1Where ICH Q1 stands, and when it applies.
The ICH Assembly adopted ICH Q1, Stability Testing of Drug Substances and Drug Products, as a final harmonized guideline at its Prague meeting on 17 and 18 November 2026, “to be published on the ICH website in the coming weeks for implementation”. It “will supersede seven current guidelines”, Q1A to Q1F and Q5C,1 though ICH withdrew Q1F in 2006.2 On 25 November 2026 ICH’s guideline page still shows Q1 at Step 3 and offers only the Step 2 draft.2 Until the final text appears, the Step 2 draft (PDF) is the text to assess against. Quotations from Q1 on this page are the draft’s wording, and the final text may differ.3
| Date | Milestone |
|---|---|
| 11 April 2025 | Step 2b draft released for consultation3, |
| 30 April to 30 July 2025 | EMA consultation, EMA/ |
| July and August 2025 | Other regulators’ deadlines, FDA’s on 25 August2 |
| February 2026 | Work plan expects Step 4 in November 20265 |
| July 2026 | Revised plan: Step 3 sign-off and Assembly review for Step 4 in December 20266 |
| 17 and 18 November 2026 | ICH Assembly adopts Q1 as a final guideline, the text to follow “in the coming weeks”1 |
| June 2027 | Training material due6 |
Adoption is Step 4, not implementation: each regulator then sets its own date.5 ICH Q2(R2), adopted on 1 November 2023, took effect at FDA on 7 March 2024, in the EU on 14 June 2024 and in Japan on 9 October 2025: four months to almost two years later.2 Switzerland differs. Swissmedic says “In general, implementation in Switzerland coincides with the date of Step 4 adoption”, and ICH records it implementing Q2(R2) on 1 November 2023.7,
1.1What applies now, and what to prepare for.
Q1A(R2) to Q1E and Q5C apply until your regulator implements Q1, and for US finished drugs the binding rule is 21 CFR 211.166: a written stability testing program whose results set storage conditions and expiry dates.8 On 25 November 2026 FDA still lists its June 2025 publication of the draft, marked “Not for implementation”,9 EMA gives Q1A(R2) as its current effective version and Q1 as a Step 2b draft,10,
2Gap checklist for your stability program.
Copy this into a gap assessment. Each line gives what the Step 2 draft section asks, the current rule where that is the change, and the record that closes the gap.3
| Area | Check | Section | Evidence |
|---|---|---|---|
| Hold times | A maximum hold for each intermediate; risk assessment says where a study is needed, transport included | 9.1, 9.2 | Hold-time risk assessment and report |
| Long holds | Synthetics: evidence for prolonged holds, such as over 30 days in total for solid doses or 24 hours for non-solid and sterile products, filed when requested | 9.2 | Hold-time study report |
| Biologic holds | Physicochemical and microbial holds studied; the shorter applies | 9.3 | Report stating both limits |
| Short-term claims | Generally at least two batches stay within shelf-life specifications | 10 | Short-term storage report |
| In-use claims | Generally two batches, one toward the end of shelf life | 11.2.1 | In-use study report |
| Contact materials | Compatibility with everything used in preparation and administration | 11.1 | Compatibility report |
| Orientation | Primary batches of liquids, solutions, semi-solids and suspensions stored inverted and upright, unless data justify a worst case. Q5C asked it only of biological liquids that might interact with the closure. | 5 | Protocol and unit count |
| Start of shelf life | Defined, stored intermediates included | 13.1.2, 13.1.3 | SOP clause |
| Excursions | Each assessed with stability, stress, transport or modeling data, within the quality management system | 14.1 | Deviation record citing the data |
| Biologic filing data | Three primary batches; if not production scale, also at least 6 months on production batches at filing. Q5C accepted pilot-scale data with a post-approval commitment. | 3.2, Table 1 | Filing plan with production-batch start dates |
| Multiple sites | Synthetics: a commitment study per site, under three batches only if justified. Biologicals: Table 1 data per site unless justified. Not in Q1A(R2). | 4.2 | Per-site data and commitment protocol |
| Ongoing program | Each site adds a production batch of each strength a year | 15.2 | Annual batch log per site |
