RSK-022, rated again; 7.1.5, GA-31 to GA-36, calibrated; 7.2, 6 of 6 trained on v5; 7.5, SI-VF4-03 v5; 8.4, SCAR-012, Razorbill Precision; 8.5.5, 8 VF-4s, tracks replaced; 8.7, NC-207; 9.1.2, CMP-118, Blubber Biologics; 9.2, AUD-066 sampled it; 9.3, MR-2026, an input. The auditor, R. Moyo, sampled 34 records and followed CA-064's thread, 8 of them; 0 major findings.
Quality system › QM-⁠01 v4
Audit closed 16:05

ISO 9001:2026 Fulmar Aseptic's quality system

Certified to ISO 9001:2015 since 2017. On Seal since Mon 4 May 2026

Each clause of ISO 9001:2026, and what Fulmar keeps for itCA-⁠064 is one corrective action. Its links reach 10 more clausesEach link opens its record, and each record links backR. Moyo followed CA-⁠064's thread: 8 records. No major finding4.1, 4.2 Context and parties: 11 parties4.3, 4.4 Scope and processes: 9 processes5.2, 5.3 Policy and roles: QP-⁠01 v56.1 Risks and opportunities: 39 risks, in the risk register, each with its process and its action. Linked from CA-⁠064: RSK-⁠022, rated again6.2 Quality objectives: 4 of 5 met7.1.5 Measuring equipment: 47 gauges. Linked from CA-⁠064: GA-⁠31 to GA-⁠36, calibrated7.2 Competence: 41 people, everyone whose work affects quality, each with a training record. Linked from CA-⁠064: 6 of 6 trained on v57.5 Documented information: 212 documents. Linked from CA-⁠064: SI-⁠VF4-⁠03 v58.4 External providers: 38 suppliers. Linked from CA-⁠064: SCAR-⁠012, Razorbill Precision8.5.5 Post-delivery, servicing: 23 VF-⁠4s. Linked from CA-⁠064: 8 VF-⁠4s, tracks replaced8.7 Nonconforming outputs: 24 in 2026. Linked from CA-⁠064: NC-⁠2079.1.2 Satisfaction, complaints: 14 complaints. Linked from CA-⁠064: CMP-⁠118, Blubber Biologics9.2 Internal audit: 6 audits. Linked from CA-⁠064: AUD-⁠066 sampled it9.3 Management review: MR-⁠2026. Linked from CA-⁠064: MR-⁠2026, an input10.2 Corrective action: 6 in 2026. Linked from CA-⁠064: CA-⁠064

A complaint lands on the machine it names.

A customer's report is logged on the filler it is about, in their words, with their readings and that filler's service record.

Complaint CMP-118, stopper feed track worn on f-02, received Thu 12 Nov 09:15 from T. Nakamura, Engineering, Blubber Biologics, with its work order WO-0588, and logged by D. Ferraz on filler VF4-0116. Blubber wrote: F-02's stopper feed track is worn. It has jammed five times since 27 Aug, and its current is up 0.7 A over five lots. Readings attached. Please replace it on Sat 14 Nov from 04:00 under our WO-0588, and tell us why it wore so soon. The readings attached: First reading, Tue 8 Sep: 1.84 A; Lot 26-0913, Wed 14 Oct: 1.90 A; Lot 26-0914, Tue 20 Oct: 2.00 A; Lot 26-0915, Tue 27 Oct: 2.24 A, at or over the 2.2 A Blubber Biologics set as its alert on Sat 14 Nov, after it sent these; Lot 26-0916, Mon 2 Nov: 2.40 A, at or over the 2.2 A Blubber Biologics set as its alert on Sat 14 Nov, after it sent these; Lot 26-0917, Fri 6 Nov: 2.60 A, at or over the 2.2 A Blubber Biologics set as its alert on Sat 14 Nov, after it sent these. The filler's service record: Mon 18 Mar 2024, Installed: Track 20417. Batch 2401, from goods-in. G. Petit; Tue 17 Jun 2025, Annual service: Track inspected: OK, under SI-VF4-03 v4, by eye. M. Haas; Tue 16 Jun 2026, Annual service: Track inspected: OK, under SI-VF4-03 v4, by eye. J. Rourke; Sat 14 Nov 2026, Track replaced: Track 21186. Run in at 1.8 A. S. Albrecht; Tue 17 Nov 2026, Worn track measured: Groove 0.41 mm. At Blubber. P. Ilves. It led to nonconformity NC-207 and corrective action CA-064; D. Ferraz answered on Fri 4 Dec: The track came from batch 2401, coated thinner than its drawing asks. Each other VF-4 with a track from that batch is being measured and its track replaced, and every annual service now measures the groove against a limit. H. Brodie closed it on Fri 11 Dec, in 29 days.
Complaints › CMP-⁠118
Closed Fri 11 Dec

CMP-118 Stopper feed track worn on F-⁠02

Blubber Biologics. Logged 09:40 by D. Ferraz

Received Thu 12 Nov 09:15, by emailWO-⁠0588

F-⁠02's stopper feed track is worn. It has jammed five times since 27 Aug, and its current is up 0.7 A over five lots. Readings attached. Please replace it on Sat 14 Nov from 04:00 under our WO-⁠0588, and tell us why it wore so soon.

T. Nakamura, Engineering, Blubber Biologics

Feed track current, attachedA

2.2 A: Blubber's alert, set Sat 14 Nov, after it sent these

Answered Fri 4 DecD. Ferraz

The track came from batch 2401, coated thinner than its drawing asks. Each other VF-⁠4 with a track from that batch is being measured and its track replaced, and every annual service now measures the groove against a limit.

