1How to choose a LIMS, step by step.
No regulation sets a selection procedure, but EU GMP Annex 11 and PIC/S set what one should leave behind: user requirements based on documented risk assessment and GMP impact, a supplier assessed for competence and reliability, and systems “appropriately evaluated for data integrity controls prior to purchase”.1,
- Form the team. The laboratory’s process owner leads, with the system owner, QA and IT; Annex 11 asks for “close cooperation” between them.1 Record: a charter stating the intended use and scope.
- Map samples and data. Trace each sample type from receipt to release, and each instrument’s output to where it is kept. PIC/S suggests a data flow map to find the weak points of interfaced systems, and Annex 11 expects a critical system to have a description of its data flows and interfaces.2,
1 Record: the map and an instrument list. - Write the requirements. Start from the checklist below and mark each line must or should by its GMP impact.1 Record: the user requirements specification; see how to write a URS.
- Ask suppliers to answer each line. Standard, configured, customized or not available, with evidence. The draft revision of Annex 11 wants it clear what configuration adds, so the answers become your first configuration list.3 Record: the responses and a shortlist.
- Run scripted demonstrations. Each shortlisted supplier runs your own sample through your methods, using the last column of the checklist, and you score what you saw. Record: the completed scripts and a scorecard.
- Assess the supplier and agree terms. Audit or assess it according to risk, check its documentation against your requirements, and write its responsibilities into a formal agreement.1 A reference call to a GMP laboratory of similar scope tests its reliability: ask how validation went, how upgrades are tested and how long its last new method took to release. Compare cost over the whole contract, not the first year; see what a LIMS costs. Record: the assessment, reference notes and agreement, which feed the validation plan.
2A LIMS requirements checklist to copy.
Each line is something the rules require of GMP laboratory records, or of the system that holds them, with a test to run in the demonstration. 21 CFR 211.194 is the US list of what a laboratory record must contain and paragraph 6.17 of EU GMP Chapter 6 the EU minimum; the controls come from 211.68, Part 11 and Annex 11.4,
| Requirement | The LIMS must | Basis | Test it by |
|---|---|---|---|
| Sample identity | Record source, quantity, lot, date taken and date received | 211.194(a)(1) | Logging a real sample |
| Method and specification | Record which method and specification version each test used, and any method modification with its reason and supporting data | 211.194(a)(2), (b); 6.17(iii) | Revising a specification mid-test |
| Sample weights | Take weights from the balance, or check manual entries a second time | 211.194(a)(3); Annex 11, 6 | Typing one weight by hand |
| Instruments | Record the instrument used; block any whose calibration or qualification is overdue; keep or link its calibration records | 211.160(b)(4); 211.194(d); 6.7(iii), 6.17(ix) | Selecting an overdue balance |
| Complete data | Keep or link all instrument data, not only the reported result | 211.194(a)(4) | Importing your own instrument file |
| Calculations | Calculate as the method does, with units and factors | 211.194(a)(5); 6.16 | Checking one result by hand |
| Result and decision | Compare with the specification; record a dated approval or rejection | 211.194(a)(6); 6.17(viii) | Entering a failing result |
| People | Record who tested and when, and who reviewed | 211.194(a)(7), (8); 6.17(v) to (vii) | Reviewing your own test |
| Standards and reagents | Hold preparation, standardization and expiry records | 211.194(c); 6.19 to 6.21 | Selecting an expired standard |
| OOS and trends | Route out- | 211.192; 6.7(iv), 6.9, 6.16 | Raising an OOS; plotting an attribute across lots |
| Stability | Hold stability study records | 211.194(e) | Pulling a time point |
| Saving entries | Save entries as they are made, not only at the end | FDA Q&A 12 | Closing a worksheet mid-entry |
| Access | Restrict changes to data, methods and specifications; keep administrator rights away from those who create the data | 211.68(b); FDA Q&A 4 | Asking who can switch off the audit trail |
| Audit trail | Record who changed what, when and why, keeping the original visible; show it to the reviewer with the result | 11.10(e); Annex 11, 9; FDA Q&A 7 | Reviewing a corrected result as the second analyst, then tracing a reported result to its instrument file, calibration and method version |
| Signatures | Show name, date, time and meaning, linked to the record | 11.50, 11.70; Annex 11, 14 | Signing a review |
| Copies and backup | Give inspectors complete copies; back up and restore | 11.10(b), (c); Annex 11, 7 and 8 | Exporting one whole record |
| Changes after go-live | Let named roles build a new method or specification version, test it and have QC approve it before release; earlier results keep theirs | 211.160(a); FDA Q&A 3; Annex 11, 10 | Timing the supplier adding a method and releasing it |
Two judgment calls sit behind the table. The EU and US lists differ: Chapter 6 adds the equipment used, results recorded so they can be trended, and calculations “critically examined”, while 211.194(a)(8) requires a second person’s review of the original records of every test, where 6.17(vii) asks for verification “where appropriate”.5,
3Example: scoring three LIMS.