| Changes | Stability risk assessment for each change; extension on three production or primary batches. Q1A(R2) excluded variations. | 15.3 | Change-control assessment |
| Testing frequency | Q5C’s monthly pulls for 3 months now apply to any shelf life of 12 months or less; sterility or container closure integrity at least yearly | 6 | Pull and test schedule |
| Accelerated stop | Synthetics may stop after a significant change or out- | Table 1 | Protocol clause |
| Stress studies | Stress, such as freeze-thaw, on one batch, now separate from forced degradation, which adds exposed drug product | 2 | Development stability report |
| Photostability | Q1B’s exposure, plus an LED option; a confirmatory study where a risk is found, biologicals and light in manufacture and use included | 8 | Photostability report |
| Device combinations | Assembled product on stability; shelf life the shorter of the parts. New. | 3.6 | Combination product protocol |
| Reference materials | Stability data support each in-house material’s use period: generally filed for biologicals, kept in the pharmaceutical quality system for synthetics. Where potency is measured against one, consider tighter criteria and trending to prevent drift. | 12.1 | Reference material stability report |
| Novel excipients | First used in a drug product, or by a new route: effect on stability assessed and filed. Protein ones, such as albumin: interaction and immunogenicity too. | 12.2 | Excipient risk assessment |
| Vaccines | Production-scale batches; potency, adjuvant and conjugate attributes studied; adjuvant stability from formal studies, filed | 3.5, 4.3, 12.3 | Batch rationale, adjuvant stability report |
| Continuous manufacture | ICH Q13 applies; protein batches from several harvests, not one start-up | 4.4 | Batch selection rationale |
| Markets | Long-term condition justified for each climatic zone supplied. All zones now sit in one table, and 30°C/75% RH can be justified for all. | 7.2 | Protocol rationale |
| Semi-permeable packs | Intermediate at 30°C/35% RH, not 30°C/65% RH; water loss at 25°C/40% RH | 7.2.2 | Protocol, once the final text confirms it |
| Confidence limits | Two-sided 95% limit for attributes with upper and lower criteria, where Q1E used one side if the direction of change was known | 13.2.1 | Statistical analysis plan |
| Pooling | Approach to combining batches defined before the data arrive | 13.2.2 | Statistical analysis plan |
3What may still move, and what to do now.
By our count, EMA’s overview has roughly 1,290 comment rows, almost all tied to a line of the draft, and nearly half are EFPIA’s.13 Section 3 on protocol design drew about 170, half of them on 3.2 and Table 1’s data package, many about biologicals; Annex 2 on modeling about 150; section 13 on data evaluation about 140; section 9 on holding times about 90, many asking how many batches are needed, whether pilot-scale holds must be repeated at production scale and whether hold data go in the dossier; section 4 on batches about 90; and Annex 3 about 80. Counts measure attention, not disagreement. Some rows do disagree: in rows marked critical, EFPIA asked for the 6 months on biologic production batches to drop to 3 months or be deleted, warning that it “risks delaying patient access to medicines”.13
- Do now what current texts already ask for: production time limits where appropriate, with stability data for unstable intermediates or holds a risk assessment does not cover (US, EMA and WHO texts, below); in-use data or a justification for multi-dose products in the EU, with at least two batches tested; and a defined start of shelf life (the EU’s 2001 note, and 21 CFR 610.50 for US biologics).19,
20, 18, 21, 22, 23, 24 - Wait for the final text on conditions the draft changes: 30°C/35% RH intermediate for semi-permeable packs, and refrigerated accelerated studies without humidity control or at a justified temperature other than 25°C.3,
14 - Record, don’t rewrite. Log gaps against the most-commented text (Annex 2, Table 1’s biologics package, section 9’s batch rules) without copying the draft’s wording into protocols: the working group revised the text against these comments, and ICH has not yet published the result.5,
2
4How it runs in Seal.