VF-⁠4 filler, in service

VF4-0116 Blubber Biologics, Line 2, F-⁠02

Its service recordTrack

Led to
NC-207, CA-064

Closed in
29 days of a 30-day target

Blubber's words, kept as sent, with its work orderF-⁠02's current to the jam, lot by lot, from Blubber's Seal EdgeLogged on the filler it names: VF4-⁠0116, and its service recordAnswered, and closed in 29 days, against a target of 30First reading, Tue 8 Sep: 1.84 ALot 26-⁠0913, Wed 14 Oct: 1.90 ALot 26-⁠0914, Tue 20 Oct: 2.00 ALot 26-⁠0915, Tue 27 Oct: 2.24 A, at or over the 2.2 A Blubber Biologics set as its alert on Sat 14 Nov, after it sent theseLot 26-⁠0916, Mon 2 Nov: 2.40 A, at or over the 2.2 A Blubber Biologics set as its alert on Sat 14 Nov, after it sent theseLot 26-⁠0917, Fri 6 Nov: 2.60 A, at or over the 2.2 A Blubber Biologics set as its alert on Sat 14 Nov, after it sent theseMon 18 Mar 2024, Installed: Track 20417. Batch 2401, from goods-in. G. PetitTue 17 Jun 2025, Annual service: Track inspected: OK, under SI-⁠VF4-⁠03 v4, by eye. M. HaasTue 16 Jun 2026, Annual service: Track inspected: OK, under SI-⁠VF4-⁠03 v4, by eye. J. RourkeSat 14 Nov 2026, Track replaced: Track 21186. Run in at 1.8 A. S. AlbrechtTue 17 Nov 2026, Worn track measured: Groove 0.41 mm. At Blubber. P. Ilves

Every filler that could fail the same way.

Neil finds each unit with a part from the same batch, and the owner confirms them. Each cause gets an action, and a check that it worked.

Corrective action CA-064, feed track worn before its service life, opened Tue 17 Nov by H. Brodie from complaint CMP-118 and nonconformity NC-207, owned by P. Ilves. Of the 23 VF-4 fillers in service, 8 carried a track from batch 2401: VF4-0103: track from batch 2401, in service from Tue 21 Jan 2025, at a service. Groove 0.09 mm, measured Tue 8 Dec by A. Dube before it came out; replaced with 21180; VF4-0108: track from batch 2401, in service from Tue 3 Mar 2026, at a service. Groove 0.05 mm, measured Thu 10 Dec by S. Albrecht before it came out; replaced with 21181; VF4-0114: track from batch 2401, in service from Mon 19 Feb 2024, at installation. Groove 0.31 mm, measured Mon 30 Nov by S. Albrecht before it came out; replaced with 21187; VF4-0115: track from batch 2401, in service from Mon 4 Mar 2024, at installation. Groove 0.28 mm, measured Tue 1 Dec by N. Ivers before it came out; replaced with 21188; VF4-0116: track from batch 2401, in service from Mon 18 Mar 2024, at installation. Groove 0.41 mm, measured Tue 17 Nov by P. Ilves at Blubber Biologics, on the track replaced Sat 14 Nov and kept for CAPA-019; replaced with 21186; VF4-0117: track from batch 2401, in service from Mon 13 May 2024, at installation. Groove 0.19 mm, measured Wed 2 Dec by G. Petit before it came out; replaced with 21189; VF4-0118: track from batch 2401, in service from Mon 8 Jul 2024, at installation. Groove 0.16 mm, measured Thu 3 Dec by M. Haas before it came out; replaced with 21190; VF4-0119: track from batch 2401, in service from Mon 14 Oct 2024, at installation. Groove 0.12 mm, measured Mon 7 Dec by J. Rourke before it came out; replaced with 21191. 3 were over the 0.20 mm limit. The causes: Batch 2401 coated 120 to 150 µm, against 250 to 350 µm, answered by SCAR-012, and coating measured at goods-in; SI-VF4-03 v4 had the track inspected by eye, answered by SI-VF4-03 v5 measures it, with a limit. The other 15 are measured at their next annual service: their batches were accepted on certificates alone, none has a jam on record, and RSK-022, rated again Tue 24 Nov, holds them to their next service. 4 have been, all within the limit. The effectiveness check is due Tue 30 Nov 2027.
Corrective actions › CA-⁠064
Open

CA-064 Feed track worn before its service life

Owner P. Ilves. From CMP-118 and NC-207

Could it occur elsewhere? 10.2Groove, 0.20 mm limit

8 of 23 VF-⁠4s had a track 4471-⁠020 from batch 2401

All 23 in service4 of 15 others measured

Causes, and their actions2

  1. Batch 2401 coated 120 to 150 µm, against 250 to 350 µm

  2. SI-⁠VF4-⁠03 v4 had the track inspected by eye

NC-⁠207, the batch's other tracks

4 in stores held Tue 17 Nov, scrapped Thu 26 Nov

The other 15

Their batches were accepted on certificates alone, and none has a jam on record. RSK-⁠022, rated again Tue 24 Nov, holds them to their next service.

