1The rule: section 704, on a risk-based schedule.
Section 503B(b)(4) of the FD&C Act makes an outsourcing facility “subject to inspection pursuant to section 374”, that is, section 704 of the Act, and says it “shall not be eligible for the exemption under section 374(a)(2)(A)”, which keeps a pharmacy’s records out of an inspection.1 So FDA may inspect what it could at a drug manufacturer: “all things therein (including records, files, papers, processes, controls, and facilities)”, though not financial, pricing or most sales and personnel data.2 The investigators present credentials and a written notice, Form FDA 482, Notice of Inspection, to “the most responsible individual at the firm”.2,
| When and how FDA inspects | Basis |
|---|---|
| On a risk-based schedule: compliance history, recalls, the drugs’ risk, inspection history including the last 4 years, registration to compound shortage drugs, other criteria | Rule: 503B(b)(4)(B) and (C) |
| The first inspection is planned once FDA confirms that production and distribution have started | Practice: FDA’s stated plan, list notes |
| The first inspection is full: all six systems, namely quality, facilities and equipment, materials, production, packaging and labeling, and laboratory controls | Guidance: CP 7356.040 Parts II and III |
| Compliance with “certain provisions of section 503B” may also be evaluated | Guidance: CP 7356.040 Part II |
| For cause: after complaints, serious adverse events or recalls | Guidance: CP 7356.040 Part II |
| A follow-up to a warning letter is a reinspection, with a fee of $21,427 in fiscal year 2027, invoiced afterwards and due within 30 days | Rule: 744J(4), 744K; Guidance: CP 7356.040 Part III |
| Records may be requested “in advance of or in lieu of an inspection” | Rule: 704(a)(4) |
FDA’s compliance program 7356.040 of January 2025 instructs the investigators. They should select high-risk products, including “products with excessive beyond use dates/expiry dates”, and organize observations by system. One weak system is enough: “An establishment is out of control if any one system is out of control”, and an inspection that finds one “should receive an initial OAI classification”.5 See NAI, VAI and OAI and 503B beyond-use dates.
What to expect during an FDA inspection covers the visit itself. On 24 November 2026, 42 of the 100 facilities on FDA’s list had not yet been inspected.4
2From the close-out to closed.
- The 483 comes before the investigators leave. Section 704(b) requires a written report “prior to leaving the premises”, and 704(c) a “receipt describing the samples obtained”.2 The compliance program has FDA’s report record the firm’s corrective actions, “accomplished or projected”, as discussed with management at the close, so what you say then goes on record.5
- The response clock is 15 business days. FDA’s draft guidance of March 2026, “Responding to FDA Form 483 Observations at the Conclusion of a Drug CGMP Inspection”, says establishments “are not required to respond”, but recommends one response within 15 business days, excluding weekends and federal holidays, counted from any amendment. On time, FDA “plans to conduct a detailed review of the response before determining whether to pursue subsequent action”; late, it “will not ordinarily delay regulatory action, such as issuing a warning letter”. Longer work goes in as a CAPA plan with dates, followed by written updates.9 See responding to a 483.
- Open while FDA decides. FDA’s inspection office makes the initial classification. CDER then assesses “the Form FDA 483, and other pertinent exhibits and documents”, a review that “may identify additional violations not documented on the Form FDA 483.”5
- A warning letter asks for a reply within a period it sets, “usually fifteen (15) working days” from receipt. A close-out letter “will not be issued based on representations that some action will or has been taken”: FDA verifies the corrections, usually by a follow-up inspection,10 which is a reinspection with its fee.6,
7 483 vs warning letter compares the two. - Closed. FDA sends the narrative of its report with an FMD-145 letter within 45 calendar days of closing an inspection.11
3What FDA’s list showed on 24 November 2026.