Open each gap in your stability program now as a change in Seal’s change control, with the regulatory update as its trigger. Approval, implementation and permission to use the new revision are separate decisions, so you can agree the scope today and implement when the final text arrives. The change connects the revision to every affected record and sets the effective point only after that evidence is reviewed. Neil, Seal’s AI agent, traces what a change affects and shows what still blocks release; your team confirms the scope and approves.
In Seal’s stability management, the revised protocol is a new version: pulls already executed keep the version they followed, and ongoing placements carry forward with their owners and due dates, so moving a study to the new Q1 does not rewrite the pulls already run. Each pull records its units, times and handoffs from chamber to laboratory, and a missing result stays visible as work with an owner and a source.
5What else changes, topic by topic.
These are changes the checklist lists briefly or not at all; Step 2 draft sections are in brackets. Unchanged for a new synthetic product: three primary batches with 12 months’ long-term and 6 months’ accelerated data at filing.14,
| Topic | Current guidelines | ICH Q1, Step 2 draft |
|---|---|---|
| Scope | Q1A(R2): new synthetic products, not abbreviated filings or variations.14 Q5C: biotechnological products.17 | Synthetics, biologicals, vaccines, advanced therapy medicinal products (ATMPs), the drug part of combination products, co-packaged diluents (1.2).3 |
| Generic filings | Outside Q1A(R2).14 FDA asks for three batches, 6 months long-term and 6 accelerated.25 The EU accepts two pilot-scale batches for conventional forms of stable actives.26 | Three batches, 6 months long-term and 6 accelerated (Table 1).3 |
| Refrigerated products | Accelerated 25°C/60% RH.14 | 25°C or a justified alternative; humidity control may not be needed (7.3).3 |
| Frozen products | −20°C ± 5°C; lower case by case.14 | −20°C or below, with excursion studies at, for example, 5°C, 25°C or 30°C (7.4).3 |
| Extrapolation | Q1E: up to twice the data, at most 12 months beyond; 1.5 times and 6 months if refrigerated; none if frozen.16 Q5C: real-time data only.17 | Synthetics: same, and frozen ones may be extrapolated with modeling (13.2.8). Frozen, well-characterized biological drug substance: up to 1.5 times, at most 12 months beyond (13.2.9).3 |
| Start of shelf life | EU since December 2001: release date, or production date if release is over 30 days later; not biologicals.23 US biologics: a date of manufacture the license names.24 | Production date, the first step combining the active with other ingredients, or release date if within 30 days. Biologicals: date of manufacture, such as filtration or filling (13.1.2, 13.1.3).3 |
| Biologic re-test period | None in Q5C.17 | Possible for a well-understood substance, such as a frozen IgG antibody (13.1.1).3 |
Neither 211.166 nor 211.137, which requires the expiry date, fixes when US shelf life starts.8,
6Holding times, short-term storage and in-use.
6.1Holding times are less new than they look.
Section 9 of the draft asks for a maximum holding time for each intermediate, from dispensed raw materials to bulk product.3 Much of that is in current texts already:
- US. 21 CFR 211.111 requires time limits for each phase of production “when appropriate”.19 FDA’s laboratory controls Q&A lets a risk assessment set holds for stable intermediates and expects stability studies for unstable materials or longer holds.20
- EU. EMA’s 2017 guideline on manufacture of the finished dosage form already says: “As a general rule, prolonged storage means more than 30 days for solid oral dosage forms and more than 24 hours for sterile products.” Where relevant, prolonged bulk holds are justified in the dossier with stability data on at least two pilot-scale batches. Hold-time validation for intermediates is “a GMP matter” that need not normally be filed, though sterile and biological products may need data.18
- WHO says “Consideration should also be given to hold-time studies of bulk products”, for example where bulk may be stored for more than 30 days before packaging or shipping.21
New for synthetics in the draft: the 24-hour example now covers non-sterile, non-solid forms too, and holds studied below production scale are to be verified on production batches under a post-approval commitment.3 Hold-time studies covers study design and what inspectors cite.