Effectiveness check
No track over the limit at any VF-⁠4's next service

Due
Tue 30 Nov 2027

Neil found the 8 VF-⁠4s with a batch 2401 track. P. Ilves confirmed themF-⁠02's groove measured on its worn track, the other 7 before theirs came out. 3 were over 0.20 mmTwo causes, each answered by its own recordThe other 15 are measured at their next service. 4 so far, all withinVF4-⁠0101: to be measured at its next annual serviceVF4-⁠0102: to be measured at its next annual serviceVF4-⁠0103: track from batch 2401, in service from Tue 21 Jan 2025, at a service. Groove 0.09 mm, measured Tue 8 Dec by A. Dube before it came out; replaced with 21180VF4-⁠0104: to be measured at its next annual serviceVF4-⁠0105: measured at its service, Tue 15 Dec, 0.07 mm. M. HaasVF4-⁠0106: to be measured at its next annual serviceVF4-⁠0107: to be measured at its next annual serviceVF4-⁠0108: track from batch 2401, in service from Tue 3 Mar 2026, at a service. Groove 0.05 mm, measured Thu 10 Dec by S. Albrecht before it came out; replaced with 21181VF4-⁠0109: to be measured at its next annual serviceVF4-⁠0110: measured at its service, Wed 13 Jan, 0.11 mm. J. RourkeVF4-⁠0111: to be measured at its next annual serviceVF4-⁠0112: to be measured at its next annual serviceVF4-⁠0113: to be measured at its next annual serviceVF4-⁠0114: track from batch 2401, in service from Mon 19 Feb 2024, at installation. Groove 0.31 mm, measured Mon 30 Nov by S. Albrecht before it came out; replaced with 21187VF4-⁠0115: track from batch 2401, in service from Mon 4 Mar 2024, at installation. Groove 0.28 mm, measured Tue 1 Dec by N. Ivers before it came out; replaced with 21188VF4-⁠0116: track from batch 2401, in service from Mon 18 Mar 2024, at installation. Groove 0.41 mm, measured Tue 17 Nov by P. Ilves at Blubber Biologics, on the track replaced Sat 14 Nov and kept for CAPA-⁠019; replaced with 21186VF4-⁠0117: track from batch 2401, in service from Mon 13 May 2024, at installation. Groove 0.19 mm, measured Wed 2 Dec by G. Petit before it came out; replaced with 21189VF4-⁠0118: track from batch 2401, in service from Mon 8 Jul 2024, at installation. Groove 0.16 mm, measured Thu 3 Dec by M. Haas before it came out; replaced with 21190VF4-⁠0119: track from batch 2401, in service from Mon 14 Oct 2024, at installation. Groove 0.12 mm, measured Mon 7 Dec by J. Rourke before it came out; replaced with 21191VF4-⁠0120: to be measured at its next annual serviceVF4-⁠0121: measured at its service, Tue 5 Jan, 0.04 mm. G. PetitVF4-⁠0122: measured at its service, Mon 18 Jan, 0.03 mm. A. DubeVF4-⁠0123: to be measured at its next annual service

A new instruction, and every engineer on it.

The changed step is approved as a new version, linked to its action. Each engineer is trained on it before their first visit under it.

Service instruction SI-VF4-03, VF-4 annual service, at v5, effective Mon 30 Nov. Step 7.3 in v4: Inspect the feed track for wear. In v5: Measure the groove at the bend with a calibrated gauge, and read the feed track current. Replace the track over 0.20 mm, or 0.4 A over its run-in reading where one is recorded. Drafted by Neil, Mon 23 Nov, from CA-064; Proposed by P. Ilves, Mon 23 Nov 16:05; Reviewed by D. Ferraz, Tue 24 Nov 11:05; Approved by H. Brodie, Wed 25 Nov 15:10. Each of the 6 service engineers was trained on it before their first visit under it: S. Albrecht: read SI-VF4-03 v5 and measured a worn track on the training filler, observed by P. Ilves, Thu 26 Nov 10:20. First visit under v5: Mon 30 Nov; G. Petit: read SI-VF4-03 v5 and measured a worn track on the training filler, observed by P. Ilves, Thu 26 Nov 11:05. First visit under v5: Wed 2 Dec; M. Haas: read SI-VF4-03 v5 and measured a worn track on the training filler, observed by P. Ilves, Thu 26 Nov 14:30. First visit under v5: Thu 3 Dec; J. Rourke: read SI-VF4-03 v5 and measured a worn track on the training filler, observed by P. Ilves, Fri 27 Nov 09:40. First visit under v5: Mon 7 Dec; A. Dube: read SI-VF4-03 v5 and measured a worn track on the training filler, observed by P. Ilves, Fri 27 Nov 10:50. First visit under v5: Tue 8 Dec; N. Ivers: read SI-VF4-03 v5 and measured a worn track on the training filler, observed by P. Ilves, Mon 30 Nov 08:30. First visit under v5: Tue 1 Dec.
Documents › SI-⁠VF4-⁠03 v5
Effective Mon 30 Nov

SI-VF4-03 VF-⁠4 annual service

v5, from CA-064. Gauges GA-⁠31 to GA-⁠36 calibrated Mon 23 Nov

Step 7.3, feed trackv4 to v5

v4Inspect the feed track for wear.

v5Measure the groove at the bend with a calibrated gauge, and read the feed track current. Replace the track over 0.20 mm, or 0.4 A over its run-⁠in reading where one is recorded.

The changeVF-⁠4 annual service

Assigned on approval: service engineers6

Trained before the visit
6 of 6

Read and practical
Observed by P. Ilves

Step 7.3, as v4 had it and as v5 has itDrafted by Neil from CA-⁠064's action. Proposed, reviewed and approved by peopleAssigned to each of the 6 service engineers on approval6 of 6 trained before their first visit under v5Drafted by Neil, Mon 23 Nov, from CA-⁠064Proposed by P. Ilves, Mon 23 Nov 16:05Reviewed by D. Ferraz, Tue 24 Nov 11:05Approved by H. Brodie, Wed 25 Nov 15:10S. Albrecht: read SI-⁠VF4-⁠03 v5 and measured a worn track on the training filler, observed by P. Ilves, Thu 26 Nov 10:20. First visit under v5: Mon 30 NovG. Petit: read SI-⁠VF4-⁠03 v5 and measured a worn track on the training filler, observed by P. Ilves, Thu 26 Nov 11:05. First visit under v5: Wed 2 DecM. Haas: read SI-⁠VF4-⁠03 v5 and measured a worn track on the training filler, observed by P. Ilves, Thu 26 Nov 14:30. First visit under v5: Thu 3 DecJ. Rourke: read SI-⁠VF4-⁠03 v5 and measured a worn track on the training filler, observed by P. Ilves, Fri 27 Nov 09:40. First visit under v5: Mon 7 DecA. Dube: read SI-⁠VF4-⁠03 v5 and measured a worn track on the training filler, observed by P. Ilves, Fri 27 Nov 10:50. First visit under v5: Tue 8 DecN. Ivers: read SI-⁠VF4-⁠03 v5 and measured a worn track on the training filler, observed by P. Ilves, Mon 30 Nov 08:30. First visit under v5: Tue 1 Dec

The supplier, scored on what it shipped.