FDA’s list gives each facility’s last inspection date, which is the date of the 483, and the action based on it.4 Checking a 503B on FDA’s list reads it as a buyer.
| Action after the last inspection | Facilities, of 58 | What it means for the facility |
|---|---|---|
| Open | 30 | “FDA has not determined whether further action will be taken”; a median of 93 days so far, 6 past 180 |
| Response Letter | 15 | Concerns, no charging language, no reply requested; a median of 179 days, about six months, range 139 to 417 |
| Regulatory Meeting | 5 | FDA management meets the firm to explain the violations; a median of 230 days |
| Warning Letter | 3 | A letter FDA calls “informal and advisory”, asking for a reply; a median of 266 days |
| FMD-145 | 2 | Closed and the report released: one with no 483, 93 days later; one shows a 2023 letter. 6 rows mention one |
| Untitled Letter | 1 | Below the warning letter threshold; a reply requested, not required; 179 days |
| Warning Letter Closeout | 1 | Corrections verified; 412 days after the 483 |
| N/A | 1 | Inspected 20 November 2026; the cells are shifted and the last reads Open |
- Expect a 483, then months of waiting. 57 of the 58 had a 483 at their last inspection. Written updates fill the wait.
- On time is not enough. All 4 facilities whose row shows a warning letter (3 listed as the action, 1 closed out) had answered their 483 within 15 business days: Fresenius Kabi Compounding of Canton, Massachusetts, on day 14, and Pine Pharmaceuticals, SCA Pharmaceuticals and MedisourceRx on day 15. Their letters came 185 to 319 days after the 483.13,
14, 15, 16 - Close-out takes verification. Nubratori of Torrance, California, had a warning letter on 22 January 2025, a new inspection on 11 December 2025, and the close-out on 27 July 2026. MedisourceRx’s letter of 12 December 2025 was closed out on 27 July 2026, the same day as Nubratori’s, with no newer inspection listed.4,
17 - Houston. 2 of the 6 Houston facilities had been inspected, and both had response letters: Empower Pharma on 3 June 2026 and Wells Pharma of Houston on 12 November 2026.4
Method: we read the list of 24 November 2026 on 26 November 2026, took the first action in each of the 58 inspected rows, and counted days from the last inspection to that action, or to 24 November 2026 for open rows; for the warning letters we counted business days, excluding federal holidays, from the 483 to the first response each letter names.
4Inspection readiness and front-room record template.
| Field | Entry |
|---|---|
| Document number | [QA-INS-nnn] |
| Title | FDA inspection readiness and front-room record: [site] |
| Version | [1.0] |
| Effective date | [date approved] |
| Owner | [head of the quality unit] |
| Site | [registered outsourcing facility address] |
Purpose. Prepare for FDA inspections, record each as it happens, and track it to closed.
Scope. [Every FDA inspection, records request and remote assessment at this address.]
Responsibilities. The [head of the quality unit] hosts the front room; a [scribe] keeps the request log; the [back-room lead] retrieves records; [regulatory affairs] tracks the list, the clock, letters and fees.
| Part A: ready before the first inspection | Basis | Entry |
|---|---|---|
| A1. Registration current; FDA’s list shows this address | Rule: 503B(b)(1); Practice: check monthly | [date checked] |
| A2. Product reports filed each June and December; adverse event reports filed | Rule: 503B(b)(2) and (b)(5) | [last report dates] |
| A3. Self-inspection of all six systems, quality and production first | Guidance: CP 7356.040 Parts II and III | [date, gaps sent to CAPA] |
| A4. 503B conditions file for each product: bulks, copies, shortage, labels | Rule: 503B(a); Guidance: CP 7356.040 Part II | [record numbers] |
| A5. Highest-risk products named: longest dating, highest volume, complaints | Guidance: CP 7356.040 Part II | [products] |
| A6. Records retrievable, including those contractors hold | Rule: 704(a)(4); Practice: access written into each contract | [hours; contracts checked] |
| A7. Mock inspection with timed retrievals | Practice: before the first lot ships, then yearly | [date, slowest requests] |
| Part B: the inspection, from the front room | Basis | Entry |
|---|---|---|
| B1. Investigators’ names; credentials seen; Form FDA 482 received | Rule: 704(a)(1) | [date, time, copy filed] |
| B2. Purpose as stated: surveillance, reinspection or for cause | Guidance: CP 7356.040 Part II | [purpose] |
| B3. Every request entered in the request log below | Practice: a scribe in the front room | [requests, met the same day] |