6.2Short-term storage and in-use.
In the draft, short-term storage is optional storage outside the long-term condition in the unopened container, such as a refrigerated product a patient keeps at room temperature for a stated time. The label states it beside the long-term condition, and it “is not intended to be applied beyond the shelf life”.3 Single-use containers for immediate use that need no preparation generally need no in-use period.3 In-use stability covers study design.
7Biologics and advanced therapies.
For biologicals, accelerated data do not set shelf life, though the draft strongly suggests submitting them, and applicants are encouraged to agree any drug product extrapolation with the regulator. After a manufacturing change, a successful ICH Q5E comparability exercise, stability included, lets the pre-change shelf life carry over.3
The draft’s Annex 3, on ATMPs, generally expects three primary batches but allows another number on a risk basis, accepts clinical batches below production scale if comparability is shown, and may accept healthy-donor data alongside patient data where patient material is scarce, as with autologous CAR-T cells. Shelf life should generally rest on long-term data.3 For the wider GMP picture, see cell and gene therapy GMP requirements.
8Statistics, reduced designs and modeling.
Section 13.2.1 changes one calculation. Q1E compares the lower or upper one-sided 95% limit with the acceptance criterion when the direction of change is known, and two-sided limits when an attribute can move either way or its direction is unknown.16 The Step 2 draft recommends “a two-sided 95% confidence limit” for attributes “with upper and lower acceptance criteria”, then says the limits “may each be evaluated individually as one-sided limits”.3 Annex 2 instead says confidence bounds “may be one-sided or two-sided, depending on their acceptance criteria and if the attribute is known to be increasing or decreasing”.3 Read as a two-sided 95% interval, a falling assay with limits of 95.0 to 105.0% is judged on a lower bound at 97.5% confidence, not 95%, so the bound reaches 95.0% sooner and the same data support a shorter shelf life. EFPIA and Cencora Pharmalex said the wording could confuse; PDA and Regeneron asked for a two-sided 90% limit, the equivalent of two one-sided 95% limits, Regeneron warning that “The unequal standards will shorten shelf-lives for two-sided specifications”.13 State the sidedness in your statistical analysis plan, and check it against the final text.
Annex 1 keeps Q1D’s bracketing and matrixing and adds knowledge- and risk-based reductions, such as a tablet commitment study that drops the 9- and 18-month pulls because trends are not significant, and the 25°C/60% RH condition because the product is known to be stable at 30°C/75% RH.3 Annex 2 keeps Q1E’s regression and batch-pooling tests and adds mixed-effects models with tolerance intervals where five or more batches are available.3 Its enhanced stability modeling (A2-2) is for “well-understood drug substances or drug products that have been extensively characterised”, degradation pathways included, and applicants are encouraged to consult regulators on what to submit. A model that sets a commercial re-test period or shelf life is a “High-Impact Model”, and the submission should describe how its risks are managed. Models are “not intended to replace long-term stability studies”: long-term data through the proposed shelf life “should be performed in addition to the model”.3
AQuestions and answers
Does the new ICH Q1 change the ongoing program for marketed products?
Not much, on the Step 2 draft’s wording. Section 15.2 keeps at least one production batch of the drug substance and of each strength of the drug product a year, says each production site keeps its own program, and lets the ongoing protocol differ from the primary one, with attributes and time points reduced as knowledge grows. EU GMP already asks for one batch a year of each strength and primary pack. The draft adds that ongoing studies are generally managed within the quality system unless a regulator asks for the data.
What happens to stability studies in progress once ICH Q1 applies?
Neither ICH’s adoption notice nor the Step 2 draft says. The draft has no transition provisions, a consultation comment asked for a plan for legacy products, and the final text is not yet published. Each regulator sets its own implementation date; in Switzerland it generally coincides with adoption. Until the final text or a regulator’s notice says otherwise, finish each study under the protocol it started with, and route any change to that protocol through change control.
Does ICH Q1 apply to clinical trial material?