Its evaluation reads its batches, its nonconformities and its SCAR. Conditions hold until three batches in a row measure in spec.

Razorbill Precision's supplier evaluation, run again on Thu 10 Dec: 58 of 100, from 86 on Tue 16 Jun. Batches to drawing: 20 of 40, from 38 on Tue 16 Jun. NC-207, batch 2401; Certificates measured: 5 of 15, from 15 on Tue 16 Jun. Quoted the drawing; On time: 24 of 30, from 24 on Tue 16 Jun. 94% of 31 deliveries; Response: 9 of 15, from 9 on Tue 16 Jun. SCAR-012 in 14 days. Status approved, with conditions: each batch's coating measured on its certificate and at goods-in, until three in a row pass. Every batch of 4471-020: Batch 2104: accepted on its certificate, not measured; Batch 2109: accepted on its certificate, not measured; Batch 2202: accepted on its certificate, not measured; Batch 2207: accepted on its certificate, not measured; Batch 2211: accepted on its certificate, not measured; Batch 2304: accepted on its certificate, not measured; Batch 2310: accepted on its certificate, not measured; Batch 2401: coating measured 120 to 150 µm, Tue 17 Nov, against 250 to 350 µm; Batch 2406: accepted on its certificate, not measured; Batch 2411: accepted on its certificate, not measured; Batch 2505: accepted on its certificate, not measured; Batch 2510: accepted on its certificate, not measured; Batch 2603: accepted on its certificate, not measured; Batch 2609: coating measured 280 to 310 µm, Tue 17 Nov, against 250 to 350 µm; Batch 2701: coating measured 290 µm, Mon 11 Jan, against 250 to 350 µm. SCAR-012, raised Tue 24 Nov by R. Okonkwo, answered Tue 8 Dec: The coating cycle was cut short after a rectifier fault, and the certificate quoted the drawing. Accepted Wed 9 Dec.
Suppliers › Razorbill Precision › 4471-⁠020
With conditions

Razorbill Precision Stopper feed track, 4471-⁠020

Evaluated Thu 10 Dec. Signed R. Okonkwo and H. Brodie. Next Tue 15 Jun 2027

EvaluationTue 16 Jun and Thu 10 Dec

58of 100, from 86

Batches of 4471-⁠020, since 20213 of 15 measured

Batch 2401: 120 to 150 µm, against 250 to 350 µm. Its certificate quoted the drawing.

SCAR-⁠012, answered Tue 8 DecAccepted Wed 9 Dec

The coating cycle was cut short after a rectifier fault, and the certificate quoted the drawing.

Conditions, until 3 in a row pass1 of 3

  1. 2701290 µm, certificate 300
  2. Second batch
  3. Third batch

Measured by Razorbill Precision for its certificate, and at goods-in by J. Pike on Mon 11 Jan under GI-⁠04 v3

Scored on what it shipped: 86 in June, 58 in December15 batches of 4471-⁠020. Until NC-⁠207, accepted on their certificatesSCAR-⁠012: the cause, in Razorbill Precision's replyApproved with conditions. The first batch under them measured 290 µmBatches to drawing: 20 of 40, from 38 on Tue 16 Jun. NC-⁠207, batch 2401Certificates measured: 5 of 15, from 15 on Tue 16 Jun. Quoted the drawingOn time: 24 of 30, from 24 on Tue 16 Jun. 94% of 31 deliveriesResponse: 9 of 15, from 9 on Tue 16 Jun. SCAR-⁠012 in 14 daysBatch 2104: accepted on its certificate, not measuredBatch 2109: accepted on its certificate, not measuredBatch 2202: accepted on its certificate, not measuredBatch 2207: accepted on its certificate, not measuredBatch 2211: accepted on its certificate, not measuredBatch 2304: accepted on its certificate, not measuredBatch 2310: accepted on its certificate, not measuredBatch 2401: coating measured 120 to 150 µm, Tue 17 Nov, against 250 to 350 µmBatch 2406: accepted on its certificate, not measuredBatch 2411: accepted on its certificate, not measuredBatch 2505: accepted on its certificate, not measuredBatch 2510: accepted on its certificate, not measuredBatch 2603: accepted on its certificate, not measuredBatch 2609: coating measured 280 to 310 µm, Tue 17 Nov, against 250 to 350 µmBatch 2701: coating measured 290 µm, Mon 11 Jan, against 250 to 350 µm

Internal audits cover every clause.

The programme audits every clause, 4.1 to 10.2, and what ISO 9001:2026 changed against it. Each finding closes with evidence.