Example, invented: a QC laboratory scores three shortlisted suppliers after each ran the demonstration on a sample from Batch 26-114 of Product X tablets. Functional scores follow the suppliers’ answers in step 4, as seen in the demonstration: 3 standard and shown on the laboratory’s own data, 2 by configuration, 1 by customization, 0 not possible. The supplier and contract rows score 3 to 0 on the assessment and the terms offered, and supplier and validation includes the timed method change from the checklist. Points are weight times score.
| Criterion | Weight | Supplier A | Supplier B | Supplier C |
|---|---|---|---|---|
| Records and calculations | 25 | 3 (75) | 1 (25) | 2 (50) |
| Instrument data | 20 | 2 (40) | 3 (60) | 2 (40) |
| Access and audit trail | 20 | 3 (60) | 3 (60) | 2 (40) |
| Review, OOS, trending | 15 | 2 (30) | 3 (45) | 2 (30) |
| Supplier and validation | 10 | 2 (20) | 3 (30) | 1 (10) |
| Contract and exit | 10 | 1 (10) | 3 (30) | 2 (20) |
| Points out of 300 | 100 | 235 | 250 | 190 |
| Every must met | Yes | No | Yes |
Supplier B scores highest and is still out. Its microbial limit test reported the average plate count, and applying the dilution factor needed a spreadsheet outside the system. That fails a must: 211.194(a)(5) requires a record of every calculation, and 211.68(b) requires input and output to be checked for accuracy.4,
4Decide where the original instrument data will live.
This decision shapes the architecture more than any feature. FDA says a balance or pH meter printout can be the original record, but files from some instruments “are dynamic”: an FT-IR spectral file can be reprocessed, so a printout or static copy of it does not satisfy the requirement to keep originals or true copies.10 EU GMP asks you to define which electronic data are raw data, at least “all data on which quality decisions are based”.15
| The instrument gives | The original is | The LIMS holds | Basis |
|---|---|---|---|
| A printout only | The printout or a true copy | The value, by interface or checked entry | FDA Q&A 10; Annex 11, 6 |
| A dynamic file | The file in the instrument’s data system | The result, linked to the file and its audit trail | FDA Q&A 10; 211.194(a)(4) |
| A static file | The file, or a true copy | The file, attached to its result | 211.194(a)(4); Annex 11, 5 |
| A reading typed in | The LIMS entry | The entry, second-checked if critical | Annex 11, 6 |
Interfaces belong in the requirements too. The draft revision of Annex 11 uses this very case: critical data moving “from a laboratory instrument to a LIMS system” should, where possible, “be based on validated interfaces rather than on manual transcriptions”.3 For the route to choose for each instrument, see integrating instruments with a LIMS.
5What inspectors look at.
PIC/S tells inspectors to “verify that the implementation of new systems followed a process that gave adequate consideration to DI principles”, so the requirements, data flow map and supplier assessment are evidence in their own right.2 Investigators also compare what the system does with your methods and instruments, as two FDA warning letters show:
your Laboratory Information Management System (LIMS) did not include a dilution factor to calculate the number of cfus per gram or milliliter of product for microbial limit test results, as required by your own procedures and applicable compendial methods.
Reliance Life Sciences, warning letter 320-26-117 of 18 August 2026. Releasing on raw plate count averages, FDA wrote, meant the firm lacked “scientific evidence that each batch conforms to predetermined specifications prior to distribution”.16
the time stamp on each of the analytical balance and (b)(4) printouts did not match your Laboratory Information Management System (LIMS) records.