Not directly. The Step 2 draft says it is not directly applicable during clinical development, though its concepts can apply in proportion to growing product knowledge, and development batches that meet primary stability requirements can support a later submission. It does not apply to device constituent parts, radiopharmaceuticals or whole blood.
Does ICH Q1 replace ICH Q5C?
Yes, once each regulator implements it. ICH adopted Q1 in November 2026 as the guideline that will supersede Q5C along with Q1A to Q1F. The Step 2 draft brings the stability of biotechnological and biological products into the same sections as synthetic products, with product-specific guidance where they differ.
Does the new guideline cover cell and gene therapies?
Yes, in the Step 2 draft. Autologous and allogeneic cell-based products and gene therapy products are in scope, with additional considerations in Annex 3. That annex supplements the core guideline: where it is silent, the core sections apply.
References27 sources
References
- 1Key Outcomes of Biannual ICH Assembly Meeting in Prague, press release, ICH, 19 November 2026. https:/
/ www. ich. org/ pressrelease/ key- outcomes- biannual- ich- assembly- meeting- prague (read 25 November 2026) - 2Quality Guidelines: Q1A to Q1F, Q1 EWG and Q2(R2) implementation status, ICH. https:/
/ www. ich. org/ page/ quality- guidelines (read 25 November 2026) - 3ICH Q1 Stability Testing of Drug Substances and Drug Products, Step 2 draft, sections 1 to 15 and Annexes 1 to 3, ICH, endorsed 11 April 2025. https:/
/ database. ich. org/ sites/ default/ files/ ICH_ Q1EWG_ Step2_ Draft_ Guideline_ 2025_ 0411. pdf (read 25 November 2026) - 4ICH Q1 guideline on stability testing of drug substances and drug products, Step 2b, consultation page, European Medicines Agency. https:/
/ www. ema. europa. eu/ en/ scientific- guidelines/ ich- q1- guideline- stability- testing- drug- substances- drug- products (read 25 November 2026) - 5ICH Q1 EWG Work Plan, ICH, 11 February 2026. https:/
/ database. ich. org/ sites/ default/ files/ ICH52_ Q1_ EWG_ WorkPlan_ 2026_ 0318. pdf (read 25 November 2026) - 6ICH Q1 EWG Work Plan, ICH, 10 July 2026. https:/
/ database. ich. org/ sites/ default/ files/ ICH53_ Q1_ EWG_ WorkPlan_ 2026_ 0818. pdf (read 25 November 2026) - 7International Council for Harmonisation (ICH): information on implementation of ICH Guidelines by Swissmedic, Swissmedic, last modified 23 June 2026. https:/
/ www. swissmedic. ch/ swissmedic/ en/ home/ about- us/ international- collaboration/ multilateral- co- operation- with- international- organisations- - - ini/ international- council- for- harmonisaton. html (read 25 November 2026) - 821 CFR 211.166, Stability testing, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 166 (read 25 November 2026) - 9Q1 Stability Testing of Drug Substances and Drug Products, Draft Guidance for Industry, FDA, June 2025. https:/
/ www. fda. gov/ regulatory- information/ search- fda- guidance- documents/ q1- stability- testing- drug- substances- and- drug- products (read 25 November 2026) - 10ICH Q1A (R2) Stability testing of new drug substances and drug products, Scientific guideline, European Medicines Agency. https:/
/ www. ema. europa. eu/ en/ ich- q1a- r2- stability- testing- new- drug- substances- drug- products- scientific- guideline (read 25 November 2026) - 11International Council for Harmonisation of Technical Requirements for Pharmaceuticals for Human Use Guidelines, MHRA, updated 5 November 2026. https:/
/ www. gov. uk/ guidance/ international- council- for- harmonisation- of- technical- requirements- for- pharmaceuticals- for- human- use- guidelines (read 25 November 2026) - 12ICH Q1 Step 2 Presentation, ICH, 11 April 2025. https:/