Internal audit AUD-066, Tue 1 Dec, servicing, and the 2026 changes, by K. Aalto: 14 records sampled, 2 findings: 9.3.2 c), the review's agenda has no input for changes in interested parties' needs; MR-T v4 adds it, H. Brodie, closed Mon 7 Dec; 8.5.2, service reports keep a part's serial but not its batch; Service report SR-VF4 v3 records the batch, D. Ferraz, closed Fri 11 Dec. Verified closed by K. Aalto on Mon 14 Dec. Fulmar's 2026 programme, 6 audits, took in all 58 clauses of ISO 9001:2026, 4.1 to 10.2: AUD-061, Tue 24 Feb: Purchasing and goods-in, 7 clauses against ISO 9001:2015. K. Aalto, 2 findings; AUD-062, Tue 21 Apr: Design and its changes, 9 clauses against ISO 9001:2015. D. Ferraz, 1 finding; AUD-063, Tue 16 Jun: Assembly, tests and release, 5 clauses against ISO 9001:2015. D. Ferraz, 2 findings; AUD-064, Tue 15 Sep: Context, people and audits, 11 clauses against ISO 9001:2015. P. Ilves, 1 finding; AUD-065, Tue 20 Oct: Orders, feedback and changes, 8 clauses against ISO 9001:2026. P. Ilves, 1 finding; AUD-066, Tue 1 Dec: Servicing, and the 2026 changes, 18 clauses against ISO 9001:2026. K. Aalto, 2 findings. What ISO 9001:2026 changed: 5.1.1 i), 7.1.4, 7.3 e): Quality culture and ethical behaviour. Audited against ISO 9001:2026 in AUD-066: Conforms; 5.2 e): Policy: context and strategic direction, moved to e). Audited against ISO 9001:2026 in AUD-066: Conforms; 6.1.1 to 6.1.3: Risks and opportunities, acted on separately. Audited against ISO 9001:2026 in AUD-066: Conforms; 6.3 e) to g): Changes monitored, communicated and their results reviewed. Audited against ISO 9001:2026 in AUD-065: Conforms; 7.5: Documented information "shall be available", reworded throughout. Audited against ISO 9001:2026 in AUD-066: Conforms; 9.3.2 c): Interested parties' changing needs, an input the review shall include. Audited against ISO 9001:2026 in AUD-066: Finding 1. Findings closed by their due date: 9 of 9, against 7 of 12 in 2025.
Audits › Programme 2026 › AUD-⁠066
Closed Mon 14 Dec

AUD-066 Servicing, and the 2026 changes

Tue 1 Dec. Auditor K. Aalto, independent of servicing. 14 records sampled

Programme 2026, by clause58 of 58 audited

What ISO 9001:2026 changedFound

AUD-⁠066's findings2

  1. 9.3.2 c)The review's agenda has no input for changes in interested parties' needs

    Sampled: MR agenda MR-⁠T v3

    MR-⁠T v4 adds it. H. Brodie, closed Mon 7 Dec

  2. 8.5.2Service reports keep a part's serial but not its batch

    Sampled: CA-⁠064's search of goods-in records

    Service report SR-⁠VF4 v3 records the batch. D. Ferraz, closed Fri 11 Dec

Closed on time, 2026
9 of 9 2025: 7 of 12

Next
Management review

Every clause, 4.1 to 10.2, audited in 2026. What ISO 9001:2026 changed, against itAUD-⁠066: servicing, and what the new edition changedTwo findings, each with its action and its ownerClosed by their due dates: 9 of 9, against 7 of 12 in 20254.1: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves4.2: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves4.3: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves4.4: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves5.1.1: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto5.1.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto5.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto5.3: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto6.1.1: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto6.1.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto6.1.3: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto6.2: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves6.3: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves7.1.1: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves7.1.2: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves7.1.3: AUD-⁠063, Tue 16 Jun, assembly, tests and release, against ISO 9001:2015. D. Ferraz7.1.4: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto7.1.5.1: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto7.1.5.2: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto7.1.6: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz7.2: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves7.3: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto7.4: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz7.5.1: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto7.5.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto7.5.3: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto8.1: AUD-⁠063, Tue 16 Jun, assembly, tests and release, against ISO 9001:2015. D. Ferraz8.2.1: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves8.2.2: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves8.2.3: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves8.2.4: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves8.3.1: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.3.2: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.3.3: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.3.4: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.3.5: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.3.6: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.4.1: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto8.4.2: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto8.4.3: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto8.5.1: AUD-⁠063, Tue 16 Jun, assembly, tests and release, against ISO 9001:2015. D. Ferraz8.5.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto8.5.3: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto8.5.4: AUD-⁠061, Tue 24 Feb, purchasing and goods-in, against ISO 9001:2015. K. Aalto8.5.5: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto8.5.6: AUD-⁠062, Tue 21 Apr, design and its changes, against ISO 9001:2015. D. Ferraz8.6: AUD-⁠063, Tue 16 Jun, assembly, tests and release, against ISO 9001:2015. D. Ferraz8.7: AUD-⁠063, Tue 16 Jun, assembly, tests and release, against ISO 9001:2015. D. Ferraz9.1.1: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves9.1.2: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves9.1.3: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves9.2.1: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves9.2.2: AUD-⁠064, Tue 15 Sep, context, people and audits, against ISO 9001:2015. P. Ilves9.3.1: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto9.3.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto9.3.3: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. Aalto10.1: AUD-⁠065, Tue 20 Oct, orders, feedback and changes, against ISO 9001:2026. P. Ilves10.2: AUD-⁠066, Tue 1 Dec, servicing, and the 2026 changes, against ISO 9001:2026. K. AaltoAUD-⁠061, Tue 24 Feb: Purchasing and goods-in, 7 clauses against ISO 9001:2015. K. Aalto, 2 findingsAUD-⁠062, Tue 21 Apr: Design and its changes, 9 clauses against ISO 9001:2015. D. Ferraz, 1 findingAUD-⁠063, Tue 16 Jun: Assembly, tests and release, 5 clauses against ISO 9001:2015. D. Ferraz, 2 findingsAUD-⁠064, Tue 15 Sep: Context, people and audits, 11 clauses against ISO 9001:2015. P. Ilves, 1 findingAUD-⁠065, Tue 20 Oct: Orders, feedback and changes, 8 clauses against ISO 9001:2026. P. Ilves, 1 findingAUD-⁠066, Tue 1 Dec: Servicing, and the 2026 changes, 18 clauses against ISO 9001:2026. K. Aalto, 2 findings5.1.1 i), 7.1.4, 7.3 e): Quality culture and ethical behaviour. Audited against ISO 9001:2026 in AUD-⁠066: Conforms5.2 e): Policy: context and strategic direction, moved to e). Audited against ISO 9001:2026 in AUD-⁠066: Conforms6.1.1 to 6.1.3: Risks and opportunities, acted on separately. Audited against ISO 9001:2026 in AUD-⁠066: Conforms6.3 e) to g): Changes monitored, communicated and their results reviewed. Audited against ISO 9001:2026 in AUD-⁠065: Conforms7.5: Documented information "shall be available", reworded throughout. Audited against ISO 9001:2026 in AUD-⁠066: Conforms9.3.2 c): Interested parties' changing needs, an input the review shall include. Audited against ISO 9001:2026 in AUD-⁠066: Finding 1