| B4. Samples: receipt describing them; a matching set kept | Rule: 704(c); Practice: keep a matching set | [lot, quantity] |
| B5. Close-out: each observation read out; corrective action done or planned, with its date | Rule: 704(b); Guidance: CP 7356.040 Part V | [observations, dates] |
| B6. 483 or amendment date; response due in 15 business days, federal holidays excluded | Draft guidance: III.D, notes 15 and 16 | [483 date; due date] |
| Request: number, time, wording | Owner; record and version | Delivered: time; copy kept |
|---|---|---|
| [n, time, the investigator’s words] | [name; record, version] | [time; yes or no] |
| Part C: from the 483 to closed | Basis | Entry |
|---|---|---|
| C1. One response to every observation, with evidence or a CAPA plan with dates | Draft guidance: III.D | [date sent, business day] |
| C2. Communication plan: dated written updates for each commitment, with evidence | Draft guidance: III.B | [update dates] |
| C3. FDA’s list and compounding page checked for the action | Practice: weekly | [dates checked] |
| C4. Action received; a warning letter reply sent by the date the letter sets | Practice: FDA manual, RPM 4-1-10 | [type, date; reply due] |
| C5. Reinspection invoice paid within 30 days of its date | Rule: 744K; fiscal year 2027 fee notice | [invoice number, date paid] |
| C6. FMD-145 letter and report narrative received; inspection closed | Practice: FDA directive, FMD-145 | [date] |
Records kept. This record, the notice, the request log with copies of everything delivered, sample receipts, the 483, responses, FDA’s letters, invoices and the report narrative, for [the period set in the record retention SOP].
| Role | Name, signature and date |
|---|---|
| Prepared by | [name, regulatory affairs] |
| Reviewed by | [name, pharmacist in charge] |
| Approved by | [name, head of the quality unit] |
| Version | Change |
|---|---|
| [1.0, date] | [First issue] |
5How it runs in Seal.
In Seal’s inspection readiness, each request keeps its verbatim wording, agreed interpretation, owner, candidate evidence, redactions, response and delivery. The front room records the question and the interpretation; the back room searches, checks scope, verifies versions and routes the proposed response. A delivered package keeps its source record versions, as-of time, reviewers, approvers and recipient, so a later change to a record does not alter what the investigator was shown. Mock inspections use the same request log, so slow retrievals show up before FDA arrives.
Observations create commitments: the finding, cited requirement, response, interim controls, CAPA, owners and verification stay connected, and an action is not treated as closed because a response letter was sent. In 503B compounding, batch records with their signatures and deviations, environmental data with trend analysis, training and media fill results, and CAPAs with evidence that effectiveness was verified already exist, organized as the work happened, instead of being compiled while the investigator waits.
6Example: Exampla’s first FDA inspection.
Invented for illustration: Exampla Outsourcing LLC of Houston, registered on 4 March 2027 in the registration example, has shipped syringes since April 2027 and vials since May. On Tuesday 8 February 2028 two FDA investigators arrive for its first inspection. Record QA-INS-001, version 2.0:
| Row | Entry |
|---|---|
| A3, A7 | Self-inspection 15 November 2027; mock inspection 6 December 2027 |
| B1, B2 | 8:40, two investigators, credentials seen, notice filed; surveillance, all six systems |
| B3 | 52 requests in 8 business days, 51 met the same day; the certifier’s smoke study video took 26 hours, the median 1 hour |
| B5 | Thursday 17 February: 483 with 3 observations, each answered with a date |
| B6 | Due Friday 10 March; Washington’s Birthday, 21 February, not counted |
| C1 | Wednesday 8 March, business day 13: one response, evidence for 2 observations, a dated plan for 1 |
| C2 | Monday 10 April: update with three passing media fill runs |
| C3, C4 | Open from FDA’s next list update; response letter Tuesday 15 August, one concern left for the next inspection |
| C6 | Monday 21 August: FMD-145 letter and report narrative; closed |
The 483 lists three observations: vial media fills did not simulate the longest filling time of a 250-vial batch; the investigation of an ISO 5 viable count in syringe lot ES-28-01 did not assess vial lot EZ-28-001, filled in the same hood; and the smoke study was done at rest. At the close-out the head of quality dated each fix: the investigation by 24 February, a dynamic smoke study on 1 March, and three media fills at the longest time by 7 April.