/ database. ich. org/ sites/ default/ files/ ICH_ Q1_ Step2_ Presentation_ 2025_ 0411_ 0. pdf (read 25 November 2026) - 13Overview of comments received on ICH Q1 Guideline on stability testing of drug substances and drug products, EMA/240075/2025, European Medicines Agency, 8 August 2025. https:/
/ www. ema. europa. eu/ en/ documents/ scientific- guideline/ overview- comments- received- ich- q1- guideline- stability- testing_ en. pdf (read 25 November 2026) - 14ICH Q1A(R2) Stability Testing of New Drug Substances and Products, ICH, 6 February 2003. https:/
/ database. ich. org/ sites/ default/ files/ Q1A%28R2%29%20Guideline. pdf (read 25 November 2026) - 15ICH Q1B Stability Testing: Photostability Testing of New Drug Substances and Products, ICH, 6 November 1996. https:/
/ database. ich. org/ sites/ default/ files/ Q1B%20Guideline. pdf (read 25 November 2026) - 16ICH Q1E Evaluation of Stability Data, ICH, 6 February 2003. https:/
/ database. ich. org/ sites/ default/ files/ Q1E%20Guideline. pdf (read 25 November 2026) - 17ICH Q5C Stability Testing of Biotechnological/
Biological Products, ICH, 30 November 1995. https:/ / database. ich. org/ sites/ default/ files/ Q5C%20Guideline. pdf (read 25 November 2026) - 18Guideline on manufacture of the finished dosage form, Revision 1, EMA/
CHMP/ QWP/ 245074/ 2015, section 4.4, European Medicines Agency, adopted 20 July 2017. https:/ / www. ema. europa. eu/ en/ documents/ scientific- guideline/ guideline- manufacture- finished- dosage- form- revision- 1_ en. pdf (read 25 November 2026) - 1921 CFR 211.111, Time limitations on production, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 111 (read 25 November 2026) - 20Questions and Answers on Current Good Manufacturing Practice Requirements: Laboratory Controls, question 14, FDA. https:/
/ www. fda. gov/ drugs/ guidances- drugs/ questions- and- answers- current- good- manufacturing- practice- requirements- laboratory- controls (read 25 November 2026) - 21Stability testing of active pharmaceutical ingredients and finished pharmaceutical products, WHO Technical Report Series No. 1010, Annex 10, section 2.2.11, WHO, 2018. https:/
/ cdn. who. int/ media/ docs/ default- source/ medicines/ norms- and- standards/ guidelines/ regulatory- standards/ trs1010- annex10- who- stability- testing- of- active- pharmaceutical- ingredients. pdf (read 25 November 2026) - 22Note for guidance on in-use stability testing of human medicinal products, CPMP/QWP/2934/99, European Medicines Agency, in operation since September 2001. https:/
/ www. ema. europa. eu/ en/ documents/ scientific- guideline/ note- guidance- use- stability- testing- human- medicinal- products_ en. pdf (read 25 November 2026) - 23Note for guidance on start of shelf-life of the finished dosage form, CPMP/QWP/072/96, European Medicines Agency, in operation since December 2001. https:/
/ www. ema. europa. eu/ en/ documents/ scientific- guideline/ note- guidance- start- shelf- life- finished- dosage- form- annex- note- guidance- manufacture- finished- dosage- form_ en. pdf (read 25 November 2026) - 2421 CFR 610.50, Date of manufacture for biological products, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 610. 50 (read 25 November 2026) - 25ANDAs: Stability Testing of Drug Substances and Products, Questions and Answers, Guidance for Industry, FDA, May 2014, questions A3(i) and A6. https:/
/ www. fda. gov/ media/ 87051/ download (read 25 November 2026) - 26Guideline on stability testing: stability testing of existing active substances and related finished products, CPMP/QWP/122/02 Rev 1 corr, section 2.2.3, European Medicines Agency, in operation since March 2004. https:/
/ www. ema. europa. eu/ en/ documents/ scientific- guideline/ guideline- stability- testing- stability- testing- existing- active- substances- related- finished- products_ en. pdf (read 25 November 2026) - 2721 CFR 211.137, Expiration dating, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ section- 211. 137 (read 25 November 2026)
