All use cases

Assess material shortages before production.

Compare ERP demand with suitable stock, reservations and quality holds to explain which production orders lack usable material.

Book a demo
Illustration of a seal following a reagent container from storage through identity scanning.

You: PO-201 needs 120 kg of RM-04. There are 140 kg on site—why isn't the order ready?

neil

Only 90 kg is released and unreserved. The other 50 kg is on quality hold, so the order is currently 30 kg short of eligible material. Physical stock and material we can propose for use are different totals.

Held stock does not close the gap
Held stock does not close the gap. Demand, Available, On hold: 120 kg, 90 kg, 50 kg. Example records.120 kgDemand90 kgAvailable50 kgOn hold

You: What are our options without assuming the held lot will be released?

neil

I would compare a suitable transfer or new supply, a reviewed schedule change, and the held lot's actual assessment timeline as an uncertain option. Each needs compatible material, available quantity and confirmed timing. I would keep the hold intact and show which assumptions each schedule depends on.

You: Write this up for review, with the sources and the follow-up work we need.

neil

Here is the draft. I have kept the supported finding separate from the open questions, and prepared the evidence requests for the responsible roles.

PO-201 material-shortage optionsReview draft · source evidence and assessment

PO-201 material-shortage options

Physical stock totals 140 kg, but only 90 kg is both released and unreserved. Against 120 kg of demand, the usable supply gap is 30 kg. Keep the held lot separate in any proposed allocation. A purchase, transfer or later quality decision may change readiness, but none is established merely by the existence of the held stock.

Source evidence and search scope

PO-201 (ERP order demand); LOT-201 (Available stock); LOT-202 (Held stock)

PO-201 / ERP order demand

Recorded evidence
120 kg of RM-04 required

LOT-201 / Available stock

Recorded evidence
90 kg released and unreserved

LOT-202 / Held stock

Recorded evidence
50 kg under quality hold
Inputs needed for your own records
  • Production orders and their versioned bills of material
  • ERP stock by lot, location and reservation
  • Quality status, expiry and confirmed inbound receipts

Planning and quality owners confirm allocations and suitability. Stock on hand or an expected delivery is not permission to issue material.

Fictional source snapshots. No live query, assignment or approval.

Follow-up work and evidence requests2 proposed tasks · not assigned

Evidence to request

Source 30 kg of eligible RM-04
Material planner
Confirm compatible lot/specification, released quantity, reservations and arrival timing for any proposed transfer or purchase.
Compare feasible production windows
Production planner and quality owner
Separate confirmed supply from an unresolved hold assessment. Obtain current status and accepted commitments before confirming the order slot.
Example conversation · prepared replies

See this job with your team.

Tell us how your team handles this job today. We’ll walk through the analysis, supporting evidence and review steps in a demo.

Book a demo
What to bring for this job
  • Production orders and their versioned bills of material
  • ERP stock by lot, location and reservation
  • Quality status, expiry and confirmed inbound receipts

Source access, permissions and permitted actions are agreed for your environment.

Source excerpt

PO-201

ERP order demand

Recorded evidence
120 kg of RM-04 required

Selected fictional record, not a live source-system view.