- The slowest request was a record Exampla did not hold. The certifier kept the video, and the mock inspection had not asked for it. Row A6 now names contractor-held records.
- Customers read it too. FDA posts 503B 483s, and the hospital in the facility list example asked for the response on 22 February.17
7What goes wrong.
- Preparing for registration, not for the first shipment. FDA plans the first inspection once production and distribution have started, and it covers all six systems.
- Committing without updates. Each dated commitment needs a written update with the records behind it.
8What FDA cites.
“It is unclear if you have executed new media fills as we have not received an updated response.”
Wells Pharma of Houston, warning letter, 7 November 2025, after a 483 of 28 March 2025 answered on business day 30.18
“However, the adequacy of this corrective action cannot be fully evaluated until the modifications are fully implemented and supporting documentation, such as executed batch production records, are provided for assessment.”
Fresenius Kabi Compounding, doing business as Fagron Sterile Services, Canton, Massachusetts, warning letter, 12 May 2026, after a response on business day 14.13 Pine Pharmaceuticals of Tonawanda, New York, answered on business day 15 and was told on 7 August 2026: “We are unable to fully evaluate some of your corrective actions due to lack of adequate supporting documentation”.14
Form 483s at outsourcing facilities and 503B warning letters count what FDA cites.
AQuestions and answers
How soon after registering will FDA inspect a new 503B facility?
There is no fixed deadline. FDA’s list says a registered facility joins the list FDA intends to inspect on a risk-based schedule, and that FDA plans to inspect within a reasonable period once it confirms the facility has started producing and distributing drugs. On 24 November 2026, 42 of the 100 listed facilities had not yet been inspected, so prepare from the first lot shipped.
Is FDA’s first inspection of a 503B facility a full inspection?
Yes. FDA’s compliance program for outsourcing facilities selects the full inspection option for an initial inspection of a newly registered facility, covering all six systems: quality, facilities and equipment, materials, production, packaging and labeling, and laboratory controls. Later inspections of a facility with a good record may be abbreviated, covering at least three systems, always including quality and production.
What is a response letter on FDA’s outsourcing facility list?
A letter that tells a facility about outstanding concerns when a warning letter or regulatory meeting is not warranted. FDA’s notes say response letters carry no charging language and do not ask for a written response; if the facility replies, its corrective actions and the remaining concerns may be reviewed at a future inspection. On 24 November 2026, 15 of the 58 inspected facilities showed one.
What does FMD-145 mean on FDA’s outsourcing facility list?
It means FDA has closed the inspection and sent the facility the narrative of its establishment inspection report, under Field Management Directive 145. The directive sets 45 calendar days from closing, and an inspection that led to a warning or untitled letter is not released until it is closed. On the list of 24 November 2026, 2 rows list it first and 6 mention it; 3 of the 6 show it 1 to 11 days after a response letter.
Does responding to a 483 on time prevent a warning letter?
No. FDA plans a detailed review of an on-time response before deciding, but the response is judged on its evidence. On 24 November 2026, all 4 facilities whose row on FDA’s list showed a warning letter (3 listed as the action, 1 closed out) had answered their 483 within 15 business days, and the letters explained why the responses fell short, such as missing supporting documentation.