Intas Pharmaceuticals, warning letter 320-23-20 of 28 July 2023. FDA asked for a list of all software configurations, LIMS included, with every user’s privileges, and for plans to bring more data from standalone balances, pH meters and water content testing into the LIMS network.17
Both are selection questions: does the system calculate as your method does, and do the data from every instrument arrive with a time you can trust?
6The supplier, the contract and what is changing.
Annex 11 expects a supplier’s quality system and audit information to be available to inspectors on request.1 Its testing is not enough on its own: PIC/S says companies “should therefore not place sole reliance on vendor qualification packages”, and MHRA says that accepting vendor validation data “in isolation of system configuration and users intended use is not acceptable”.2,
Plan the move of old data while you choose. Annex 11 requires migrated data to be checked as “not altered in value and/or meaning”, so ask each supplier for its migration tools and try them on a sample of your legacy results; see validating a data migration.1
Three things have moved since most selection guides were written:
- FDA reissued its final computer software assurance guidance on 3 February 2026, superseding the version of 24 September 2025. Written for device makers, it lists what a vendor assessment can draw on: an onsite audit if applicable, SOC reports and ISO certifications, the vendor’s development, testing and cybersecurity practices, and its data integrity controls.18
- The draft revision of Annex 11, consulted on from 7 July to 7 October 2025, would have contracts define an exit strategy “by which the regulated user may retain control of system data”, and agree how new versions are released and the user’s “possibility to test these prior to release”.19,
3 - It is still a draft. EudraLex Volume 4 lists the January 2011 Annex 11, and EMA’s inspectors aim to give the Commission a final text in the fourth quarter of 2026.20,
21 Ask for the draft’s contract terms now; they are easier to agree before signing than after.
7How it runs in Seal.
Seal’s LIMS comparison lists what to check when choosing: who configures it and how long until a first method runs, whether samples, specifications, stability, OOS investigations, batch records and quality events share one set of records, whether it reads the files your instruments already save, and whether each change is released with acceptance tests while earlier results keep the version they ran under. In Seal, each result is captured as the work runs, with its sample, preparation, method, specification and instrument file attached, and the original instrument file is kept with the result it produced; see the LIMS in Seal.
You can start with one release test, incoming-inspection workflow or stability study in a 48-hour evaluation, alongside the LIMS you already run: Seal reads samples and results from LabWare, LabVantage and SampleManager without writing to them.
AQuestions and answers
Should we send LIMS suppliers an RFP?
Yes, if it is built from your requirements. Ask for an answer to every line: standard, configured, customized or not available, with the evidence for each. Use the answers to shortlist, then let a scripted demonstration on your own sample decide, because a written yes does not show how a calculation or an audit trail behaves on your data.
How many LIMS suppliers should we shortlist?
Only as many as you can take through the whole demonstration script. Each one needs your samples, instrument files and expected results prepared in advance, and your analysts’ time to watch and score, so use the written responses to cut the list first.
Can a GMP laboratory use a cloud LIMS?
Yes. The rules are the same as for an installed system: validation for your intended use, controlled access, audit trails and records you can retrieve for the whole retention period. Add a written agreement that covers the provider’s responsibilities, how releases reach you, where the data are held and how you get every record back if you leave.
Can a small laboratory use spreadsheets instead of a LIMS?
Yes. GMP does not require a LIMS; it requires laboratory records with the required content and controls. A spreadsheet whose formulas calculate reported results has to be validated for that use, and access, change and review controls still apply to it.
What if our laboratory is accredited to ISO/IEC 17025?
ISO/IEC 17025:2017 sets requirements for the competence, impartiality and consistent operation of testing and calibration laboratories. Add its requirements to the specification alongside GMP. A laboratory doing GMP testing still has to meet 21 CFR 211.194 or EU GMP Chapter 6; accreditation does not replace them.