A management review drafted from records.

Neil drafts each input from the records and cites every figure, beside last year's. The directors decide the actions, and sign.

Management review MR-2026, Thu 7 Jan, 10:00 to 11:30. Inputs drafted by Neil on Mon 4 Jan 09:12, each figure cited, and checked by H. Brodie on Tue 5 Jan 15:40: 9.3.2 a) Actions from MR-2025: 4 of 4 done, from 3 of 5 in 2025. Read from MR-2025's 4 actions; 9.3.2 b) External and internal issues: 3 changed, from 1 in 2025. Read from The new edition, the fleet's growth, a supplier; 9.3.2 c) Interested parties' needs: 2 changed. Read from 2 customers' quality agreements now ask for service reports in 5 days; 9.3.2 Satisfaction, installations: 8.3 of 10, from 7.9 in 2025. Read from 3 surveys, VF4-0121 to VF4-0123; 9.3.2 Complaints: 14, from 19 in 2025. Read from CMP-105 to CMP-118; 9.3.2 Quality objectives: 4 of 5 met, from 2 of 5 in 2025. Read from OBJ-2026; 9.3.2 Process performance, conformity: 84%, from 79% in 2025. Read from Factory test steps passed first time, on 3 VF-4s; 9.3.2 Nonconformities: 24, from 27 in 2025. Read from NC-186 to NC-209; 9.3.2 Corrective actions opened: 6, from 5 in 2025. Read from CA-059 to CA-064; 9.3.2 Monitoring and measurement: 19 of 20, from 17 of 19 in 2025. Read from Annual services done in their month; 9.3.2 Audit findings closed on time: 9 of 9, from 7 of 12 in 2025. Read from AUD-061 to AUD-066; 9.3.2 Suppliers with conditions: 1 of 38, from 0 of 36 in 2025. Read from Razorbill Precision; 9.3.2 Adequacy of resources: 3.8, from 3.3 in 2025. Read from VF-4s in service for each service engineer. Led to D1; 9.3.2 Actions on risks and opportunities: 11 of 12, from 8 of 10 in 2025. Read from Effective, from the risk register. RSK-022 rated again; 9.3.2 Opportunities for improvement: 3, from 2 in 2025. Read from Raised in the year. Led to D2 and D3. Decisions: D1, A seventh service engineer by Thu 1 Apr, M. Fairley; D2, Ask VF-4 customers who read their filler's current to share it, D. Ferraz; D3, 2027 objective: factory test steps passed first time, 90%, C. Dunmore. Signed M. Fairley, managing director, 11:32; C. Dunmore, operations director, 11:34.
Management review › MR-⁠2026
Signed

MR-2026 Management review

Thu 7 Jan, 10:00 to 11:30. M. Fairley, C. Dunmore, H. Brodie

Inputs, drafted by Neil20262025

  1. ComplaintsCMP-⁠105 to CMP-⁠1181419
  2. NonconformitiesNC-⁠186 to NC-⁠2092427
  3. Corrective actions openedCA-⁠059 to CA-⁠06465
  4. Audit findings closed on timeAUD-⁠061 to AUD-⁠0669 of 97 of 12
  5. Suppliers with conditionsRazorbill Precision1 of 380 of 36

Drafted Mon 4 Jan 09:12. Checked by H. Brodie, Tue 5 Jan 15:40

Resources, risks and improvement20262025

  1. Actions on risks and opportunitiesEffective, from the risk register. RSK-⁠022 rated again11 of 128 of 10

Decided3

  1. D1

    A seventh service engineer by Thu 1 AprM. Fairley

  2. D2

    Ask VF-⁠4 customers who read their filler's current to share itD. Ferraz

  3. D3

    2027 objective: factory test steps passed first time, 90%C. Dunmore

Signed2 of 2

  1. M. FairleyManaging directorThu 7 Jan 11:32
  2. C. DunmoreOperations directorThu 7 Jan 11:34
Neil drafted each input from the records, and cited each figureEach figure beside last year's, from MR-⁠2025The directors decided three actions, each with its ownerSigned by the directors. H. Brodie checked the inputs9.3.2 a) Actions from MR-⁠2025: 4 of 4 done, from 3 of 5 in 2025. Read from MR-⁠2025's 4 actions9.3.2 b) External and internal issues: 3 changed, from 1 in 2025. Read from The new edition, the fleet's growth, a supplier9.3.2 c) Interested parties' needs: 2 changed. Read from 2 customers' quality agreements now ask for service reports in 5 days9.3.2 Satisfaction, installations: 8.3 of 10, from 7.9 in 2025. Read from 3 surveys, VF4-⁠0121 to VF4-⁠01239.3.2 Complaints: 14, from 19 in 2025. Read from CMP-⁠105 to CMP-⁠1189.3.2 Quality objectives: 4 of 5 met, from 2 of 5 in 2025. Read from OBJ-⁠20269.3.2 Process performance, conformity: 84%, from 79% in 2025. Read from Factory test steps passed first time, on 3 VF-⁠4s9.3.2 Nonconformities: 24, from 27 in 2025. Read from NC-⁠186 to NC-⁠2099.3.2 Corrective actions opened: 6, from 5 in 2025. Read from CA-⁠059 to CA-⁠0649.3.2 Monitoring and measurement: 19 of 20, from 17 of 19 in 2025. Read from Annual services done in their month9.3.2 Audit findings closed on time: 9 of 9, from 7 of 12 in 2025. Read from AUD-⁠061 to AUD-⁠0669.3.2 Suppliers with conditions: 1 of 38, from 0 of 36 in 2025. Read from Razorbill Precision9.3.2 Adequacy of resources: 3.8, from 3.3 in 2025. Read from VF-⁠4s in service for each service engineer. Led to D19.3.2 Actions on risks and opportunities: 11 of 12, from 8 of 10 in 2025. Read from Effective, from the risk register. RSK-⁠022 rated again9.3.2 Opportunities for improvement: 3, from 2 in 2025. Read from Raised in the year. Led to D2 and D3

