{"description":"Fictional projection of documented BOM revision fields for one planned finished unit. The quantity basis is supplied separately from the confirmed BOM/item configuration. The destination is a proposed Seal record design, not an API request or a captured customer response.","source":{"revision":{"id":"215","billOfMaterials":{"id":"410"},"component":{"items":[{"id":"7","item":{"id":"870"},"bomQuantity":2.5}]}},"confirmedQuantityBasis":{"unit":"kg","perFinishedUnit":1}},"proposedDestination":{"batch":"B-610","definition":{"source":"NetSuite","bom":"410","revision":"215"},"component":{"sourceLine":"7","item":"870","plannedQuantity":2.5,"unit":"kg","basis":"per finished unit"},"actualUse":{"event":"USE-610-007","container":"C-610-04","quantity":2.4,"unit":"kg"}},"interpretation":"The planned 2.50 kg remains in the definition. The 2.40 kg execution event is separate evidence; the 0.10 kg variance can be reviewed without editing the source requirement. Refreshing the definition must not replace the physical-use event or its container reference."}