References21 sources
References
- 1EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, European Commission, in operation since 30 June 2011. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ annex11_ 01- 2011_ en_ 0. pdf (read 26 November 2026) - 2PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments, PIC/S, 1 July 2021, sections 9.1 and 9.3. https:/
/ picscheme. org/ docview/ 4234 (read 26 November 2026) - 3Annex 11: Computerised Systems, draft revision for consultation, European Commission and PIC/S, July 2025, sections 6.6, 7.5 and 10.2. https:/
/ health. ec. europa. eu/ document/ download/ 40231f18- e564- 4043- 94de- c031f813d38b_ en?filename=mp_ vol4_ chap4_ annex11_ consultation_ guideline_ en. pdf (read 26 November 2026) - 421 CFR 211.194, Laboratory records, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- J/ section- 211. 194 (read 26 November 2026) - 5EudraLex Volume 4, Chapter 6: Quality Control, European Commission, in operation since 1 October 2014. https:/
/ health. ec. europa. eu/ document/ download/ c74c8720- 27bf- 4252- 808f- d65a206a90bb_ en?filename=2014- 11_ vol4_ chapter_ 6. pdf (read 26 November 2026) - 621 CFR 211.68, Automatic, mechanical, and electronic equipment, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- D/ section- 211. 68 (read 26 November 2026) - 721 CFR 11.10, Controls for closed systems, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11/ subpart- B/ section- 11. 10 (read 26 November 2026) - 821 CFR 211.160, General requirements (laboratory controls), eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- I/ section- 211. 160 (read 26 November 2026) - 921 CFR 211.192, Production record review, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- C/ part- 211/ subpart- J/ section- 211. 192 (read 26 November 2026) - 10Data Integrity and Compliance With Drug CGMP: Questions and Answers, Guidance for Industry, FDA, December 2018, questions 3, 4, 5, 7, 10 and 12. https:/
/ www. fda. gov/ media/ 119267/ download (read 26 November 2026) - 1121 CFR 11.50, Signature manifestations, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11/ subpart- B/ section- 11. 50 (read 26 November 2026) - 1221 CFR 11.70, Signature/record linking, eCFR. https:/
/ www. ecfr. gov/ current/ title- 21/ chapter- I/ subchapter- A/ part- 11/ subpart- B/ section- 11. 70 (read 26 November 2026) - 13Investigating Out-
of- Specification (OOS) Test Results for Pharmaceutical Production, Guidance for Industry, Revision 1, FDA, May 2022, sections III and IV. https:/ / www. fda. gov/ media/ 158416/ download (read 26 November 2026) - 14‘GXP’ Data Integrity Guidance and Definitions, Revision 1, MHRA, March 2018, sections 6.16, 6.19 and 6.20. https:/
/ assets. publishing. service. gov. uk/ media/ 5aa2b9ede5274a3e391e37f3/ MHRA_ GxP_ data_ integrity_ guide_ March_ edited_ Final. pdf (read 26 November 2026) - 15EudraLex Volume 4, Chapter 4: Documentation, European Commission, in operation since 30 June 2011. https:/
/ health. ec. europa. eu/ system/ files/ 2016- 11/ chapter4_ 01- 2011_ en_ 0. pdf (read 26 November 2026) - 16Warning Letter 320-26-117 to Reliance Life Sciences Private Limited, MARCS-CMS 730801, FDA, 18 August 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ reliance- life- sciences- private- limited- 730801- 08182026 (read 26 November 2026) - 17Warning Letter 320-23-20 to Intas Pharmaceuticals Limited, MARCS-CMS 652067, FDA, 28 July 2023. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ intas- pharmaceuticals- limited- 652067- 07282023 (read 26 November 2026) - 18Computer Software Assurance for Production and Quality Management System Software, Guidance for Industry and FDA Staff, FDA, 3 February 2026. https:/
/ www. fda. gov/ media/ 188844/ download (read 26 November 2026) - 19Stakeholders’ consultation on EudraLex Volume 4, Good Manufacturing Practice guidelines: Chapter 4, Annex 11 and new Annex 22, European Commission, July 2025. https:/
/ health. ec. europa. eu/ consultations/ stakeholders- consultation- eudralex- volume- 4- good- manufacturing- practice- guidelines- chapter- 4- annex_ en (read 26 November 2026) - 20EudraLex Volume 4, Good Manufacturing Practice guidelines, European Commission. https:/
/ health. ec. europa. eu/ medicinal- products/ eudralex/ eudralex- volume- 4_ en (read 26 November 2026) - 21The 3-year work plan for the Inspectors Working Group, January 2026 to December 2028, European Medicines Agency, 2026. https:/
/ www. ema. europa. eu/ en/ documents/ other/ 3- year- work- plan- inspectors- working- group_ en. pdf (read 26 November 2026)