References18 sources
References
- 121 U.S.C. 353b (FD&C Act 503B), paragraphs (a), (b)(1), (b)(2), (b)(4) and (b)(5), United States Code, 2024 edition, the latest on GovInfo. https:/
/ www. govinfo. gov/ content/ pkg/ USCODE- 2024- title21/ html/ USCODE- 2024- title21- chap9- subchapV- partA- sec353b. htm (read 26 November 2026) - 221 U.S.C. 374 (FD&C Act 704), paragraphs (a)(1), (a)(2)(A), (a)(4), (b) and (c), United States Code, 2024 edition. https:/
/ www. govinfo. gov/ content/ pkg/ USCODE- 2024- title21/ html/ USCODE- 2024- title21- chap9- subchapVII- partA- sec374. htm (read 26 November 2026) - 3Investigations Operations Manual 2026, Chapter 5, Inspections, section 5.1.4.2.1, Written Notice, FDA, content current as of 15 July 2026. https:/
/ www. fda. gov/ media/ 166533/ download (read 26 November 2026) - 4Registered Outsourcing Facilities, table and notes, FDA, updated as of 24 November 2026. https:/
/ www. fda. gov/ drugs/ human- drug- compounding/ registered- outsourcing- facilities (read 26 November 2026) - 5Compliance Program 7356.040, Outsourcing Facility Inspections, Parts I, II, III, V and VII, FDA, issued 15 January 2025, listed on FDA’s Drug Compliance Programs page. https:/
/ www. fda. gov/ media/ 185146/ download (read 26 November 2026) - 621 U.S.C. 379j-61 (FD&C Act 744J), paragraph (4), definition of reinspection, United States Code, 2024 edition. https:/
/ www. govinfo. gov/ content/ pkg/ USCODE- 2024- title21/ html/ USCODE- 2024- title21- chap9- subchapVII- partC- subpart9- sec379j- 61. htm (read 26 November 2026) - 721 U.S.C. 379j-62 (FD&C Act 744K), paragraphs (a) and (c), reinspection fee, United States Code, 2024 edition. https:/
/ www. govinfo. gov/ content/ pkg/ USCODE- 2024- title21/ html/ USCODE- 2024- title21- chap9- subchapVII- partC- subpart9- sec379j- 62. htm (read 26 November 2026) - 8Outsourcing Facility Fee Rates for Fiscal Year 2027, 91 FR 48142, FR Doc. 2026-15342, sections III.B.3 and IV, FDA, 30 July 2026. https:/
/ www. federalregister. gov/ documents/ 2026/ 07/ 30/ 2026- 15342/ outsourcing- facility- fee- rates- for- fiscal- year- 2027 (read 26 November 2026) - 9Responding to FDA Form 483 Observations at the Conclusion of a Drug CGMP Inspection, draft guidance, sections III.B and III.D and notes 15 and 16, FDA, March 2026, docket FDA-2025-D-1504, draft, not for implementation. https:/
/ www. fda. gov/ media/ 191427/ download (read 26 November 2026) - 10Regulatory Procedures Manual, Chapter 4, Advisory Actions, sections 4-1, 4-1-8, 4-1-10 and 4-2-1, FDA, July 2024. https:/
/ www. fda. gov/ media/ 71878/ download (read 26 November 2026) - 11Field Management Directive 145, Release of the Establishment Inspection Report (EIR), DIR-000067, sections 2 and 5, FDA, revised 31 July 2019. https:/
/ www. fda. gov/ media/ 83055/ download (read 26 November 2026) - 12Regulatory Procedures Manual, Chapter 10, Other Procedures, section 10-3, Regulatory Meetings, FDA, October 2021. https:/
/ www. fda. gov/ media/ 71765/ download (read 26 November 2026) - 13Fagron BV, for Fresenius Kabi Compounding, LLC dba Fagron Sterile Services, Canton, Massachusetts, warning letter, MARCS-CMS 724551, FDA, 12 May 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ fagron- bv- 724551- 05122026 (read 26 November 2026) - 14Pine Pharmaceuticals, LLC, warning letter, MARCS-CMS 728537, FDA, 7 August 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ pine- pharmaceuticals- llc- 728537- 08072026 (read 26 November 2026) - 15SCA Pharmaceuticals, LLC, warning letter, MARCS-CMS 724202, FDA, 14 September 2026. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ sca- pharmaceuticals- llc- 724202- 09142026 (read 26 November 2026) - 16MedisourceRx, warning letter, MARCS-CMS 717970, FDA, 12 December 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ medisourcerx- 717970- 12122025 (read 26 November 2026) - 17Compounding: Inspections, Recalls, and other Actions, entries for Nubratori, MedisourceRx and Wells Pharma of Houston, FDA, content current as of 22 October 2026. https:/
/ www. fda. gov/ drugs/ human- drug- compounding/ compounding- inspections- recalls- and- other- actions (read 26 November 2026) - 18Wells Pharma of Houston, LLC, warning letter, MARCS-CMS 713015, FDA, 7 November 2025. https:/
/ www. fda. gov/ inspections- compliance- enforcement- and- criminal- investigations/ warning- letters/ wells- pharma- houston- llc- 713015- 11072025 (read 26 November 2026)