What the auditor sampled, and found.

Each record the auditor asks for is shared as a published, read-only copy. The certification body, not Seal, decides the certificate.

Surveillance audit, with the move to ISO 9001:2026, Tue 19 and Wed 20 Jan, lead auditor R. Moyo. 34 records sampled, by clause: 4, 2; 5, 2; 6, 3; 7, 7; 8, 11; 9, 5; 10, 4. Each was shared with the auditor as a published, read-only copy, opened with a code Seal emails, for 30 days. The auditor followed the thread from complaint to review: 9.1.2: CMP-118, shared as a published, read-only copy for 30 days; 8.7: NC-207, shared as a published, read-only copy for 30 days; 10.2: CA-064, shared as a published, read-only copy for 30 days. Open, so shared at its published version: its effectiveness check is due Tue 30 Nov 2027; 7.5: SI-VF4-03 v5, shared as a published, read-only copy for 30 days; 7.2: S. Albrecht's training, shared as a published, read-only copy for 30 days; 8.4: SCAR-012, shared as a published, read-only copy for 30 days; 9.2: AUD-066, shared as a published, read-only copy for 30 days; 9.3: MR-2026, shared as a published, read-only copy for 30 days. The longest wait for a record was 11 min, against 19 h in Jan 2026 on the shared drive. Findings: 0 major; 1 minor, 9.1.2, customers' perception of servicing, in scope, is not monitored, answered by CA-065, plan due Wed 17 Feb; 2 opportunities for improvement: Current shared by customers is not trended across the fleet; Coating is measured at goods-in on the track's batches only, not on other coated parts. The report recommends: certification continued, moved to iso 9001:2026. The decision is the certification body's, which is accredited for ISO 9001:2026.
Audits › Surveillance 2027
Reported 16:05

Surveillance audit with the move to ISO 9001:2026

Tue 19 and Wed 20 Jan. Lead auditor R. Moyo, for a certification body accredited for ISO 9001:2026

Sampled, by clause34

Longest wait for a recordPublished, read-only, 30 days

11 minJan 2026, shared drive: 19 h

FindingsJan 2026: 1 minor

Major
0
Minor
1
Improvement
2

9.1.2Customers' perception of servicing, in scope, is not monitored

CA-⁠065, H. Brodie. Plan due Wed 17 Feb

Opportunities for improvement

  1. Current shared by customers is not trended across the fleet
  2. Coating is measured at goods-in on the track's batches only, not on other coated parts

Recommended
Certification continued, moved to ISO 9001:2026

Decision
The certification body's

34 records sampled, each shared as a published, read-only copy for 30 daysR. Moyo followed CA-⁠064's thread, from complaint to review: 8 recordsThe longest wait for a record: 11 min, against 19 h last JanuaryNo major finding. One minor, with its corrective actionClause 4: 2 records sampledClause 5: 2 records sampledClause 6: 3 records sampledClause 7: 7 records sampled, 2 of them the threadClause 8: 11 records sampled, 2 of them the threadClause 9: 5 records sampled, 3 of them the threadClause 10: 4 records sampled, 1 of them the thread9.1.2: CMP-⁠118, shared as a published, read-only copy for 30 days8.7: NC-⁠207, shared as a published, read-only copy for 30 days10.2: CA-⁠064, shared as a published, read-only copy for 30 days. Open, so shared at its published version: its effectiveness check is due Tue 30 Nov 20277.5: SI-⁠VF4-⁠03 v5, shared as a published, read-only copy for 30 days7.2: S. Albrecht's training, shared as a published, read-only copy for 30 days8.4: SCAR-⁠012, shared as a published, read-only copy for 30 days9.2: AUD-⁠066, shared as a published, read-only copy for 30 days9.3: MR-⁠2026, shared as a published, read-only copy for 30 days

Why Seal, and not Word and a shared drive.

A shared drive holds files. Seal keeps each clause's evidence as records that link, so your auditor follows one thread.

Word and a shared driveSeal
A complaintAn email, copied into a log.A record on the machine or lot it names, with the customer's words kept as sent.
Could it occur elsewhere?Answered from memory, or a spreadsheet of serials.Neil finds the units from service and goods-in records. The owner confirms them.
A procedure changeA new Word file, emailed round, the old one renamed.A new version with its approvals, linked to the action that asked for it.
Training on itA signed sheet, filed later.Assigned on approval to each role that needs it, and recorded against that version.
A supplierScored once a year from recollection.Scored from its batches, its nonconformities and its SCARs.
Internal auditA plan in a spreadsheet, findings in a report.A programme by clause, each finding linked to its action and closed with evidence.
Management reviewA week spent gathering figures for slides.Inputs Neil drafts, each figure cited to its record. The directors decide and sign.
The auditor's sampleFiles found, copied and sent while the auditor waits.Each record shared as a published, read-only copy, opened with a code Seal emails, for 30 days.

