RM-203 downstream trace and quantity exceptions
The issue to INT-203 and its split link both downstream batches to RM-203. B-203B's unposted consumption is a missing quantity, not evidence that the batch is unrelated. Carry that batch into the trace while requesting the transaction needed to reconcile consumption. Keep the genealogy question—where material went—separate from whether every quantity is accounted for.
Source evidence and search scope
RM-203 (Material issue); INT-203 (Intermediate split); B-203B (Downstream reconciliation)
RM-203 / Material issue
- Recorded evidence
- 40 kg issued to intermediate INT-203
INT-203 / Intermediate split
- Recorded evidence
- Recorded split to B-203A and B-203B
B-203B / Downstream reconciliation
- Recorded evidence
- Final consumption quantity not posted
Inputs needed for your own records
- Receipt and supplier-lot identifiers
- Issue, return and consumption transactions
- Intermediate-to-finished-batch links and shipment scope if authorised
Quality determines product impact and any market action. Recorded consumption identifies candidates; it does not itself establish a defect or authorise a recall.
Fictional source snapshots. No live query, assignment or approval.