See it in Seal.

Captured with sample records: a procedure changed with its training and form, and a supplier's new site qualified as linked work.

  1. A procedure change, with what changes with it.

    The new version, the training and the form it needs, each linked, and effective only once it is approved.

    SOP-PKG-014 v05, proposed under change CHG-014, with its training, form and line-side copy linked as implementation actions, and its effective use still to be decided
    1. A proposed revisionv05 is proposed under its change, CHG-014. v04 stays in force until v05 is approved.
    2. What changes with itThe training, the form and the line-side copy change together, each linked as an action.
    3. Effective once approvedv05 takes effect only on approval. Records made under v04 keep their version.
  2. A supplier's new site, qualified as linked work.

    Each part of the qualification with its owner and state, linked to the receipt or approval it answers.

    QUAL-202, a supplier's South-site qualification: the decision, the quality agreement, the specification comparison and the site's audit evidence, each with its owner and state and linked to the receipt or approval it answers
    1. The qualification, as its workThe decision, the quality agreement, the specification comparison and the audit evidence, each a record.
    2. Each with its owner and stateWho holds each, and where it stands. The decision is still pending.
    3. Linked to what it answersEach links to the receipt that raised it, or to the approval it compares against.

Questions about ISO 9001.

Can we get ISO 9001 certified with Seal?

You can run your ISO 9001 quality system in Seal, and your certification body audits it there. Seal does not certify you: only a certification body issues a certificate, and conformity depends on how your organisation runs its system.

We have no quality system yet. Where would we start?

With your scope and the processes you run, and any procedures you already have, however rough. Neil drafts the first procedures and their forms from how your team describes the work, and the owners edit and approve them. Once the scope is agreed and the inputs received, Seal prepares a first working process for you to evaluate within 48 hours.

Do we need a quality manual?

ISO 9001 does not ask for one. It asks for the scope, the quality policy and the quality objectives, for whatever documents your processes need, and for records that show the system working, such as calibration, evidence of competence, supplier evaluations, traceability, the review of changes, release, nonconforming outputs, internal audit results, management review results and nonconformities with the actions taken.

Which edition should we follow, ISO 9001:2015 or ISO 9001:2026?

ISO 9001:2026, published in September 2026. No initial ISO 9001:2015 certifications are made after 31 March 2028, and accredited ISO 9001:2015 certifications stop being valid on 30 September 2029. A certified system can move to the new edition at a surveillance or recertification audit, or at a special audit, once its certification body is accredited for ISO 9001:2026.

What does the certification audit look at?

At stage 1, your certification body reviews your system and whether you are ready, including whether internal audits and management reviews are planned and performed. At stage 2 it audits whether the system is implemented and effective, by sampling records. Surveillance audits follow in the first and second years and recertification in the third.

Can our auditor see the records in Seal?

Yes. You can walk an auditor through the records on screen, or share a published record with a named person: a fixed, read-only copy that they open with a code Seal emails them, for 30 days. Bioventix, which has operated under ISO 9001 and ISO 13485 since 2003 and is regularly audited by its customers, moved its document control, training, audits and CAPAs onto Seal. A customer audit since then produced positive comments on its electronic signatures and audit trails.

How are quality objectives measured?

Each objective is a record with its target and plan, and its measure is counted from the records it is about, such as on-time deliveries, complaints or nonconformities. The management review links the objectives with the other inputs it considers.

Can Neil run the quality system for us?

No. Neil drafts procedures and forms, gathers the evidence for an audit or a management review, and suggests lines of investigation. People approve every document, decide every disposition and close every corrective action, and nothing Neil drafts takes effect until a person accepts it.

Can we add ISO 13485 or GMP later?

Yes, on the same records. ISO 13485 adds requirements such as risk management in product realisation, a medical device file and documented software validation, and Seal keeps design controls, risk files and device records on the same platform. For GMP, Seal includes audit history, access controls and electronic signatures, with controls to support 21 CFR Part 11 and EU GMP Annex 11; how they apply depends on your intended use.

We are a small team. Is this too much system?

Start with what the standard and your work need: document control, training, nonconformities and corrective actions, internal audit and management review. Add supplier, design and equipment records when your processes have them. Each is configured to how you work, not the other way round.

In depth

The ISO 9001 guide6 sections, with references

All 12 capabilities
Document control
The policy, procedures and forms at their approved versions, with approval workflows and electronic signatures. Superseded versions are kept with their approval history.
Competence and training
Training mapped to procedures and roles, and assessed again when a version changes. A training prerequisite can govern the step that needs it.
Risks and opportunities
Each entry recorded against its process, with its assessment and the action taken on it.
Supplier evaluation
Supplier qualification, monitoring and audit scheduling, with an approved supplier list and its scope. A supplier corrective action request links to the finding behind it.
Nonconforming outputs
A nonconformity records what was affected, its disposition and who decided, and opens a corrective action where one is needed.
Corrective action
Cause, actions, owners and an effectiveness check, with a closure gate that can require its evidence.
Internal audit
An audit programme, each audit’s scope and evidence, and findings linked to their actions.
Control of changes
Changes to processes, documents and systems with their impact assessment, approval and implementation.
Customer feedback
Complaints with their investigation and trends, linked to the product or order they are about.
Measuring equipment
Equipment with its calibration and status, and the decisions a check outside tolerance leaves open. A formula can check a calibration date before a result is accepted.
Management review
A review record that links the audits, objectives, nonconformities, feedback and supplier performance it considers. Neil gathers them; the decisions are your management’s.
Procedures drafted by Neil
Neil drafts procedures and their forms from how your team describes the work. Each draft is a starting point that its owner edits and approves.

See your process in Seal.

Working 48 hours after we agree its scope: tested, with evidence your QA approves.